## Thinking Path > - Paperclip must keep admitted remote work alive while its main server is replaced. > - Runner owns recovery mechanics and exposes opaque checkpoints through #17097. > - The server owns company scope, encryption, Stop, tool authority and execution ownership. > - A successor must prove current ownership before it adopts the original execution. > - Checkpoint bursts must also leave capacity for normal requests and lease renewal. > - This PR persists and adopts that authority through the existing runtime boundaries. ## Linked Issues or Issue Description **What existing behavior does this improve?** Remote agents retain the original execution during a bounded main-server outage. **Current behavior** A server restart can lose the controller's local state and connection. An unsafe replacement could repeat a turn or an uncertain mutation. Checkpoint writes in the request pool can also delay ordinary requests during an aligned burst. **Proposed behavior** Restore encrypted control records from Postgres and adopt the original runner under a fenced lease. Recover known tool receipts through current tool authority. Give control checkpoints a shared pool capped at two connections per database owner. Depends on #17097. Successors are #17455 and #17456. Qualification and presentation remain separate review slices. ## What Changed - Add company/run-bound encrypted checkpoint records and migration 0394. Keep the SQL idempotent after renumbering against current master. - Recover startup and expired ownership through native runtime and heartbeat. Preserve the sandbox lease, admitted runner artifact, harness configuration, native session and active turn. - Keep Stop, finalization, preparation ownership and stale-writer fencing transactional. Preserve graceful detach and natural crash takeover. - Recover committed tool receipts through the existing authority. Reauthorize reads and hold uncertain mutations. - Bound startup retention with the existing coordinator and preserve zero idle scans. - Share at most two checkpoint connections per database client. Keep application and liveness capacity separate. Close the checkpoint pool during shutdown; late writes cannot reopen it. - Count SQL across both application and checkpoint clients. Prove request/liveness progress, command recovery and failure after pool shutdown with real Postgres. ## Verification Project creation recovery now uses the existing project activity receipt owner. It retains authenticated input normalization, fingerprint checks and current run authority after the receipt lock. An absent receipt returns no result before mutation. The new lost-HTTP-response and no-effect regression uses real API routes and Postgres. The seven transport cases pass locally. This Mac skips all 20 database cases. On current source `5de803c2cd`, Linux [job 122593415890](https://github.com/paperclipai/paperclip/actions/runs/40620576702/job/122593415890) executes all 20 project-tool cases successfully (9.480 seconds), including the committed-project lost-response regression. Its shard passes 1,627 cases with three unrelated skips. Server typecheck passes. The transport regression initially has two failures; a subsequent incorrect expectation about schema defaults was corrected before the final pass. Ordinary execution adds no checkpoint writes or recurring work. Current candidate `5de803c2cd` includes the project-creation receipt recovery fix and master `2cd747d1b6`. Migration 0394 retains the prior idempotent checkpoint DDL. Every master SQL file and journal entry is preserved. Snapshots 0390–0394, migration checks and server typecheck pass. The ordinary warm-turn regression fails on its second turn before `a219ab51ad`. After correction, three completed warm turns select the correct prior checkpoint and preserve the original session. All 288 provider-wiring cases pass. The control plane, external persistence callback, identity rotation and filesystem are real; the backend and database-load seam are scripted. The 13 warm admission/configuration variants also pass after final master integration. This does not qualify an underlying harness. At current source `5de803c2cd`, Linux [job 122593415907](https://github.com/paperclipai/paperclip/actions/runs/40620576702/job/122593415907) passes all 940 native-session-executor cases (61.431 seconds), including the warm external-checkpoint behavior; the shard passes 2,358 cases with one skip. Current [Runner job 122593415475](https://github.com/paperclipai/paperclip/actions/runs/40620576702/job/122593415475) passes the native recovery lane: 115 passes and five container-only skips, including the encrypted restore guard, fresh preparation (63.189 seconds), blocked claim lock (1.226 seconds) and recovery beyond 101 blocked owners (3.897 seconds). The first lane passes 2,215 cases with one skip. The SQL cost test reports zero idle and streaming SQL for both output volumes; this is component evidence, not a production capacity claim. At prior candidate `1ff7bb44f4`, Linux job 122549307215 passes all 938 native-executor cases, including the three-turn external-checkpoint regression. Job 122549306469 passes the native recovery lane with 115 passes and five container-only skips, including the encrypted-restore session guard, fresh preparation (63.664 seconds), claim-lock contention (3.961 seconds), and 101-owner recovery (3.824 seconds). This Mac skips the real-Postgres suite. The earlier full local executor attempt has 921 passes and 16 failures during embedded-Postgres initialization before assertions. The original fixture collisions and their corrections remain recorded. At earlier candidate `8fbe62b41d`, server shard job 122535673841 has 3,876 passes, one failure and one skip in an unchanged expiry-worker retry/drain timing test. The same server/database tree on qualification source `b64cac6951` passes all 20 expiry cases and all 3,877 shard cases. The single diagnostic retry, job 122541891915, passes all 20 expiry cases and all 3,877 shard cases (one skip). No assertion was weakened. The original failure remains recorded and its exact timing race is not proven. All Actions checks and legacy status passed on `8fbe62b41d`, with completed Greptile 5/5 and no open feedback. The next candidate `1ff7bb44f4` also passed all Actions checks and Greptile 5/5. Its Paperclip Review remained queued before the new master conflict required integration. The new candidate needs fresh exact-head CI and reviews; old checks do not qualify it. Migration generation is checkpoint-only, all master SQL and journal entries remain unchanged, and migration checks, server typecheck and all 13 warm-owner variants pass after integration. The first migration check was blocked by TSX sandbox IPC; its permitted repeat passes. The first warm-test command used an incorrect path and ran no tests; the corrected command supplies the 13-case receipt. All 16 database pool-lifetime/options/teardown cases pass after granting loopback permission; the first batch had two EPERM failures and 14 passes. Earlier semantic-tool/HTTP recovery, adoption, encryption-batch, zero-streaming-write and idle-SQL receipts remain source-attributed in the [qualification record](https://github.com/paperclipai/paperclip/blob/2ff66f57da0da35bac1c19a2366ea4b84d87a986/doc/plans/2026-10-22-hot-upgrade-qualification.md). That record retains earlier assertion, setup and cleanup failures and their corrections. No failed gate is waived. The historical 300-session component campaign passes four after phases: steady read p99 is 107–108 ms at 500 reads/s and 100 writes/s; aligned-burst read p99 is 103–105 ms after the bounded pool, versus 584–689 ms before. This comparison isolates the persistence corrections. It does not measure the final stack's hosted active-agent capacity. The hosted zero-agent API pair leaves SQL and CPU essentially unchanged, but both arms fail absolute latency gates and candidate peak cgroup memory fails its gate. The active-agent/viewer matrix, different-artifact upgrade and rollback remain open. Run `PAPERCLIP_TEST_DATABASE_URL=<owned-disposable-postgres> pnpm --filter @paperclipai/server exec vitest run src/services/native-runtime/native-runner-restart-recovery.integration.test.ts`. Previous head `f2db8a6568` had one failed workspace setup gate: [job 122555672441](https://github.com/paperclipai/paperclip/actions/runs/40608984238/job/122555672441) passes all 4,169 UI tests and 285 CLI cases (one skip), but the company import/export suite reaches its 30-second health deadline during doctor startup. Its output does not reach the server-start step. The CLI, server, database, shared, adapter and plugin trees are identical on qualification source `a866619d7b`, whose [job 122555886663](https://github.com/paperclipai/paperclip/actions/runs/40609057937/job/122555886663) passes that fixture and all 286 CLI cases. The one diagnostic retry, [job 122561057225](https://github.com/paperclipai/paperclip/actions/runs/40608984238/job/122561057225), passes the formerly failing fixture and all 286 CLI cases. All Actions checks and legacy status on `f2db8a6568` pass. Its exact-head Greptile completed at 5/5 with no open feedback. The current integrated head requires fresh checks and a completed Paperclip Review before merge. The original failure remains recorded; its exact timing cause is unproven. A repeated failure requires investigation and repair rather than another retry. All current-head CI, legacy status, exact-head completed Greptile 5/5, resolved feedback and ordinary GitHub merge eligibility remain required before merge. The latest integration preserves master’s published Copilot v70 profiles and every published migration. Checkpoint migration `0394_conscious_whizzer.sql` was generated with `pnpm db:generate` and retains the prior idempotent DDL. The Runner vendor rebuild and replay parity checks pass. Server typecheck and all 13 warm-owner variants pass after that rebuild. The imported report-lock patch is byte-identical to master; its intentional patch-context whitespace is retained, and the feature delta passes whitespace checks. No hosted experiment was run. ## Risks The pool adds up to two active connections per instance, shared across agents. Checkpoint delivery can wait behind that bound; it still requires its commit. Steady component-test Postgres CPU rises by about 1.7 percentage points of a two-CPU allocation. These corrections do not remove the stack's control and renewal writes. The migration and key must survive replacement. Fresh-database tests and local load do not establish different-artifact hosted upgrade or rollback continuity. ## Model Used OpenAI GPT-6 through Codex, with reasoning, repository tools and code execution. The runtime does not expose a more specific model ID or context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [ ] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing>
Paperclip agent access map
This map accompanies the feature map. It records APIs, agent entry points, permission boundaries and verification for the same capability IDs. The shared contract defines the format and maintenance rules.
The chat scenario catalog uses these same IDs for human requests and expected outcomes. Its scenarios retain the access boundaries here; neither a CEO role nor a planned scenario grants board authority or establishes a working production tool binding.
Use full capability IDs when referring to access contracts outside their file:
onboarding/company means the company capability in onboarding.md in both maps.
The feature index lists feature and
capability IDs; IDs and references
explains entry-point references and stable naming.
Browse access contracts
The same-named feature recipes define navigation and capability IDs. Run
node scripts/storybook-catalog.mjs for the generated
maps/generated/agent-access-map.md index, or browse the
published feature guide.
Add or update the affected companion; there is no central registration or count.
Existing baseline source references describe the original inspection, not current verification. Record new executed evidence in the PR, issue, or CI artifact with its revision and scope. Do not refresh unrelated headers as bookkeeping.
Using an entry
Read its Policy and Gaps before selecting an agent path. Native fallback, legacy
REST/CLI, stdio MCP and a personal assistant connection can have different
authority and availability. Use a real admitted production binding; a scenario
declaration is not an installed tool. A restricted entry records current
enforcement and leaves any unresolved delegation decision visible.
For API catalog disagreements, follow the route/service authorization and record
discovery drift. For not-applicable, retain the concrete exception and local
path. Split shared business operations from client-only presentation.
Use maintain-verification-skill to reconcile changed source and both maps.
Use verify-paperclip and existing API/runner/MCP fixtures to collect the
permitted-agent and denial evidence; report blocked/not-run coverage honestly.
Run node scripts/check-maps.mjs after editing. The structural check does not
certify permissions, API catalog coverage, tool admission or live behavior.
Native REST transport
The call_api parity change reconciles affected baselines against
58e16dbddfc9c8d0cf60867f9d9847f0feda055b and the changes in this PR. Ordinary
REST operations use the same route authorization as legacy agent REST. Dedicated
tools remain optional for those operations; protocol endpoints still need their
existing clients. Board-only routes remain restricted for agent identity.
Native search_api / call_api is enabled by default, but explicit server,
company-allowlist and binding settings can narrow admission. It requires a running
authorized native run, current task assignment and execution-run binding, company
and budget authority, task privacy, and a permitted work mode. Ask and Plan retain
mutation restrictions, and runs retain their admitted JWT scope during restart
recovery even when task mode changes. A waiting
agent does not gain independent native control just because a REST route exists.
Connection-management reads support Standard, Ask and Plan; mutations require
Standard. Skill-test runs and nonstandard task-bridge keys cannot administer
connections. These gates supplement each operation's grants, resolved resource
and target scope, and responsible-user authority. See the
rollout policy
and connection authorization.
Credential-bearing replies, including company exports and their legacy alias, stay inline under a 10 MiB limit and use encrypted mutation receipts. Other saved API snapshots are limited to the issuing actor and responsible user, plus authorized administrators. Artifact uploads enforce the same access checks as downloads; private snapshots are excluded from company exports and public company logos. Explicit deliverables use the existing sharing path. Native event history, checkpoints and completion records omit API bodies while preserving receipt metadata and replay digests. Restored webhook secrets use the same encrypted receipt and inline response policy as newly created webhook secrets. Task image access requires the company boundary and the task permission; skill-test and low-trust agents do not need company-wide browsing authority. Completion replay applies the same idempotent projection to stored and expected payloads; the run-log guide describes its fields.
Sources: API client,
catalog,
native authority,
credential storage classification,
snapshot access,
and history redaction. The affected entries remain
baseline and source-only; this reconciliation does not certify every operation.
Targeted real-route proof lives in the
API integration suite,