Files
PaperClipAI/doc
DottaandClaude Opus 5.5 aeafc6a190 fix(google-workspace): adopt Google's definitions over any shipped REST definition after the switch back (#22874)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work
> - Agents use Google Workspace through a connection whose catalog rows
save each action's definition, and a catalog refresh holds a changed
definition for review
> - #22815 moved Gmail, Drive, Docs, Sheets, Slides and Calendar from
Paperclip's REST tools back to Google's MCP servers
> - It said that the first refresh after the switch replaces saved REST
definitions with no hold, but it recognised only the current REST
schemas
> - Rows saved by the first REST launch (#22634) carry older schemas, so
the refresh held 34 of 36 actions on a staging test instance and agents
lost all Google actions
> - This pull request recognises every shipped REST schema, so the
switch back holds none of these actions
> - The benefit is that the switch back keeps agents working with no
admin review, and a Google definition that Paperclip never shipped is
still held

## Linked Issues or Issue Description

Refs #22815

**What happened?**

On a staging test instance (build 1b4ebec), a Google Workspace
connection ran on the REST tools since Nov 23. After the deploy, the
first catalog refresh set 34 of 36 Google actions to `quarantined` with
`pending_review`. Agents lost every Google action until an admin reviews
them. `gmail__list_threads` and `gmail__search_messages` became
`disabled` with `mcp_tool_removed`, which is expected.

Root cause: `formerPaperclipDefinedTool` compared the saved schema hash
with the hash of the REST definition in the current build only. #22706
changed all 36 REST input schemas (it adds `additionalProperties:
false`, and it changes `list_threads` and `search_threads`). A row that
a refresh saved on a #22634 build, and that no refresh updated after
#22706, has a #22634 hash. I computed the hashes from the code at
b865dd1 (#22634), 6a07420 (#22706) and master: all 36 hashes differ
between #22634 and #22706, and master equals #22706. So every saved row
failed the match, and the refresh held it.

**What did you expect to happen?**

The refresh saves Google's definitions with no hold. It keeps Off, Ask
first and the review fields of each action.

**Steps to reproduce**

1. Connect Google Workspace on Google's MCP servers.
2. Switch the six services to `paperclip_rest` and refresh the catalog.
3. Make the saved rows carry the #22634 input schemas (a refresh on a
#22634 build does this).
4. Switch back to `google_mcp` and refresh the catalog.
5. See that every action is `quarantined` with `pending_review`.

## What Changed

- `server/src/google-workspace-rest-tools/shipped-schema-hashes.ts`
lists the input schema hash of each REST tool for each shipped revision
(#22634 and #22706).
- `shippedPaperclipSchemaHashes` replaces `formerPaperclipDefinedTool`.
A refresh does not hold an action when its saved schema hash is in that
list.
- No automatic repair for actions that are already held. The hold
replaced the saved definition with Google's, so the row does not show
its earlier definition. I tried a release from call history
(`tool_invocations.catalog_schema_hash` after the last successful
refresh before the hold). Review showed that a refresh can save rows and
stop before it writes its success audit (for example, at a restart).
Then a call from before that refresh can wrongly prove a later Google
change. No other record proves the earlier definition, so there is no
safe automatic signal. These actions stay held, and a person reviews
them. A test shows this.
- `fixtures/input-schemas-22634.json` keeps the #22634 schemas for the
tests.
- The folder README and `doc/memory/google-connector-memory.md` describe
the change.

## Verification

- `pnpm exec vitest run
src/__tests__/google-workspace-mcp-transport.test.ts` (in `server/`): 25
tests pass with the boundary test.
- Red before the fix: "adopts Google's definitions with no hold when the
rows carry the #22634 REST definitions" failed with 10 of 10 actions
held.
- The tests run the real catalog refresh against a fake Google that
serves REST and MCP. They follow the history: MCP rows, then REST rows
(#22634 and #22706), with review fields, Off and Ask first, then the
switch back.
- "holds for review a Google definition that Paperclip never shipped": a
saved hash that Paperclip never shipped is held at the switch, and a
later change in Google's schema is held.
- "keeps an action that a switch before this fix held for review held":
a later refresh does not release an action that an earlier switch held.
- `src/services/google-workspace-rest-dispatch.test.ts`: the list
contains the current hash of every REST tool, and the hash of every
#22634 schema in the fixture.
- `pnpm verify` exited 2 (the README is a broad input). I ran the 21
test files that use the catalog refresh or the REST dispatch. All pass
except `email-channels.integration.test.ts`, which fails in this
worktree because a bundled skill file is not on disk. That file does not
touch this change. Required CI covers the rest.

## Risks

- Connections that a switch already held (the staging test instance)
keep those actions held. An admin must review them.
- A future change to a REST schema must add its hash to the list. A test
fails when it is missing.
- No migration. No change for connections that are not Google Workspace.

## Model Used

- Claude Opus 5.5 (`claude-opus-5-5`), Anthropic, in Claude Code with
tool use (shell, file edits, test runs).

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

🤖 Generated with [Claude Code](https://claude.com/claude-code)

---------

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-24 22:40:57 -06:00
..
…
…
…
…