## Thinking Path > - Paperclip runs agents in response to work on a task. > - A person can leave a comment while execution recovery holds that task. > - Wake-queue checks the recovery gate under the task lock. Heartbeat used to choose how to save the blocked input. > - The deferred-work worker later retries the saved receipt by ID. > - This change gives wake-queue responsibility for saving the input before it confirms deferral. ## Linked Issues or Issue Description **Current behavior** The gate and the write that makes a blocked wake recoverable have different owners. Heartbeat also reports an admitted deferral when an update to an existing receipt matches no row. **Proposed behavior** Let the recovery admission operation save the first receipt or update the existing one in the same transaction. Confirm admission only when the write succeeds. Keep replaceable automatic signals on their existing diagnostic path. **Reason and benefit** Changes to recovery admission can now be checked against one rule. A blocked comment must have a durable receipt and remain recoverable across delivery attempts. Related changes include [#22292](https://github.com/paperclipai/paperclip/pull/22292) and [#22290](https://github.com/paperclipai/paperclip/pull/22290). ## What Changed - Added a transaction-bound deferral operation to wake-queue recovery. It handles existing receipts, saved input, and replaceable system signals. - Scoped retry updates to the company, issue, agent, deferred status, and receipt ID. A stale receipt cannot confirm admission or cause a new receipt to be inserted. - Kept case refusals and issue state callbacks in heartbeat. A saved comment uses the existing delivery worker and post-commit effects. ## Verification - Retried a saved comment by receipt ID through the real heartbeat and run-control entry points. While the hold remained, no run started. After the hold cleared, repeated retry delivered the comment to exactly one run. - Forced a rollback after the wake-queue Postgres adapter saved a receipt. The test observed the receipt within the transaction and confirmed its absence after rollback. Tested missing receipts and receipts for another issue or agent. The admission application test covers error propagation and post-commit effects when the transaction fails. - The test-only revision `9f443f9e6b` passed 9 focused PostgreSQL and recovery checks and all 15 issue-wake admission application tests. - The preceding production revision `eb37328472` passed the server TypeScript check, the module boundary check, and 498 tests across five queue and recovery suites. Twelve pairs of ordinary comments issued the same SQL before and after that production change (42 statements for a fresh wake and 35 for a join). - Both updated test files passed in full (249 tests). [CI attempt 3](https://github.com/paperclipai/paperclip/actions/runs/44572369812/attempts/3) passed on `9f443f9e6b` after retrying interrupted jobs. [Standard Greptile review](https://github.com/paperclipai/paperclip/pull/22332#issuecomment-7014835241) scored the same commit 5/5 with no open findings. ## Risks The affected path handles blocked admissions that may race a retry or a reassignment. Existing recovery gates, saved comment IDs, receipt identity, and notifications must survive that race. This change has no migration or new worker. The healthy admission path is expected to issue the same SQL. ## Model Used OpenAI Codex with GPT-6.2 Sol for implementation and verification. Codex directed and reviewed the change. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing>
Feature modules
A feature module under server/src/modules/<name>/ uses three layers. Each
layer has one rule: which layer below it, it may import from.
adapters → application → domain
domain/holds pure business rules. A domain file takes plain data in and returns plain data out. A domain file must not importdrizzle-orm,@paperclipai/db, a service underserver/src/services/, a route underserver/src/routes/, or a Node.js I/O module (node:child_process,node:fs,node:net). A domain function must not read the system clock; the caller passesnowas an explicitDatevalue.application/holds use cases and the ports they need. A use case takes its ports as constructor arguments and calls domain functions for policy decisions. An application file must not importdrizzle-orm, a SQL client, a concrete adapter, or the server's HTTP error helpers. The outer service or route translates application errors into transport responses.adapters/holds the concrete implementations of the ports: Postgres queries, transactions, and process control. An adapter file may importdrizzle-orm,@paperclipai/db, and Node.js I/O modules.
A module exposes its commands through index.ts, which composes the adapters
and the use cases behind a factory function. Code outside the module imports
that entry point, never a file inside domain/, application/, or
adapters/ directly.
pnpm check:module-boundaries enforces these rules for production source
files. It also checks access to the company deletion entry point below.
Company deletion
The existing company deletion service owns the database transaction and deletion
order. A module can expose a separate company-deletion.ts entry point.
Only services/company-deletion.ts can import this entry point.
The entry point exports an implementation of CompanyDeletionParticipant from
lib/company-deletion.ts. Do not export it through the normal module index.
The service must complete external cleanup before it starts the transaction. It must lock the company before it deletes dependent records or calls a module. Creation commands must use the same company lock. The service removes dependent records before it calls the module. The module checks its deletion conditions and deletes the records it owns. Use the supplied transaction. Do not start another transaction or call external systems. Throw an error if deletion cannot proceed. An error must roll back all database changes in the deletion transaction.
Call each module explicitly in dependency order. No module registry is required.
The agent lifecycle module also has a restricted configuration.ts entry point.
It saves configuration and invalidates verification in the caller's transaction.
The lifecycle guide lists its permitted callers.
Ordinary configuration updates use the root lifecycle command.
The agent lifecycle module owns agent creation, pause, resume, and termination. Use its commands for these changes.
The execution admission module owns project task-execution policy and the
durable admission records that charge project capacity. Today it exposes only
internal policy commands and the deletion guards that project, agent, and
company deletion call. Settlement releases active charges but keeps each
admission's complete project set for later retained-session resolution.
Execution claims still belong to services/heartbeat/queue.ts and native
review dispatch. See execution admission accounting.
Execution admission accounting
The execution-admission module (server/src/modules/execution-admission/) owns
three tables. Nothing writes admissions or caps in production yet, and no claim
path enforces a project maximum.
project_task_execution_policiesstores a project's maximum concurrent tasks apart fromprojects, so project readers never return an unenforced cap. No row means never configured. A row with a null maximum means an explicit "no limit", which a later legacy migration must not overwrite. Maximums are positive. The row is deleted with its project.execution_admissionsstores one admission attempt of a run. A run can be released before dispatch and admitted again, so(run_id, attempt)is unique and a partial unique index allows one unsettled attempt per run. The row keeps the context revision, the nullable primary project as provenance (no foreign key) and the settlement identity, which is set together withsettled_at.admitted_project_idsis the complete admitted project set, sorted, kept after settlement and immutable (a trigger rejects any change). It has no project foreign key, so settled history never blocks project deletion and keeps the deleted project's ID.{}is a known empty set. Null means unknown and is allowed only on settled rows: migration0428filled it from the charges of unsettled rows, but settled0426rows had already lost their set. A retained provider session resumes with the previous set ∪ the current references; an unknown previous set requires a fresh context, never an empty or primary-only guess.execution_admission_project_chargesstores one row per distinct admitted project, including unlimited projects. An admission without projects has no rows. Composite(company_id, …)foreign keys keep admissions and projects in one company. Rows are the only active capacity and exist only while the admission is unsettled: settlement deletes the whole set in one transaction, and(company_id, project_id)is indexed for active counts, so lookups scale with active work, not history.
Archiving a project changes no charge. Deleting a project with a charge returns
409 project_execution_admission_pending; the foreign key is the backstop.
Deleting an agent refuses unsettled admissions on its runs and removes settled
ones, with their sets, together with the runs. Company deletion removes the company's admissions before its runs and
projects.
The proposed global lock order for the admission transaction is: company row
(FOR NO KEY UPDATE), native finalization recovery owner, the whole project set
in ascending ID order (FOR NO KEY UPDATE, one statement), issues, wake
requests, the run, the external-admission advisory lock, the admission row and
its charges, then budget reservations. Policy updates take the same project
lock. Settlement takes no project lock. Only the project-set step is implemented
so far; claim paths keep their current locks until they are integrated.