* commit 'd7d7808302f3bd8045ee3d7afff55a066635f463': (27 commits)
Bind Copilot profile v18 to admission diagnostics
Synchronize admission diagnostic tests with runtime entry
fix(server): permit verified question-delivery history to sleep (#15851)
Preserve safe ACPX admission stages on startup timeout
fix: preserve admitted user turns across legacy recovery sweeps
perf(ci): prefetch the consumer image and Grok binary during package staging (#15849)
fix: classify pinned sidecar admission failures safely
fix: preserve pre-provider recovery after verification outages
fix: preserve Stop through computer admission retry races
fix: allow bounded cold verification of persistent computer packs
fix: resume new input after paused computer admission retries
fix: align workspace CI partition with upstream contract
fix: support upstream workspace CI partition
fix: distinguish provider cache mismatches from unavailable verification
fix: preserve Boat wait ownership and honor Stop across retries
perf(ci): run the db project as its own workspaces-c lane (#15831)
fix: defer Boat admission while provider stop is pending
Preserve controller-owned provider pack authority across cold resume
Keep Boat reconnect unavailable until attachment succeeds
Validate retained packages against the active provider contract
...
Treat completed question-response deliveries as history only after their exact same-company handoff finishes. Preserve missing evidence, retries, accounting debt, and idle-sleep fences.
Add a concurrent all-state question history index with interrupted-build repair. Keep migrations serialized without waiting snapshots that deadlock concurrent index builds.
Validated by 118 focused sleep tests, six migration/snapshot tests, full repository typecheck, all CI gates, and Apex 5/5.
Co-Authored-By: Paperclip <noreply@paperclip.ing>
## Thinking Path
> - Paperclip is the open source app people use to manage AI agents for
work
> - Pull requests to this repository run a large CI matrix. The slowest
check sets the time a contributor waits for a green run.
> - After #15826 leveled the server shards and #15831 split
`workspaces-b`, the `Build` lane is the slowest check: 634s in run
38107578322 (2026-10-11 03:11Z), ahead of the next server shard at 574s.
It was 533s in run 38107430861 and 543s to 568s in earlier runs that
night.
> - `Build` is about 100s of setup, 148s to 195s of `pnpm build`, and
278s to 320s of `scripts/verify-grok-npm-install.mjs`. The verifier
stages and packs the public packages first (84s to 100s of CPU work),
and only then pulls the pinned `node:24-trixie` consumer image (8
layers, 440 MB compressed) and downloads the Grok binary (65 MB gzip,
166 MB verified). Both network waits sit after the staging work on the
critical path.
> - Neither download depends on the packed packages. The image is pinned
by digest and the Grok binary is checked against its pinned sha256 by
the provisioning script, so starting them early changes no verified
property.
> - This pull request starts both downloads as background children
before staging and joins them where they are needed: the image before
the first sandbox, the binary after the negative probe. It also prints
one timing line per phase so the next slow part is visible in the CI
log.
> - The benefit is that the whole pull and the whole Grok download hide
behind the staging phase. The verifier should shed the full pull time on
a fresh runner, and the next cycle can read the phase split instead of
inferring it from log gaps.
## Linked Issues or Issue Description
**Describe the enhancement**
The `Build` PR check is now the slowest check in the run. Its last step,
the public npm install verifier, pulls the consumer Docker image and
downloads the Grok binary only after it has finished staging and packing
the eighteen public packages. Both downloads could run while the
packages are staged.
**Why is this needed**
The slowest check decides the wall-clock time of every PR run. In the
most recent fully green run (38107578322), `Build` took 634s: `pnpm
build` 195s and the verifier 320s. The verifier's log shows the staging
phase ends at +100s and the Grok result arrives at +267s. The image pull
and the Grok download are inside that second window, in series with the
consumer install and the probes.
**Proposed solution**
Start `docker pull --platform linux/amd64 <pinned image>` and
`provision-grok.mjs` as background children at the top of the verifier,
before the staging loop. Await the image right before the first sandbox
call. Provision Grok into a prefetch directory and rename it into
`native/grok` only after the "npm must not provision Grok" assertion and
the negative probe, so that assertion keeps its meaning and only the
positive probe sees the binary. Print a
`paperclip.public-npm-install.timing.v1` line with wall time per phase
and the time the main flow waited on each prefetch.
**Alternatives considered**
- Run the verifier as its own job in parallel with `Build`. It needs the
full `pnpm build` output, so that job would be as long as `Build` is
now.
- Warm the consumer npm cache from an Actions cache. That changes the
"clean public npm install" property the verifier reports. Not done here;
the new timing line will show whether the consumer install is worth that
discussion.
- Pack the eighteen packages concurrently. The three bundled packages
run their own npm installs in series inside `prepareBundledPackage`,
which is synchronous. A larger restructure; left for a later cycle with
timing data.
- Overlap the Pi runtime setup with the Grok probes. Both use the same
consumer directory from separate containers, and the probes after
provisioning are short. Not worth the concurrency on shared state.
## What Changed
- `scripts/prefetch-child.mjs` (new): `startPrefetch({ name, cmd, args,
cwd, env, logPath })` spawns a background child with no inherited
terminal and its stdout and stderr in a log file, and returns `{ name,
child, done, durationMs }`. `done` resolves on exit 0 and otherwise
rejects with the tail of the log; the rejection is observed inside the
helper, so an unawaited failure never becomes an unhandled rejection.
`durationMs` ends at the child's last write to its log (the exit event
is observed late when the caller is blocked in synchronous work; both
downloads print their final status line as they complete).
`stopPrefetches(prefetches, { graceMs })` sends `SIGTERM` to every child
still running, escalates to `SIGKILL` after the grace period, and
resolves only once all of them have exited.
- `scripts/verify-grok-npm-install.mjs`: the image pull and the Grok
provisioning start through the helper inside the `try` block, before the
staging loop. The main flow awaits the image before the first `npm
install` sandbox and awaits Grok after the negative probe, then renames
the staged binary into `native/grok` before the positive probe. The
`finally` block awaits `stopPrefetches` and only then removes the
scratch root, so cleanup never races a child's writes. The script prints
one timing JSON line after the Pi probe, with the per-phase wall times,
the two `*_wait_ms` values, and the corrected `*_prefetch_ms` values.
- `scripts/__tests__/prefetch-child.test.mjs` (new): seven tests run
small local Node children, with no Docker or network: a successful
prefetch resolves and keeps its output; the duration ends at the
download even when the parent is blocked for 1.5s; a nonzero exit
rejects with the log tail; a command that cannot start rejects instead
of hanging the join or the stop; stopping a running child waits for its
exit; a child that ignores `SIGTERM` is killed after the grace period;
an unawaited failure does not produce an unhandled rejection in a fresh
process.
- `scripts/__tests__/grok-public-install-sandbox.test.mjs`: the source
test asserts that exactly the pinned image is pulled for `linux/amd64`,
that Grok is provisioned into the prefetch directory and never straight
into `native/grok`, that both prefetches start before staging, that the
image is joined before the first sandbox, that the rename happens after
the npm assertion and the negative probe and before the positive probe,
that the verifier imports the helper, and that `stopPrefetches` is
awaited before the single `rmSync(root, ...)`.
- `package.json`: `test:release-registry` runs the new test file.
## Verification
- `node --test scripts/__tests__/prefetch-child.test.mjs
scripts/__tests__/grok-public-install-sandbox.test.mjs
scripts/__tests__/cursor-public-install-sandbox.test.mjs
scripts/__tests__/retain-runner-qualification-packages.test.mjs`: 22
pass (7 new in `prefetch-child.test.mjs`, 12 in the sandbox file). The
new file passed on three consecutive runs.
- `node --check scripts/verify-grok-npm-install.mjs` passes.
- `node packages/paperclip-runner/scripts/provision-grok.mjs
<scratch>/prefetch/grok` on this host: `Verified Grok 1.0.13
(linux-x64)` in 1.0s, `native/grok` absent before the move, 166079904
bytes in place after it.
- Docker is not installed on the host that produced this PR, so the
verifier was not run end to end locally. This PR's own `Build` job runs
`node scripts/verify-grok-npm-install.mjs` from the branch checkout, so
it exercises the change in full.
**Measured on this PR's first CI run**
([38108964834](https://github.com/paperclipai/paperclip/actions/runs/38108964834),
created 03:37Z), against two `master` runs created in the same twelve
minutes:
| | 38108878166 (`master`, 03:35Z) | 38108995800 (`master`, 03:37Z) |
38108964834 (this PR, 03:37Z) |
| --- | --- | --- | --- |
| Verifier step | 307s | 248s | 219s |
| `Build` job | 555s | 484s | 459s |
| Slowest check in the run | `Build` 555s | server (8/12) 535s | server
(12/12) 547s |
The PR run's timing line: `stage_packages_ms 84464`, `image_wait_ms 1`,
`consumer_install_ms 97305`, `lifecycle_rebuild_ms 3545`,
`codex_probe_ms 1211`, `grok_wait_ms 0`, `grok_probes_ms 626`,
`pi_setup_ms 22194`, `pi_probe_ms 7753`. Both waits are at most 1ms, so
the staging phase hid both downloads in full. The window from the end of
staging to the Grok result went from 161s to 167s on the two runs that
motivated this PR to 102s here, so the hidden downloads were about 60s
on a fresh `runs-on` spot instance. Against the two same-window `master`
runs, the verifier step is 29s to 88s shorter and `Build` is 25s to 96s
shorter; the spread is runner variance in `pnpm build` and the consumer
install.
The `image_prefetch_ms` and `grok_prefetch_ms` values on that first run
(84550 and 186696) were the parent's late observation of each exit, not
download times; that is the first Greptile finding, fixed by the second
commit, which measures from the download's last output instead.
## Risks
- Low risk. The verifier proves the same properties in the same order.
The only ordering change is that the downloads start earlier; every
assertion, probe, and sandbox argument is unchanged.
- The Grok binary is written under the scratch root in a `prefetch`
directory during staging. That directory is never mounted into a
container, and the `native/grok` assertion still runs against an absent
path.
- A prefetch that fails early now fails the step at its join point,
where the old code would have failed at the same download a few seconds
later. Same outcome, same message source.
- `*_prefetch_ms` is a last-output time. A child that printed early and
then kept working silently would be under-reported; neither `docker
pull` nor `provision-grok.mjs` behaves that way (both print their final
status as they finish), and a silent child falls back to the observed
exit time.
- Cleanup now waits up to 5s for a child that ignores `SIGTERM` before
killing it, so a failing run can end up to 5s later than before. Both
children exit promptly on `SIGTERM` in practice.
- The timing line is one more stdout line. Nothing in the repository
parses the verifier's stdout; the two workflows that run it write the
output to the job log or to a file.
## Model Used
- Claude (Anthropic), model ID `claude-fable-5-1`, running as a
Paperclip agent through the Claude local adapter with tool use (shell,
file edits, GitHub CLI). The agent collected the CI data, made the
change, ran the tests, and wrote this description.
## Checklist
- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [ ] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge
🤖 Generated with [Claude Code](https://claude.com/claude-code)
---------
Co-authored-by: devinfoley <139239+devinfoley@users.noreply.github.com>
Co-authored-by: Claude Fable 5.1 <noreply@anthropic.com>
## Thinking Path
> - Paperclip is the open source app people use to manage AI agents for
work
> - Pull requests to this repository run a large CI matrix. The slowest
check sets the time a contributor waits for a green run.
> - The `General tests (workspaces-b)` lane runs every non-server Vitest
project except `ui` and `cli` in one job, one project after the other.
After #15826 leveled the server shards, this lane became the slowest
check: 593s in run 38084171761, 523s in 38083084276 and 499s in
38083020834 (all 2026-10-10).
> - The `@paperclipai/db` project alone is 168s to 250s of that lane's
436s to 513s of vitest time. Its `client.test.ts` suite is 117s to 189s
and `backup-lib.test.ts` is 70s to 107s. The other seventeen projects
together are only 263s to 276s.
> - Vitest's native `--shard` does not level this lane. The db project
is already file-parallel, and a hash-ordered slice can put both slow
suites on one runner.
> - This pull request moves the db project into its own `workspaces-c`
lane in both `pr-trusted.yml` and `release-verify.yml`. The runner
script gains a `general-workspaces-c` group, and `general-workspaces-b`
drops the db project.
> - The benefit is that both lanes should finish in about 230s to 340s
instead of 499s to 593s, and `workspaces-b` leaves the critical path.
The cost is one more job per run, about 60s of setup.
## Linked Issues or Issue Description
**Describe the enhancement**
The `General tests (workspaces-b)` PR check is the slowest check in the
run. It runs seventeen Vitest projects in sequence on one runner. The
`@paperclipai/db` project is one third to one half of its vitest time.
**Why is this needed**
The slowest check decides the wall-clock time of every PR run. In the
last three fully green runs on the current server-shard manifest,
`workspaces-b` took 499s, 523s and 593s (runs 38083020834, 38083084276
and 38084171761, 2026-10-10). The next slowest lanes, `Build` and the
server shards, sit at about 480s to 570s. A split of `workspaces-b`
removes 170s to 250s from this lane.
**Proposed solution**
Run the `@paperclipai/db` project as its own lane,
`general-workspaces-c`. Keep the other seventeen projects in
`general-workspaces-b`. Add the lane to both the PR and the release
verification matrix. Extend the guard tests so the three workspace lanes
still cover the root Vitest project list exactly once, so the new group
rejects shard flags, and so both workflows carry the lane unsharded.
**Alternatives considered**
- Vitest native `--shard` on `workspaces-b`, as `workspaces-a` does. The
db project is already file-parallel and its wall time is set by two long
suites, so a hash-ordered slice does not give a predictable split.
- Move `adapter-utils` (115s to 117s) into the new lane as well. That
makes the db lane 285s to 366s of tests and the rest 147s to 160s, which
is less level than db alone (168s to 250s) against the rest (263s to
276s).
- Three lanes. Not needed now: after this split both lanes sit under the
server shards and `Build`, so a third runner would not shorten the run.
## What Changed
- `scripts/run-vitest-stable.mjs`: new `general-workspaces-c` group that
runs `@paperclipai/db` alone. `general-workspaces-b` now excludes it.
Local `--mode all` runs all four general groups, so every project still
runs once. The dry-run output reports the new group's projects.
- `.github/workflows/pr-trusted.yml`: a `workspaces-c` entry in the
general tests matrix, with a comment that records the 2026-10-10
measurements.
- `.github/workflows/release-verify.yml`: the same `workspaces-c` entry,
to keep parity with the PR workflow.
- `scripts/__tests__/run-vitest-stable-shard.test.mjs`: the coverage
test includes the new group; shard flags are rejected for both
`workspaces-b` and `workspaces-c`; a new test asserts that
`workspaces-c` runs only the db project, that `workspaces-b` no longer
carries it, and that both workflows list both lanes without shard
arguments. The workflow check parses each `- group:` matrix entry with
comment lines removed, so a comment between keys cannot hide a shard
setting, and it first confirms the parser sees the shard keys on the
`workspaces-a` entries. A small parser test covers the
comment-between-keys case (Greptile P2).
- `scripts/__tests__/release-verify-workflow.test.mjs`: the release
workflow must carry `general-workspaces-c`.
## Verification
- `GITHUB_WORKFLOW= node --test
scripts/__tests__/run-vitest-stable-shard.test.mjs`: 32 pass (was 29).
- `node --test scripts/__tests__/release-verify-workflow.test.mjs`: the
workflow parity test passes. Two unrelated tests in that file (`a
publisher lockfile lets a fresh smoke install retain validation after
... drift`) fail on my machine on pristine `master` too, because `pnpm`
is not on its PATH. They pass in CI.
- `node scripts/run-vitest-stable.mjs --mode general --group
general-workspaces-c --dry-run` reports `["@paperclipai/db"]`; `--group
general-workspaces-b` reports the other seventeen projects.
- Both workflow files parse as YAML; the general tests matrix has 19
entries in `pr-trusted.yml` and 17 in `release-verify.yml`.
- This PR's own run exercises the script change but not the workflow
change: `pr.yml` calls `pr-trusted.yml@master`, so the matrix comes from
`master` and the `workspaces-c` job appears only on PR runs created
after the merge. Because the script comes from this branch, the
`workspaces-b` job in this PR's run (38090713637) ran the seventeen
remaining projects and finished in 340s, inside the expected 325s to
340s band. No job in that run ran `@paperclipai/db`.
- To cover the gap, I ran the new lane locally with the same command CI
uses, `pnpm test:run:general -- --group general-workspaces-c`: 49 test
files, 180 tests, all passed, 111s of vitest time (c324d0080, Node 25,
PGlite).
Expected result on the first PR run after merge, from the three measured
runs:
| Check | Before | After (expected) |
| --- | --- | --- |
| `General tests (workspaces-b)` | 499-593s | ~325-340s (263-276s of
vitest time plus ~60s of setup) |
| `General tests (workspaces-c)` | (new) | ~230-310s (168-250s of vitest
time plus ~60s of setup) |
| Slowest check in the run | `workspaces-b` | `Build` (497-570s) or a
server shard (~480-520s) |
## Risks
- Low risk. The group split only changes which job runs the db project.
The guard test asserts that the three workspace lanes cover the root
Vitest project list exactly once, so a project cannot be dropped or run
twice.
- One more job per PR and release verification run, about 60s of setup
time on the runner fleet.
- The lane names are matrix labels only. The required checks are `ci /
verify` and `ci / e2e`, which aggregate the matrix, so no branch ruleset
needs an update.
## Model Used
- Claude (Anthropic), model ID `claude-fable-5-1`, running as a
Paperclip agent through the Claude local adapter with tool use (shell,
file edits, GitHub CLI). The agent collected the CI data, made the
change, ran the tests, and wrote this description.
## Checklist
- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [ ] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge
🤖 Generated with [Claude Code](https://claude.com/claude-code)
---------
Co-authored-by: Bender (Fable) <noreply@anthropic.com>
Co-authored-by: devinfoley <139239+devinfoley@users.noreply.github.com>