Files
PaperClipAI/server
DottaandClaude Opus 5.5 cf09024292 fix(heartbeat): count an early native hand-off only after its suspend commits (#21572)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work
> - A server restart hands each live Runner run to the next server, so
the agent keeps working without a retry
> - At shutdown start, the outgoing server hands off native runs early,
in parallel with the rest of shutdown
> - The early hand-off put a run in the "handed off" set before its
suspend finished, and the drain counted every run in that set as
suspended without waiting
> - The early hand-off shares the 20 s pre-drain budget, and one Runner
detach can take 20-30 s, so the process could exit with the suspend
unfinished
> - Then the finalization lease stays live, the next server gets no
hand-over signal, and the run waits for lease expiry or the reaper
> - This pull request makes the drain wait for each in-flight early
hand-off, and fall back to its own hand-off when the early one failed or
did not finish
> - The benefit is that a run counts as handed over only after its
hand-over is committed, so the next server can always reach it at once

## Linked Issues or Issue Description

**What happened?**
A passing zero-downtime swap test showed a latent race in the shutdown
hand-off. `handOffNativeRunsForShutdown` added a run to
`nativeRunsHandedOffEarly` before `suspendNativeRunForShutdown`
finished. `drainRunningRunsForShutdown` then reported every run in that
set as `restartSuspended` without awaiting it. Because the early
hand-off shares the 20 s pre-drain budget and a Runner detach can wait
20-30 s, the process can exit before the lease release commits. Also, a
timed-out `prepareHotRestartShutdown` could still write the hot-restart
snapshot and detach sessions after the fallback drain started. In the
same test, swap 1's early hand-off took 2.08 s, and no log showed which
phase was slow.

**Expected behavior**
A run counts as handed over only after its suspend commits. If the early
suspend fails or does not finish, the drain hands the run off itself. A
timed-out hot-restart preparation does no further work after the drain
starts. The hand-off logs its phase timings.

**Steps to reproduce**
1. Start a native Runner run on a remote sandbox.
2. Send SIGTERM while the Runner detach is slow (or fails).
3. The drain reports the run as restart-suspended while its suspend is
still pending, and the process can exit before the lease release.

**Paperclip version or commit**
`master` at bbed32450c.

**Deployment mode**
Hosted, zero-downtime release swap.

## What Changed

- `nativeRunsHandedOffEarly` now holds each run's in-flight suspend
promise, not only its id.
- The shutdown drain awaits that promise (bounded at 30 s). If it fails,
returns false or does not finish, the drain runs its own suspend, as it
does for a run without an early hand-off.
- `runBoundedShutdownStep` and the pre-drain budget pass an
`AbortSignal` to each step and abort it on timeout.
- `prepareHotRestartShutdown` takes that signal and stops before the
snapshot write, the run events, and the session detach when the step
timed out.
- `handOffNativeRunsForShutdown` logs one structured line, "native run
shutdown hand-off phase timings": intent read, controller identity,
select, max per-run detach, max per-run transaction, and total.

## Verification

- Red, then green (each failed against `master` source and passes with
the fix), all through the public shutdown functions in
`server/src/services/heartbeat/recovery.test.ts`:
- `does not count an early hand-off as suspended while its detach is
still pending at the shutdown drain`
- `hands off a run at the shutdown drain when its pending early hand-off
fails`
- `writes no hot-restart snapshot and detaches nothing after a timed-out
preparation hands over to the drain`
- New test in `server/src/shutdown.test.ts`: `aborts the signal of a
step that outlives its bound, and only that step`.
- `pnpm vitest run src/shutdown.test.ts
src/services/heartbeat/recovery.test.ts
src/__tests__/heartbeat-native-early-hand-off.test.ts` passes (145
tests).
- `tsc --noEmit` for `server` passes. `pnpm verify` passes for the
selected tests.

## Risks

- When an early hand-off does not finish within 30 s, the drain starts a
second suspend. The second detach joins the first, because the session
memoizes its restart detach. The run can then get two "suspended" run
events. That is preferred to reporting a hand-over that did not happen.
- The drain can now wait up to 30 s for a slow early hand-off before the
process exits. Before, it exited without the hand-over.
- The abort signal only stops work between steps of the preparation. A
snapshot write that already started still completes.

> For core feature work, check [`ROADMAP.md`](ROADMAP.md) first and
discuss it in `#dev` before opening the PR. Feature PRs that overlap
with planned core work may need to be redirected — check the roadmap
first. See `CONTRIBUTING.md`.

## Model Used

- Anthropic Claude Opus 5.5 (`claude-opus-5-5`), used through Claude
Code with tool use (shell, file edits, test runs).

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

🤖 Generated with [Claude Code](https://claude.com/claude-code)

---------

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-14 03:02:25 -06:00
..