Bound initial shutdown waits and finish workspace repairs before teardown. Share a 20-second budget between waits before the heartbeat run drain. Retain the original workspace recovery stop promise and join it after the run drain and finalizers, before application and database teardown. Keep that join for hot restart when the run drain is skipped. Log step and drain durations and bound telemetry flush separately after the drain. Verification: all 154 tests across the three relevant shutdown/startup suites and every server source/test typecheck layer passed. Both actual server lifecycle variants reproduce premature teardown without the fix. All applicable CI passed and exact-head Greptile Apex scored 5/5. Co-Authored-By: Devin Foley <devinfoley@users.noreply.github.com> Co-Authored-By: Paperclip <noreply@paperclip.ing>