Commit Graph
5 Commits
Author SHA1 Message Date
DottaandClaude Opus 5.5 e8c79235ca perf(attention): scope run lifecycle retention hints and read only used columns (#21579)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work
> - The `attention-retention` queue archives old attention items (failed
runs, reviews, questions, recovery actions, blocked tasks). A company
hint makes it reload every candidate of the company, 100 per page, with
eligibility reads for each page.
> - Several run lifecycle producers sent that company hint: every agent
status change after a run, the execution-control writes and legacy run
terminalization when they name only a run, scheduled retries, and the
Runner's task monitor tool.
> - Each page also read whole rows it did not use: full `heartbeat_runs`
rows (recent ones carry tens of KB of `context_snapshot` and
`runner_profile_json`), full `issues` rows (descriptions), and the whole
agent roster with its configuration.
> - This pull request names the task graph or the source kind in those
hints, and reads only the columns each eligibility decision uses.
> - The benefit is fewer company reloads per run event and far fewer
result bytes per reconstruction, with the same decisions.

## Linked Issues or Issue Description

No issue exists. This describes the problem with the fields of
`.github/ISSUE_TEMPLATE/enhancement.yml`. Stacked on #21552 (it builds
on that pull request's change to `execution-control-notifications.ts`);
review that one first.

**What existing behavior does this improve?**

The attention retention queue
(`server/src/services/attention-retention.ts`) and the producers that
wake it on run lifecycle paths.

**Subsystem affected**

Server background retention (`attention-retention.ts`,
`retention-work-notifications.ts`, `execution-control-notifications.ts`,
`heartbeat/agent-status.ts`, `heartbeat/retries.ts`,
`native-runtime/paperclip-runner-tool-authority.ts`).

**Current behavior**

- `heartbeat/agent-status.ts` sends `{ companyId }` on every agent
status change after a run (two places). `heartbeat/retries.ts` sends it
for each scheduled retry. `writeExecutionControl` and
`notifyExecutionRunWork` send it when the scope names only a run. The
Runner's `set_task_monitor` tool sends it for one task.
- On a local fixture with 1,500 open tasks and run churn, the queue
loaded 47 company candidate rows per second from these hints.
- `pageEvidence` read `select *` from `heartbeat_runs`,
`issue_recovery_actions` and (through `getTableColumns`) `issues`;
`reviewEligibility` read `select *` from `issues`;
`interactionEligibility` read the full agent roster; the per-entry
`check` repeated full-row reads.

**Proposed behavior**

- Agent status changes send `{ companyId, sourceKind:
"agent_error_alert" }`. The status moves between `running`, `idle` and
`error`. All three are invokable for blocker attention
(`BLOCKER_ATTENTION_INVOKABLE_AGENT_STATUSES`) and for questions
(`agent-eligibility.ts`). Failed-run attention only excludes terminated
agents, and this path never sets that. So only agent error alerts can
change.
- Run-scoped execution-control writes, legacy run terminalization and
scheduled retries use `notifyIssueAttentionRetentionWork` with the run
id (the run's task, its parents and the tasks it blocks; company
fallback past 100). This is the same helper as #21521. The task monitor
tool scopes to its task.
- `notifyIssueAttentionRetentionWork` matched the run's saved task id
with `issue.id::text = …`. It now validates and casts the id, so the
primary key is used, as #21552 does for recovery.
- Narrow reads, same decisions:
- runs: `id`, `agent_id`, `created_at` and the saved task id computed in
SQL with the same rules as `readRunIssueId` (`issueId` unless it is
absent or JSON null, then `taskId`; only non-empty strings).
  - recovery actions: `id`, `source_issue_id`.
- issues for evidence and `visibleIssue`: the blocker-attention input
columns plus `unblock_descriptor` and `blocked_transition_at`.
- review issues: `id`, `company_id`, `status`, `execution_state`,
`assignee_user_id`.
- agent roster for question addressees: `id`, `company_id`, `name`,
`reports_to`, `status` (the `AgentOrgRow` that
`evaluateAgentInvokability` takes).

**Reason and benefit**

A run event no longer reloads every attention candidate of the company.
A reconstruction no longer transfers whole run, task and agent rows.

## What Changed

- `server/src/services/attention-retention.ts`: column lists for runs,
recovery actions, issues and the roster; the run probe type replaces
whole rows.
- `server/src/services/heartbeat/agent-status.ts`,
`heartbeat/retries.ts`, `execution-control-notifications.ts`,
`native-runtime/paperclip-runner-tool-authority.ts`: scoped attention
hints.
- `server/src/services/retention-work-notifications.ts`: indexed lookup
of a run's saved task.
- `server/src/__tests__/attention-retention-work.test.ts`: two tests.

## Verification

- `reads only the fields its decisions use from large runs, reviews and
agents` (I saw it fail first): 50 failed runs, 50 tasks in review with
large descriptions, 10 questions to a paused agent, about 40 KB of
payload in each run's snapshot, profile and stdout and in the agents'
configuration. It loads the three kinds with the full-size response
capture (`full-database-response-capture.ts`). Before: `heartbeat_runs`
6,317,700 bytes, `agents` 84,336 bytes, `issues` 4,235,810 bytes. After:
under the test bounds of 20,000, 5,000 and 60,000 bytes. The decisions
are the same before and after: 50 failed runs, 40 reviews and 10
questions.
- `scopes run lifecycle attention hints to the run's task graph and
agent status to agent alerts` (I saw it fail first):
`writeExecutionControl` and `notifyExecutionRunWork` with a run id send
the hint for the task and its parent. `finalizeAgentStatus` sends the
agent-alert hint. Before, all three sent `{ companyId }`.
- `attention-retention-work` (57 tests),
`attention-retention-candidates`, `attention-service`,
`execution-control-work` and `heartbeat-agent-status-recovery` pass,
each file run alone (in `server/`, against a dedicated local `_test`
database).
- `pnpm check:module-boundaries` passes.

Not done in this pull request, and why:

- I did not reproduce `syncItems` re-syncing unchanged rows from the
retention `check`. On my fixture (300 stalled blocked tasks, 4,500 old
recovery-action and blocker retention rows, run churn), `syncItems` ran
0 times in a 180-second window and `decision_retention` reads were 0 per
second. `check` calls `syncItems` only for entries that are already due
(older than the 90-day archive delay), and a due entry is archived and
leaves the candidates. So I did not batch `syncItems` or skip checks of
unchanged rows.
- `readIssues` still selects the `issues` columns that blocker attention
needs. I did not narrow `issueService.listBlockerAttentionBatch`.

## Risks

- A producer that changes more than the run's task graph would now miss
the wider effect. Company-level changes (agent configuration, company
status, budgets) keep their company hints. The 90-day archive delay
makes a missed reload cheap: the item is reloaded on the next hint that
covers it.
- The saved task id now comes from SQL. The SQL mirrors `readRunIssueId`
for strings, absent keys and JSON null. A non-string `issueId` value now
yields no task, as before.
- No schema change.

## Model Used

- Claude Opus 5.5 (`claude-opus-5-5`), Anthropic, with tool use and code
execution in Claude Code.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [ ] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [ ] I will address all Greptile and reviewer comments before
requesting merge

🤖 Generated with [Claude Code](https://claude.com/claude-code)

---------

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-14 02:17:21 -06:00
DottaandPaperclip dce383c733 perf(server): stop recurring attention retention scans (#18388)
Reviewed and verified at a61af9888e.

Co-Authored-By: Paperclip <noreply@paperclip.ing>
2026-10-31 12:28:40 -05:00
DottaandPaperclip 4e27a82a42 fix(server): wake approval queue seeding from committed changes (#17510)
## Thinking Path

> - Paperclip manages work and human decisions for AI-agent companies.
> - Automatic decision queues store membership for pending attention
sources.
> - The old attention maintenance scan created that membership as a side
effect.
> - Moving approval retention out of the scan also removed approval
queue discovery.
> - Queue API consumers do not build the attention feed first, so they
can miss pending PR approvals.
> - This pull request gives approval queue discovery its own worker and
commit signals.
> - The worker becomes quiet after it saves every missing membership.

## Linked Issues or Issue Description

Refs #17497. Stacked on #17508, following #17505.

This is a correctness dependency for the approval retention migration in
#17497. Do not treat that migration as complete without this
queue-population path. A real PostgreSQL regression found no PR queue
when a pending approval had a linked PR work product and the maintenance
feed excluded approvals.

Related: #13364 proposes pruning stale seeded memberships. This PR
preserves existing membership retention and does not implement pruning.
#15149 documents the decision-queue APIs.

## What Changed

- Add an approval queue worker that selects missing PR-queue memberships
from existing durable records. Bound each pass to 100 rows. Continue
past failed rows and revisit them on retry.
- Reuse the queue service's seed writer through a normalized source
contract. Keep queue rules, uniqueness, and audit writes in that
service. Keep feed readers compatible.
- Wake from committed approval and link changes, issue/company
visibility, PR work-product changes and imports, and queue-rule changes.
Reuse the existing transaction boundaries.
- Recheck approval status under a row lock. Serialize queue-rule changes
with the seed writer. Preserve required recovery during drain and
shutdown.
- Register startup reconstruction under the existing maintenance switch.
Leave other attention-source seeding with its current owner until its
own migration.
- Document the complete producer audit and stack dependency. Add a
validated external PostgreSQL option to the existing queue route suite
so it runs on hosts without embedded database support.

## Verification

Current tested revision: `7948136ef8`. This PR targets master after
#17508 merged as `8406047b4e`. Normal ancestry reconciliation preserved
the complete tested integration tree, before the review repairs below.
Only the original 25 seeding paths differ from master, and database
schema/migration metadata is identical.

- **56 cases pass in the three complete affected suites:** 28 approval
seeding, 6 queue routes and 22 task-watchdog cases. Server typecheck and
production build pass.
- Three real PostgreSQL retry regressions failed then passed: new
matching arrivals cannot postpone a recovered failure indefinitely;
successful partial progress resets old failure penalties; an empty
cursor rollover does not reset outage backoff. Exact one- and two-second
retry assertions, eventual complete recovery and existing
capped-backoff/company isolation tests pass.
- Three genuinely empty external databases failed before setup repair
because tables were missing. Each suite now applies migrations itself.
All 55 cases passed on a second set of fresh databases; adding the final
rollover guard then passed all 56 cases using those now-migrated
fixtures. No production migration or table is added.
- The initial expanded fresh run passed 54 cases but failed a cleanup
expectation that omitted a required cursor rollover pass. The fixture
now permits that explicit continuation while preserving exact deadline
and complete-membership assertions. All failure records remain in
`doc/idle-approval-queue-seeding.md`.
- The prior integrated revision `4e725e2055` passed **522 cases in
fifteen complete producer/consumer suites**, plus types/build. Its
unchanged consumer code and historical deadlock, cross-company
amplification, backoff, gateway integration and setup evidence remain
documented; those counts are not relabeled as current acceptance.

Commands: server Vitest for approval queue seeding, queue routes and
task watchdogs; server typecheck/build. Fresh exact-head
Greptile/Ponytail reviews and all CI checks remain required. No full
local repository-suite, deployed suspension or cost claim is made.

## Risks

- Signals cover the supported in-process service writers. Independent
SQL writers and multiple server replicas need a separate notification
contract.
- The source predicate must stay aligned with unscoped attention
maintenance. The first linked issue, company scope, pending status, and
execution visibility are tested. A pending approval itself keeps its
linked external conversation active.
- Existing enabled seed rules can re-add manually removed matching
memberships. This preserves the old scan's behavior. Completed or
archived membership is not pruned.
- Queue seeding and retention are separate owners. Other attention
sources still need their own event-driven discovery before the aggregate
scan can be retired.
- This PR does not extend Cloud wake coverage, relax sleep admission, or
claim measured host/database suspension.

## Model Used

OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact
serving model identifier and context window were not exposed.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-10-27 20:33:01 -05:00
DottaandPaperclip 8406047b4e fix(server): schedule join request retention from durable deadlines (#17508)
## Thinking Path

> - Paperclip manages agent companies and their access requests.
> - Pending join requests appear in the attention feed and can age into
automatic archival.
> - The maintenance tick reads those requests even when no archive is
due.
> - Existing request rows already store the activity timestamp needed
for retention.
> - Committed changes can wake a worker that registers the next actual
deadline.
> - This PR gives join-request retention its own bounded worker and
removes its recurring feed scan.
> - Idle and resolved history stop producing retention traffic without
changing access approval.

## Linked Issues or Issue Description

**What happened?**

Every retention maintenance pass reads pending join requests through the
attention feed. Empty, resolved, kept, and future-due states still
participate in recurring discovery.

**Expected behavior**

Committed request and retention changes wake the owner. It waits until
the next actual archive deadline and stops querying when no eligible
request remains. Existing approval and visibility behavior is preserved.

**Steps to reproduce**

Start an idle company with no pending join requests, or with requests
younger than the 90-day archive threshold. Observe the maintenance feed
repeatedly select join_requests. No state change is needed to cause
those reads.

This PR targets master after #17505 merged. Approval retention is
#17497. Other attention source kinds remain separate migration duties.
No duplicate open join-retention PR was found.

## What Changed

- Add a join-request retention owner that preserves pending status,
active-company visibility, matching invite ownership, and keep/archive
controls. Invite expiry or revocation retains the existing feed policy.
- Reuse one `createDecisionRetentionSweep` for approval and join paging,
atomic retention and finite scan cycles that revisit failures despite
continuing arrivals. Eligibility and source-row locks stay with each
owner.
- Register real saved deadlines, rounded upward in SQL to millisecond
precision, with the existing coordinator. Preserve 100-row pages and
thirty-second notification coalescing without idle polling.
- Materialize unseen join state inside the existing authorized
keep/archive/revive transaction, preserving archive choices and source
locking.
- Notify before request inserts and updates in the existing acceptance
and Slack transactions. Use a small SQL-only helper for replay and
approval/rejection updates. Company status, budget pause/resume,
deletion, and retention controls notify this owner too.
- Preserve the approved-only API-key consumption path without a new
wrapper; it cannot produce pending retention work.
- Exclude join requests from maintenance feed collection while retaining
normal UI reads.
- Add an idempotent concurrent partial pending index and prune old
schema snapshots through the existing generator.
- Document producer coverage, boundaries, failure evidence, and
remaining work.

## Verification

Test revision: `df1815fbba`. Normal integration of landed workspace
precision `d23dd19750` has an identical complete source tree. This
remains only the join-retention duty and its shared approval-retention
mechanics, targeting master.

- **55 worker cases pass**, including two new PostgreSQL regressions
that failed before repair: continuing overdue arrivals no longer
postpone a recovered failure indefinitely, while an entire failed page
still allows later healthy rows to progress.
- The nine complete suites passed 341 cases but failed an attention
cleanup hook after its 16,400-run case. After vacuum/analyze of only
that disposable fixture, the full 31-case attention suite passes
unchanged. Together with the original eight passing suites (311 cases),
all 342 distinct cases pass across complete-suite executions. Recovery
is established; the original cleanup slowdown is not claimed explained.
Server typecheck and production build pass.
- Earlier CI at `df1d4d0` failed the unchanged decision-expiry restart
deadline assertion (a thirty-second retry appeared before the saved
expiry). All twenty unchanged expiry cases pass locally, but the CI
timing cause remains unproven. No retry, timeout relaxation or assertion
change is used to dismiss it; fresh final-head CI remains required.

- **Five regressions failed before repair:** three unseen join controls
returned 404, and both owners advertised a microsecond deadline one
millisecond early. All pass. Two old real-producer expectations failed
after the correct rounding change; they now derive exact expected
milliseconds independently from database integer microseconds instead of
truncating a JavaScript Date.
- The initial timing-only concurrency test still passed a missing-lock
mutation. It now observes the actual PostgreSQL wait before releasing
the writer. Production passes; removing the lock fails with zero waiters
instead of one. Source is restored before commit. The archive-first
committed-order case confirms that later activity stays archived until
explicit revival; no broader race guarantee is claimed.
- Generated concurrent/idempotent `0393_open_grandmaster.sql` adds only
the pending join index. All 391 parent journal entries and historical
SQL files remain unchanged. Five generated snapshots remain (0389–0393).
Migration safety/numbering, schema drift and actual apply/replay on six
isolated PostgreSQL fixtures pass.
- Existing lifecycle cases retain real HTTP invite
acceptance/approval/rejection, Slack identity linking, rollback/outer
commit, source visibility, failure rotation, drain/resume and shutdown
coverage. Earlier stack setup and CI failures remain in the owning audit
and stack ledger; they are historical evidence, not this head's
acceptance.

Commands: server Vitest for `join-request-retention-work`,
`approval-retention-work`, `approvals-service`, `attention-service`,
`decision-retention-service`, `budgets-service`, `tool-gateway-service`,
`server-startup-feedback-export`, `scoped-deadline-work`; server
typecheck/build; DB migration checks, snapshot drift and actual
apply/replay. Fresh exact-head CI, security and Greptile/Ponytail 5/5
remain required. No full local repository-suite, deployed suspension or
cost claim is made.

## Risks

- A future supported producer must signal its transaction. Independent
SQL writers and another active server process are outside the
process-local notification contract.
- A writer that wins the source lock first is rechecked before archival.
If archival commits first, later activity preserves the archived state
until explicit revival. Existing invite replay expires before the
retention cutoff and Slack replay deduplicates. Future producers needing
renewed visibility must request revival. Cross-table visibility retains
the existing contract.
- The worker registers only under the existing maintenance enablement
switch. The internal deadline does not add Cloud alarm coverage or relax
conservative sleep blockers.
- New eligibility can wait within the thirty-second aggregate
notification window; known deadlines preempt it.
- Archival preserves pending approval status. Other attention sources
and aggregate maintenance remain separate work.

## Model Used

OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact
serving model identifier and context window were not exposed.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-10-27 20:03:16 -05:00
DottaandPaperclip 553a004926 fix(server): schedule approval retention from durable deadlines (#17497)
## Thinking Path

> - Paperclip manages agent work and should become idle when it owes no
background work.
> - The attention feed archives old pending approvals under the existing
90-day policy.
> - The server rebuilds the feed on each maintenance tick, even when
approval state has not changed.
> - Some approvals have never been read, so retention rows alone cannot
define the work.
> - Approval records and committed eligibility changes define the real
deadline and wake triggers.
> - This PR gives approval retention its own deadline worker and reuses
the existing retention and archive-delivery contracts.
> - The approval lane stops idle scans while other attention sources
remain separate migration work.

## Linked Issues or Issue Description

Stacked on #17490. This PR owns approval retention only. Archive
notification delivery is already separated in #17475. Other
attention-source retention and remaining recurring server duties remain
in the stack inventory. The related-PR search found no overlapping
approval-retention worker migration.

**What existing behavior does this improve?**
Automatic archival of old pending approvals from attention.

**Current behavior**
The shared maintenance tick builds the attention feed for each active
company. That query discovers pending approvals and materializes
retention records before checking their age. An unchanged or empty
approval source is read repeatedly.

**Proposed behavior**
Reconstruct eligible approvals at startup. Schedule the earliest
approval activity timestamp plus 90 days. Wake after committed changes
to approvals, links, issue visibility, company activity, or retention
controls. Stop scheduling when no eligible approval remains. Archive
records through the existing version checks, audit writes, and
notification outbox.

**Reason and benefit**
Idle approval retention should generate no recurring SQL. Unseen
approvals still need eventual archival. A stale candidate must not
archive an approval that was resubmitted while the worker waited for its
source lock.

**Breaking changes**
None intended. The archive age, eligibility, keep controls, audit, and
notification policy remain. Normal attention reads still include
approvals. No Cloud sleep blocker is relaxed.

## What Changed

- Restrict tool-review signals to their existing terminal transition
owners (approve/reject/cancel). Creation/link/revision/resubmit signal
retention only.
- Coalesce retention notifications under one thirty-second aggregate
read budget. Known deadlines still preempt it; no notification or
durable deadline means no scan.
- Add a bounded approval-retention worker. It uses the shared deadline
coordinator and reads pending approvals directly.
- Share first-linked-issue ordering and execution visibility through
`approval-visibility.ts`, used by both the feed and worker. Preserve
actor-specific read filtering and locked archival rechecks.
- Materialize unseen approvals on demand inside manual
keep/archive/revive transactions. Use the saved activity timestamp and
existing versioned state; retain company scoping and rollback on
failure.
- Add awaited pre-write signals to approval, budget, tool, link,
visibility, company, and retention mutation owners. Preserve outer
transaction ownership; keep provider calls outside SQL wrappers.
- Narrow retention inputs to the source fields the existing service
uses. Signal materialization only for inserted or changed state so
unchanged reads converge.
- Exclude approval collection from the maintenance feed before its
query. Other source kinds remain in that sweep.
- Add the pending-only approval deadline index with concurrent,
idempotent creation. Keep the five newest migration snapshots.
- Add real-Postgres lifecycle tests and startup wiring tests. Enable
validated external test databases for existing attention and budget
suites.
- Document producer coverage, quiet conditions, recovery and remaining
scope in `doc/idle-approval-retention.md` and the stack ledger.

## Verification

Current test revision: `dd844f4e8cbbf1db681a774dc31cd552301bef48`,
followed by docs-only `3efda33812`, which received both 5/5 reviews and
passing CI. This candidate normally integrates landed Grok `2adcde162e`.
All runtime and acceptance-test sources are byte-identical to that
tested/reviewed tree; only four independent Runner E2E accounting files
and the ledger differ. Migration 0392 and the parent journal prefix are
unchanged. Local checks are reused for their unchanged source; fresh
final-head CI and reviews are required against master. This remains the
approval-retention duty.

- **315 cases pass** across eight complete suites: approval
retention/service, attention, decision retention, budgets, tool gateway,
server startup and scoped deadlines. All 30 real-PostgreSQL lifecycle
cases pass. Server production typecheck and build pass.
- **Four regressions failed before repair**: unseen young
keep/archive/revive returned 404; the manual keep rollback case could
not reach its update. They now pass. A failed keep update leaves no
retention row or audit; retry succeeds with one audit.
- Both linked-issue orders are checked against the feed: hidden
first/visible later is excluded; visible first/hidden later remains
eligible. The feed and worker use the same owner query, with actor read
filtering preserved.
- Generated concurrent/idempotent migration
`0392_small_frightful_four.sql` adds only the pending approval index.
Every historical parent SQL migration and all 390 parent journal entries
are unchanged. Five generated snapshots remain (0388–0392). Schema
drift, migration safety/numbering and actual fresh apply/replay on five
isolated PostgreSQL databases pass.
- Existing precision, transaction, drain/resume, failure fairness and
shutdown tests remain. Earlier transaction-stub, budget-import,
diagnostic-client and CI failures are recorded in the owning audit and
stack ledger; later passes do not erase them.

- Three additional real regressions failed before the wake repair:
ordinary mutations emitted tool-review signals in both resolution cases,
and sequential tenant writes caused repeated global reads. Tests now
prove terminal approve/reject/cancel signals and one aggregate
reconciliation per thirty-second window with a different company's
pending approval retained. The aggregate budget is stricter than a
separate per-company budget and matches the old default cadence; known
deadlines preempt it.
- The initial coalescing fixture expected the concrete pending-work hold
to clear before reconciliation; it now preserves that hold and measures
SQL. The first broad repair passed 313 cases but failed the existing
parked-review cancel case. The original cancel producer is restored; all
315 now pass without weakening assertions. At old head `5991f257bb`,
security was action-required and Greptile returned service error
`8fb1835c-e564-476b-b802-d5be164ea915`. Fresh repaired-head results are
required, not assumed.

Commands: server Vitest for `approval-retention-work`,
`approvals-service`, `attention-service`, `decision-retention-service`,
`budgets-service`, `tool-gateway-service`,
`server-startup-feedback-export`, `scoped-deadline-work`; server
typecheck/build; DB snapshot drift, migration checks and fresh
apply/replay. Fresh exact-head Greptile/Ponytail and CI remain merge
gates. No full local repository suite or deployed host suspension/cost
claim is made.

Earlier stack verification below is historical evidence at the
explicitly named revisions, not this head's acceptance:

Approved delegated Test-tab calls now evaluate caller and target
policies in the existing claim transaction. Real HTTP regressions first
showed a missing caller charge and shared-limit self-rejection. All 78
connection-management cases and 92 gateway cases now pass on the owning
branch, along with server production typechecking. All 78
connection-management cases also pass at combined tip
`d25f830db89c1623bff3547bfc68015c1c66e0cf`. The three new cases cover
shared charges, separate charges, rollback on denial, duplicate
approval, and rejection of a later authorized call. Intermediate
counter/identity fixture failures and a reused-database Slack collision
are recorded in [the owning
audit](https://github.com/paperclipai/paperclip/blob/20557d2c3dd0949c734eaa8095fd78b9b07d7fd5/doc/idle-approved-tool-recovery.md#delegated-test-tab-admission-after-policy-changes).
The earlier combined checks below remain evidence for their stated
revisions. Current-head CI and review remain required.

Earlier published head: `20557d2c3dd0949c734eaa8095fd78b9b07d7fd5`. This
remains a single-duty PR stacked on #17490.

- Integrated pinned master `8548173fc9efdc0fa07644fb92dcc0b6851a95e5`
with normal merges. Every branch passed generated-schema checks and its
target-branch migration-order gate. Existing SQL is unchanged; the 25
stack migrations follow master’s new migration.
- Duty-specific producer coverage, lifecycle tests, and earlier failure
records:
[2026-10-24-recurring-server-sleep-stack.md](https://github.com/paperclipai/paperclip/blob/76a49810c7ff403ae7720bef0d453747bd844731/doc/plans/2026-10-24-recurring-server-sleep-stack.md).
- Combined tip `51e6cbe67979b55b340ea9f0f434c5b5c682ccd6`: **355
startup/cancellation/recovery/dispatch/preservation tests**, **75
connection-management tests**, and production server typechecking pass.
These combined checks do not mean every intermediate PR independently
ran the full repository suite.
- Real master-to-stack database upgrade passes: **379 unchanged prior
migration receipts plus 25 new migrations**, with the gateway
responsibility fixture preserved.
- Owning-branch checks: 84 runner installation/settlement cases plus
runner typechecking and generated TypeScript/Rust profile agreement; 253
GitHub review workflow cases. Stop-attribution and held-worker readiness
regressions failed before their fixes.
- Failure accounting: the initial combined run passed 349 cases and
failed six idle assertions in a reused preservation database containing
old cancelled runs. Repeating the combined command with a fresh
preservation database passed. Earlier invalid project selection, merge
import/type errors, and the interrupted full local suite are not counted
as passing checks.
- **Latest-head CI and review remain required.** Prior CI findings
include GitHub idle observation, route teardown, attention cleanup,
touch-picker E2E, workspace health, and voice-cleanup timing; local
passes do not erase those failures. No full local repository-suite,
deployed sleep, fleet cost, or live Copilot qualification claim is made.

## Risks

- Signals cover the application database owner and its child pools.
Independent SQL writers and other active processes need an explicit wake
integration. Startup reconstructs committed durable state.
- The source row lock prevents stale approval-activity archival. It does
not add cross-table serializability for concurrent link, visibility, or
company-policy changes.
- Newly changed eligibility can wait up to the thirty-second
notification window, matching the former default maintenance cadence.
Saved deadlines still preempt; no new idle polling is added.
- Failed records retain recovery debt. Bounded cursor progress lets
later rows proceed without dropping failures.
- The shared retention transaction now groups materialization and
activity-version updates. Existing attention and retention consumers are
tested against PostgreSQL.
- Kept, archived, resolved or inactive-company approvals can become
quiet, but their supported mutations must retain their wake
notifications.
- The local scheduler cannot wake stopped compute. This PR neither adds
approval deadlines to Cloud's external alarm contract nor claims
measured host or database suspension.

## Model Used

OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact
serving model identifier and context window were not exposed.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-10-27 19:23:24 -05:00