docs(runner): authorize phase 6 integration
This commit is contained in:
1 parent
7fa15aaaf8
commit
30c2aa39a9
2 files changed
+11
-3
No files matched your search
@@ -411,6 +411,11 @@ conditionally authorized, but its issue graph remains uncreated until the Phase
|
||||
|
||||
**Precondition:** explicit board acceptance of Phases 0–5 and CTO approval of the integration design. No production integration issue starts before this gate.
|
||||
|
||||
**Gate status (2026-08-09):** the board accepted Phase 5 and authorized Phase 6
|
||||
to start. Create the Phase 6 issue graph now, but keep implementation blocked on
|
||||
the integration design and keep QA blocked on implementation plus the mandatory
|
||||
Security and CTO reviews.
|
||||
|
||||
**Deliverables:**
|
||||
|
||||
- Paperclip implementation of `ControlPlanePort`/`NativeSessionBackend` in a narrow integration package or service boundary;
|
||||
|
||||
@@ -6686,12 +6686,15 @@ tutorial, screenshots, OKF evidence, reviews, and QA. The board conditionally
|
||||
authorized that transition on 2026-08-08, so no additional planning approval is
|
||||
required after those gates pass. Phase 5 generalizes the accepted browser proof
|
||||
into a stable TypeScript SDK, reusable component contracts, and a second minimal
|
||||
consumer application. Phase 6 remains the first Paperclip control-plane
|
||||
integration phase.
|
||||
consumer application. The board accepted Phase 5 on 2026-08-09 and authorized
|
||||
Phase 6 to start. Phase 6 is the first Paperclip control-plane integration phase
|
||||
and must remain a thin, feature-flagged adapter over the package contracts proven
|
||||
by the standalone mock-core path. It must not move runner responsibilities into
|
||||
the core or change the default legacy adapter path.
|
||||
|
||||
## 30. Dependency sequencing
|
||||
|
||||
The phase dependency graph, task-creation gates, owner guidance, per-phase completion contract, and retained issue-sized future backlog are maintained in [`paperclip-native-runner-implementation-plan.md`](./paperclip-native-runner-implementation-plan.md). Phase 4 is complete and accepted, and Phase 4b execution is authorized. The current order is parallel Phase 4b lowest-layer protocol/server and UX decision work, then browser implementation, Security and CTO reviews, QA and live-service evidence, the Phase 4b human checkpoint, and only then the conditionally authorized Phase 5 issue graph. Do not create Phase 5 tasks before the complete Phase 4b checkpoint passes.
|
||||
The phase dependency graph, task-creation gates, owner guidance, per-phase completion contract, and retained issue-sized future backlog are maintained in [`paperclip-native-runner-implementation-plan.md`](./paperclip-native-runner-implementation-plan.md). Phases 0–5 are complete and accepted. The board authorized Phase 6 on 2026-08-09. The current order is Phase 6 integration design, thin feature-flagged adapter implementation, mandatory Security and CTO reviews, QA of native and legacy paths, and the Phase 6 human checkpoint. Phase 7 remains gated until that complete checkpoint passes.
|
||||
|
||||
---
|
||||
|
||||
|
||||