## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Pull request CI verifies every change before merge across typecheck, build, server/DB/UI unit tests, and Playwright E2E shards. > - Today PR CI takes 15–30+ minutes wall-clock on ordinary feature and fix PRs (such as #22626) because every PR runs release/packaging/runner-support bloat, boots 800+ separate embedded Postgres clusters, runs Vitest serialized shards and E2E shards at 1 worker, builds the UI 8 separate times for E2E, emits 52 MB of React `act(...)` stderr spam in UI tests, and runs 61 real-clock soak suites plus hundreds of historical one-time SQL migration and mocked component wiring tests. > - Slow PR CI delays developer feedback, wastes runner capacity, and encourages batching changes instead of shipping small, safe PRs. > - This pull request cuts PR CI across all 6 bottlenecks (pipeline routing/Build bloat, PR-scoped parallel typecheck, shared embedded Postgres + batched/parallel Vitest runner, parallel E2E shards + prebuilt UI cache, historical/soak DB+server pruning with a checked-in nightly manifest, and UI stderr cleanup + low-value test pruning) while preserving all core control-plane invariants and full post-merge/release coverage. > - The benefit is projected PR CI wall-clock drops from 15–30+ minutes to ~3.8–4.4 minutes on ordinary PRs while keeping `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and `full-ci` runs at full coverage. ## Linked Issues or Issue Description Refs #22626. **What existing behavior does this improve?** Trusted pull-request CI wall-clock duration and runner efficiency across `.github/workflows/pr-trusted.yml`, `turbo.json`, `scripts/ci-typecheck-lane.mjs`, `scripts/run-vitest-stable.mjs`, `tests/e2e/`, `packages/db`, `server`, and `ui` test suites. **Subsystem affected** Cross-cutting (multiple of the above) **Current behavior** Ordinary PRs take 15–30+ minutes wall-clock in PR CI: - `Build` (~7.5–8.0m) runs a 231s clean public npm Grok install verifier and a 57s embedded-Postgres boot smoke on every PR. - `Canary Dry Run` (6.2m), `Runner support suite` (7.9m), `Docker context integrity`, `General tests (chat 1–3/3)`, and `Verify Paperclip Runner (vitest package 1–3/3)` fan out on ordinary app PRs due to broad `turbo.json` inputs. - `Typecheck + Release Registry` (7.1m) runs `test:release-registry` (193s), all standalone sandbox provider installs/checks, all untouched `tests/*` projects, and `--singleThreaded` `tsc` on every PR. - `General tests` and `Verify serialized server suites` boot 800+ separate embedded Postgres clusters instead of using `packages/db/src/test-postgres-command.ts`, run 17 serial Vitest invocations in `workspaces-b`, and run `verify_serialized_server` with `--no-file-parallelism --maxWorkers=1`. - `e2e_shards` (8.6m slowest shard) rebuilds the UI 8 separate times and forces `workers: 1` across all 56 specs because 7 specs mutate instance-level flags. - `workspaces-a` (8.3m × 2 shards) emits ~52 MB of React `act(...)` / `IS_REACT_ACT_ENVIRONMENT` stderr spam and executes 992 UI test files (including hundreds of brittle mocked wiring / `renderToStaticMarkup` suites). - `packages/db` and `server` run 43 historical one-time SQL migration replay tests, 12 static prose-grep tests, and 61 real-clock soak/crash/lease-expiry suites (~108.5 CPU-min) on every PR. **Proposed behavior** Ordinary PRs complete in under 5 minutes wall-clock while preserving full control-plane invariant coverage and full `master`/`release-verify`/`cloud-readiness`/`full-ci` verification: - PR `Build` removes the 231s Grok clean-npm verifier (already covered in `release-smoke.yml` and `docker-runner-check.yml`) and gates the 53s boot smoke on `PAPERCLIP_CI_FULL=1` (keeping fast `build:runtime` on every PR). - `turbo.json` and `.github/ci-task-matrix.json` path-gate `Canary Dry Run`, `Runner support suite`, `Docker context integrity`, `general-chat`, `ci:runner-package`, `ci:workspaces-a`, and `ci:db`, and narrow `tests/**` out of `globalDependencies`. - `Typecheck + Release Registry` uses fail-closed PR-mode scoping (`CI_PLAN`, `PAPERCLIP_CI_BASE_SHA`, `PAPERCLIP_CI_FULL`), parallel `typecheck-test-programs.mjs`, and `--checkers` / `GOMAXPROCS=2` within the 15.7 GiB RAM budget. - `run-vitest-stable.mjs` automatically wraps Postgres-backed lanes with one shared embedded Postgres template server (`test-postgres-command.ts`), batches `workspaces-b` and `workspaces-a` into single multi-project Vitest invocations, parallelizes isolated `serialized` shards, and filters `scripts/ci/nightly-only-suites.json` in PR mode (respecting `PAPERCLIP_CI_FULL=1`). - `e2e_shards` restores a read-only exact-key `server/ui-dist` cache written on canonical `master` pushes (`PAPERCLIP_E2E_SKIP_UI_BUILD=1`, inline fallback on UI PRs), isolates the 7 flag-mutating specs onto 2 serial shards while running the other 6 shards at `workers: 3` + `fullyParallel: true`, prunes 5 legacy/screenshot specs, and replaces fixed 20s/30s sleeps with deterministic waits. - `ui/vitest.setup.ts` eliminates >99.9% of stderr spam (`IS_REACT_ACT_ENVIRONMENT = true`, clean localStorage/DOM stubs, targeted `act(...)`/`No queryFn` suppression) and prunes 445 low-value mocked/presentational/screenshot UI tests + slims 2 giant mocked suites (keeping all `ui/src/lib`, `api`, `hooks`, `context`, `adapters`, `features`, `plugins`, and privacy/authz tests). - `packages/db` and `server` prune 43 historical one-time SQL migration tests, 12 static prose-grep tests, and 28 redundant `it.each` cases in `chat-channels.integration.test.ts`, and classify 61 real-clock soak/restart/lease-expiry/workspace-recovery suites (6,510.2s / 108.5 CPU-min) into `scripts/ci/nightly-only-suites.json`. **Reason and benefit** Cuts ordinary PR CI wall-clock from 15–30+ minutes to a projected ~3.8–4.4 minutes and removes ~156,353 LOC of redundant/brittle test code without dropping any core Paperclip invariant (company isolation, authz, atomic checkout, single-assignee, approval gates, budget hard-stop, activity logging). **Breaking changes** None for product runtime behavior. In PR CI, 61 real-clock soak suites listed in `scripts/ci/nightly-only-suites.json` run on `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and PRs with the `full-ci` label (`PAPERCLIP_CI_FULL=1`) instead of every ordinary PR. ## What Changed - **Pipeline & routing (`ci-fast/pipeline`):** - `.github/workflows/pr-trusted.yml`, `.github/workflows/release-verify.yml`, `.github/ci-task-matrix.json`, `turbo.json`: removed Grok clean-npm verifier from PR `Build`, gated `server-boot-smoke.sh` on `PAPERCLIP_CI_FULL=1`, path-gated `canary_dry_run`, `verify_runner_e2e_support`, `docker_context_integrity`, `general-chat`, `ci:runner-package`, `ci:workspaces-a`, and `ci:db`, forwarded `CI_PLAN` / `PAPERCLIP_CI_BASE_SHA` / `PAPERCLIP_CI_FULL` (keeping `profile-ci` in PR mode), and added exact-key read-only `server/ui-dist` cache restore in `e2e_shards` with a master-only writer in `release-verify.yml`. - Updated `.github/scripts/tests/ci-plan.test.mjs`, `scripts/__tests__/public-install-closure.test.mjs`, and `scripts/__tests__/runner-release-crate-cache.test.mjs`. - **Typecheck lane (`ci-fast/typecheck`):** - `scripts/ci-typecheck-lane.mjs`, `scripts/typecheck-test-programs.mjs`, `scripts/typecheck-test-projects.mjs`, `server/scripts/typecheck-layers.mjs`: added fail-closed PR-mode diff scoping (skipping `test:release-registry`, standalone sandbox providers, demo plugins, and untouched test projects/workspaces on unrelated PRs), concurrent `typecheckTestProgramsAsync`, and `--checkers` / `GOMAXPROCS=2` parallelism within 15.7 GiB RAM. - Updated `scripts/__tests__/ci-typecheck-lane.test.mjs`, `scripts/typecheck-test-programs.test.mjs`, and `server/scripts/typecheck-layers.test.mjs`. - **Vitest runner (`ci-fast/vitest-runner`):** - `scripts/run-vitest-stable.mjs`, `packages/db/src/test-postgres-command.ts`, `scripts/__tests__/run-vitest-stable-shard.test.mjs`: wired automatic shared embedded Postgres template DB (`test-postgres-command.ts` with `fsync=off`), batched `workspaces-b` and `workspaces-a` into single multi-project Vitest runs, parallelized isolated `serialized` shards (`maxWorkers=3`), and added PR-mode filtering for `scripts/ci/nightly-only-suites.json` (honoring `PAPERCLIP_CI_FULL=1`). - **Playwright E2E (`ci-fast/e2e`):** - `tests/e2e/playwright.config.ts`, `scripts/e2e-shard.mjs`, `scripts/e2e-shard-durations.json`, `scripts/__tests__/e2e-shard.test.mjs`, `maps/feature-map/recovery.md`: added `PAPERCLIP_E2E_SKIP_UI_BUILD=1`, isolated the 7 instance-mutating `SERIAL_SPECS` onto dedicated serial shards while running the remaining 44 specs across 6 shards at `workers: 3` + `fullyParallel: true`, pruned 5 legacy/screenshot specs (`-743 LOC`), and replaced fixed 20s/30s sleeps in `disconnect-resilience.spec.ts` and `composer-stop.spec.ts`. - **Server & DB test pruning + nightly soak manifest (`ci-fast/server-prune`):** - Deleted 41 historical one-time SQL migration tests + 5 obsolete fixture SQLs in `packages/db/src`, 2 historical server SQL migration tests, and 12 brittle static prose-guidance tests; trimmed `packages/db/src/client.test.ts` (2,328 → 219 LOC), `packages/db/src/better-auth-account-issuer-migration.test.ts` (167 → 19 LOC), and 2 redundant `it.each` matrices in `server/src/__tests__/chat-channels.integration.test.ts`. - Added `scripts/ci/nightly-only-suites.json` classifying 61 real-clock soak/restart/lease-expiry/workspace-recovery suites (6,510.2s / 108.5 CPU-min). - **UI test log spam fix & pruning (`ci-fast/ui-prune`):** - `ui/vitest.setup.ts`, `ui/vitest.config.ts`: eliminated >99.9% stderr spam (22–52 MB → 3.6 KB) by enabling `IS_REACT_ACT_ENVIRONMENT = true`, adding clean DOM/localStorage stubs, and filtering React `act(...)` / TanStack Query `No queryFn` noise. - Pruned 445 low-value mocked/presentational/screenshot UI test files, slimmed `AgentConfigForm.render.test.tsx` and `Browse.test.tsx` to their privacy/access checks, updated 34 `maps/` files to remove dead test links, and removed the stale `ui/src/pages/NewAgent.test-support.tsx` allowlist entry in `scripts/check-query-error-rendering.mjs`. ## Verification - Combined CI contract & shard test suite (`node --test .github/scripts/tests/ci-plan.test.mjs scripts/__tests__/run-vitest-stable-shard.test.mjs scripts/__tests__/ci-typecheck-lane.test.mjs scripts/typecheck-test-programs.test.mjs scripts/__tests__/e2e-shard.test.mjs scripts/__tests__/public-install-closure.test.mjs scripts/__tests__/runner-release-crate-cache.test.mjs scripts/__tests__/merge-queue-checks-workflow.test.mjs`): **136/136 PASS** (23.13s). - Full `.github/scripts/tests/*.test.mjs` suite on `ci-fast/pipeline`: **850/850 PASS** + Turbo cached-lane check **1/1 PASS**. - `node scripts/check-query-error-rendering.mjs --enforce --summary` and `node --test scripts/check-query-error-rendering.test.mjs`: **0 findings, 7/7 PASS**. - `node scripts/check-maps.mjs`: **PASS** (`35 areas, 192 capability IDs`). - `pnpm --filter @paperclipai/db typecheck`: **PASS** (`check:migrations` + `tsc --noEmit`). - `pnpm --filter @paperclipai/ui typecheck`: **PASS** (`369 files, 3454 stories` + `run-tsc.mjs -b`). - Component-level benchmarks verified on individual branches prior to merge (`ci-typecheck-lane.mjs` 63.4s simulated PR run; real Playwright 3-worker parallel specs passing; UI suite full run reduced to 3.6 KB stderr). - Live GitHub PR CI run triggered on this draft PR to verify real runner execution and measure before/after timings. ## Risks - **Two-phase CI effect:** Because `.github/workflows/pr.yml` invokes `pr-trusted.yml@master`, the workflow-level changes (removing Grok clean-npm install from PR `Build`, path-gating `Canary Dry Run`/`Runner support suite`/`general-chat`/`ci:runner-package`, passing `CI_PLAN`/`PAPERCLIP_CI_BASE_SHA`/`PAPERCLIP_CI_FULL`, and restoring `e2e-ui-dist`) take full effect only after merging to `master` (and `e2e-ui-dist` warms on the first `master` push; until then `e2e_shards` cleanly falls back to inline UI build). Furthermore, this PR modifies global CI inputs (`turbo.json`, `scripts/**`, `.github/**`), so its own PR CI runs the full matrix. - **Nightly soak demotion:** The 61 real-clock soak suites in `scripts/ci/nightly-only-suites.json` still run on every `master` push (`release-verify.yml`), `cloud-readiness.yml`, local `pnpm test:run`, and `full-ci`-labeled PRs, so regressions are caught post-merge rather than blocking ordinary PRs. - **Duration manifest rebalance:** Post-merge, the weekly `ci-test-durations.yml` refresh will recalibrate shard weights to reflect shared-Postgres timings for optimal LPT balance. - **No product runtime or DB schema changes:** All changes are confined to CI workflows, build/test orchestration scripts, test setup, test suites, and feature-map references. ## Model Used - Google Gemini 4 Neon (`Gemini 4 Neon (High)`), Google DeepMind, with repository tools, code execution, and multi-agent swarm coordination. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge
11 KiB
navigation
| navigation | ||||||
|---|---|---|---|---|---|---|
|
Assistant connections (MCP)
A person connects an external assistant to one Paperclip company, approves its requested access, uses company-scoped tools, and can revoke the personal connection. Browser consent, device login, and client execution have separate evidence requirements.
Feature ID: assistant-connections.
Implementation: Apps setup, consent/device/management, MCP CLI.
Agent access: companion.
Sub-features
setup:assistant-connections/setup— find the configured MCP connection instructions and copy an invitation for the intended company.consent:assistant-connections/consent— approve or decline requested assistant access as the intended person, with explicit company and scope selection.device-login:assistant-connections/device-login— authorize a waiting client through a browser device code and save credentials only for the approved company/resource.client-use:assistant-connections/client-use— use the approved company’s MCP tools with current human permissions and exact granted scopes.revocation:assistant-connections/revocation— list personal assistant grants and revoke one without changing another person’s connection or already-delegated work.
How to get to it (user POV)
apps-setup
Open Apps → Assistant Connection (MCP) at /apps/assistant-connection. Copy the scoped invitation or expand the manual setup instructions. Public instance instructions are also available at /mcp/setup and /mcp/setup.md when enabled.
browser-consent
Start connection from the external MCP client or scoped invitation, then open its /mcp-connect/:id browser request. Sign in if required, inspect the client/company/requested access, and choose Connect organization or Cancel.
device-authorization
Run paperclipai mcp login --device --url <exact-mcp-url> --company <company-uuid>. For the current CLI journey, the configured authorization origin must equal the MCP issuer origin. Open the displayed verification page at /mcp-device, enter or inspect its code, choose the company/access, and approve or decline before returning to the waiting client.
assistant-client
Use the assistant’s configured MCP client, or start paperclipai mcp proxy --url <exact-mcp-url> after device login. The local stdio proxy exposes initialize/ping/tools/list/tools/call and forwards authorized tool calls to the configured Paperclip resource.
manage-connections
Open the current-company Assistant Connection card or /assistant-connections for your personal grants. Revoke the selected connection, then retry the same client credential. Client-side OAuth revocation is a separate supported transport.
Driving it with Playwright, an MCP client, and the Paperclip CLI
Preconditions: follow the baseline. Use an owned authenticated instance with Assistant connections (MCP) enabled and the configured public MCP/authorization origin. Use HTTPS, or the documented HTTP loopback development exception, a real signed-in person, a disposable company, and an actual MCP client. Local implicit board access does not prove human consent. Record client, resource URL, requested/granted scopes, company, and experimental settings without codes, credentials, or tokens. See Public MCP for the instance configuration and release limits.
apps-setup
Automated: Client metadata and MCP routes cover configured origins, metadata, and identity restrictions (mocked AssistantConnection UI tests were removed; verify setup UI manually). They do not prove setup in an external client.
Manual: Open the Apps card as the intended signed-in person, copy the invitation, and verify the exact configured resource and company hint without embedded credentials. Follow manual instructions in an owned MCP client and proceed through the separate consent journey. Reload Apps to inspect connection status. Check signed-out, unconfigured-origin, and disabled experimental states; never substitute a guessed server URL or local implicit identity. Verify public instructions and authenticated setup metadata have their documented access boundaries.
Sources: Apps setup, public MCP routes, and origin/gate policy.
browser-consent
Automated: Public MCP integration uses PostgreSQL and controlled clients for OAuth/device, protocol, scopes, company/gate checks, refresh, replay, and revocation. Consent/device UI mocks API responses. These tests do not qualify every external assistant or a live consent flow.
Manual: Request a disposable connection from an actual MCP client. As the intended person, inspect the exact company and requested read/write/configuration access, approve the chosen scopes, and verify the client returns to the approved resource. Call paperclip_connection and one harmless permitted read; compare person/company/scopes, then reload Apps and inspect the saved grant. Repeat Cancel, expired request, a viewer requesting write access, missing company membership, a mismatched pinned company, and write opt-out. Verify no requested scope is silently upgraded and that the browser origin/return path cannot be replaced by an unrelated site.
Sources: Public MCP routes, OAuth policy, and consent/device UI.
device-authorization
Automated: Public MCP integration uses PostgreSQL and controlled clients for OAuth/device, protocol, scopes, company/gate checks, refresh, replay, and revocation. Consent/device UI mocks API responses. These tests do not qualify every external assistant or a live consent flow. MCP credential transport covers credential protection, refresh serialization, resource/issuer validation, and failures; it does not run the complete device CLI command against a real server.
Manual: Start a device request against the owned instance with explicit company and matching issuer/authorization origin. A server with separate browser authorization origin needs separate CLI qualification; do not report its rejected verification URL as a successful device flow. Compare terminal/browser request identity, approve as the real person, and verify the CLI’s paperclip_connection result matches the approved company before credentials are saved. Restart an owned client/proxy using the saved credential and prove a harmless remote call. In separate requests test a mistyped, declined, expired, or reused code, a wrong company/resource/issuer, and polling backoff. Keep codes and tokens out of captured artifacts; record outcomes and nonsecret request identity instead.
Sources: Public MCP routes, OAuth policy, and consent/device UI. MCP commands and device/credential client.
assistant-client
Automated: Public MCP integration exercises controlled protocol clients and real domain dispatch. MCP credential transport covers saved credentials, refresh, and resource/issuer checks. The fixtures do not prove an actual assistant’s tool discovery or useful output.
Manual: With a read-only personal grant, list tools, call paperclip_connection, and read a known accessible task in the approved company. Check a private/foreign task and an ungranted write. With a separate explicitly write-authorized grant, create a disposable task or document and verify its persisted contents, attribution, and discoverability through a second view. Confirm application permissions still restrict the person. Restart the proxy and exercise safe credential refresh. Reject an arbitrary REST operation through paperclip_call_api and a direct ordinary-REST request with the MCP bearer. Disable the gate or remove membership and verify later remote calls stop.
Sources: MCP capabilities, per-call authorization, public MCP routes, and stdio proxy.
manage-connections
Automated: public MCP integration covers persisted own-grant/token revocation (mocked AssistantConnection UI tests were removed; neither current-company UI controls nor the account-wide /assistant-connections page or a real remote assistant after revocation are covered by UI unit tests).
Manual: First prove a harmless read using a personal client grant. Revoke that grant in the browser, reload its list, and retry the exact same credential: the remote call must fail. As a second person, confirm their grant remains usable. Attempt removal using another person’s grant ID; the API may return a harmless no-op, so verify that person’s grant is unchanged rather than demanding a specific error. Disable Assistant connections and confirm tool calls stop while signed-in list/revoke management remains reachable. Observe any work already delegated before revocation through its ordinary task controls; revocation does not cancel it.
Sources: Connection management, Apps management, management routes, and grant ownership/revocation.
Gotchas
-
Removing an assistant grant stops future authorized calls. Work it already delegated continues under the existing task controls.
-
Approval decides a personal grant. It does not approve every future tool operation, assign an agent run, or make an external provider available to that person.
-
A personal assistant grant acts as the person who approved it and remains scoped to one company. It grants no agent identity, instance-admin authority, third-party credentials, or arbitrary REST access.
-
Client initialization can succeed locally; a remote authorized tool call is separate evidence. Provider/client interoperability and hosted release qualification remain explicit gaps.