mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-11-23 13:13:46 +01:00
f4a3f85b89b2dae7889b0a9c7fee07ed47b554cb
5
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
e8c79235ca |
perf(attention): scope run lifecycle retention hints and read only used columns (#21579)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work > - The `attention-retention` queue archives old attention items (failed runs, reviews, questions, recovery actions, blocked tasks). A company hint makes it reload every candidate of the company, 100 per page, with eligibility reads for each page. > - Several run lifecycle producers sent that company hint: every agent status change after a run, the execution-control writes and legacy run terminalization when they name only a run, scheduled retries, and the Runner's task monitor tool. > - Each page also read whole rows it did not use: full `heartbeat_runs` rows (recent ones carry tens of KB of `context_snapshot` and `runner_profile_json`), full `issues` rows (descriptions), and the whole agent roster with its configuration. > - This pull request names the task graph or the source kind in those hints, and reads only the columns each eligibility decision uses. > - The benefit is fewer company reloads per run event and far fewer result bytes per reconstruction, with the same decisions. ## Linked Issues or Issue Description No issue exists. This describes the problem with the fields of `.github/ISSUE_TEMPLATE/enhancement.yml`. Stacked on #21552 (it builds on that pull request's change to `execution-control-notifications.ts`); review that one first. **What existing behavior does this improve?** The attention retention queue (`server/src/services/attention-retention.ts`) and the producers that wake it on run lifecycle paths. **Subsystem affected** Server background retention (`attention-retention.ts`, `retention-work-notifications.ts`, `execution-control-notifications.ts`, `heartbeat/agent-status.ts`, `heartbeat/retries.ts`, `native-runtime/paperclip-runner-tool-authority.ts`). **Current behavior** - `heartbeat/agent-status.ts` sends `{ companyId }` on every agent status change after a run (two places). `heartbeat/retries.ts` sends it for each scheduled retry. `writeExecutionControl` and `notifyExecutionRunWork` send it when the scope names only a run. The Runner's `set_task_monitor` tool sends it for one task. - On a local fixture with 1,500 open tasks and run churn, the queue loaded 47 company candidate rows per second from these hints. - `pageEvidence` read `select *` from `heartbeat_runs`, `issue_recovery_actions` and (through `getTableColumns`) `issues`; `reviewEligibility` read `select *` from `issues`; `interactionEligibility` read the full agent roster; the per-entry `check` repeated full-row reads. **Proposed behavior** - Agent status changes send `{ companyId, sourceKind: "agent_error_alert" }`. The status moves between `running`, `idle` and `error`. All three are invokable for blocker attention (`BLOCKER_ATTENTION_INVOKABLE_AGENT_STATUSES`) and for questions (`agent-eligibility.ts`). Failed-run attention only excludes terminated agents, and this path never sets that. So only agent error alerts can change. - Run-scoped execution-control writes, legacy run terminalization and scheduled retries use `notifyIssueAttentionRetentionWork` with the run id (the run's task, its parents and the tasks it blocks; company fallback past 100). This is the same helper as #21521. The task monitor tool scopes to its task. - `notifyIssueAttentionRetentionWork` matched the run's saved task id with `issue.id::text = …`. It now validates and casts the id, so the primary key is used, as #21552 does for recovery. - Narrow reads, same decisions: - runs: `id`, `agent_id`, `created_at` and the saved task id computed in SQL with the same rules as `readRunIssueId` (`issueId` unless it is absent or JSON null, then `taskId`; only non-empty strings). - recovery actions: `id`, `source_issue_id`. - issues for evidence and `visibleIssue`: the blocker-attention input columns plus `unblock_descriptor` and `blocked_transition_at`. - review issues: `id`, `company_id`, `status`, `execution_state`, `assignee_user_id`. - agent roster for question addressees: `id`, `company_id`, `name`, `reports_to`, `status` (the `AgentOrgRow` that `evaluateAgentInvokability` takes). **Reason and benefit** A run event no longer reloads every attention candidate of the company. A reconstruction no longer transfers whole run, task and agent rows. ## What Changed - `server/src/services/attention-retention.ts`: column lists for runs, recovery actions, issues and the roster; the run probe type replaces whole rows. - `server/src/services/heartbeat/agent-status.ts`, `heartbeat/retries.ts`, `execution-control-notifications.ts`, `native-runtime/paperclip-runner-tool-authority.ts`: scoped attention hints. - `server/src/services/retention-work-notifications.ts`: indexed lookup of a run's saved task. - `server/src/__tests__/attention-retention-work.test.ts`: two tests. ## Verification - `reads only the fields its decisions use from large runs, reviews and agents` (I saw it fail first): 50 failed runs, 50 tasks in review with large descriptions, 10 questions to a paused agent, about 40 KB of payload in each run's snapshot, profile and stdout and in the agents' configuration. It loads the three kinds with the full-size response capture (`full-database-response-capture.ts`). Before: `heartbeat_runs` 6,317,700 bytes, `agents` 84,336 bytes, `issues` 4,235,810 bytes. After: under the test bounds of 20,000, 5,000 and 60,000 bytes. The decisions are the same before and after: 50 failed runs, 40 reviews and 10 questions. - `scopes run lifecycle attention hints to the run's task graph and agent status to agent alerts` (I saw it fail first): `writeExecutionControl` and `notifyExecutionRunWork` with a run id send the hint for the task and its parent. `finalizeAgentStatus` sends the agent-alert hint. Before, all three sent `{ companyId }`. - `attention-retention-work` (57 tests), `attention-retention-candidates`, `attention-service`, `execution-control-work` and `heartbeat-agent-status-recovery` pass, each file run alone (in `server/`, against a dedicated local `_test` database). - `pnpm check:module-boundaries` passes. Not done in this pull request, and why: - I did not reproduce `syncItems` re-syncing unchanged rows from the retention `check`. On my fixture (300 stalled blocked tasks, 4,500 old recovery-action and blocker retention rows, run churn), `syncItems` ran 0 times in a 180-second window and `decision_retention` reads were 0 per second. `check` calls `syncItems` only for entries that are already due (older than the 90-day archive delay), and a due entry is archived and leaves the candidates. So I did not batch `syncItems` or skip checks of unchanged rows. - `readIssues` still selects the `issues` columns that blocker attention needs. I did not narrow `issueService.listBlockerAttentionBatch`. ## Risks - A producer that changes more than the run's task graph would now miss the wider effect. Company-level changes (agent configuration, company status, budgets) keep their company hints. The 90-day archive delay makes a missed reload cheap: the item is reloaded on the next hint that covers it. - The saved task id now comes from SQL. The SQL mirrors `readRunIssueId` for strings, absent keys and JSON null. A non-string `issueId` value now yields no task, as before. - No schema change. ## Model Used - Claude Opus 5.5 (`claude-opus-5-5`), Anthropic, with tool use and code execution in Claude Code. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [ ] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [ ] I will address all Greptile and reviewer comments before requesting merge 🤖 Generated with [Claude Code](https://claude.com/claude-code) --------- Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> |
||
|
|
dce383c733 |
perf(server): stop recurring attention retention scans (#18388)
Reviewed and verified at
|
||
|
|
4e27a82a42 |
fix(server): wake approval queue seeding from committed changes (#17510)
## Thinking Path > - Paperclip manages work and human decisions for AI-agent companies. > - Automatic decision queues store membership for pending attention sources. > - The old attention maintenance scan created that membership as a side effect. > - Moving approval retention out of the scan also removed approval queue discovery. > - Queue API consumers do not build the attention feed first, so they can miss pending PR approvals. > - This pull request gives approval queue discovery its own worker and commit signals. > - The worker becomes quiet after it saves every missing membership. ## Linked Issues or Issue Description Refs #17497. Stacked on #17508, following #17505. This is a correctness dependency for the approval retention migration in #17497. Do not treat that migration as complete without this queue-population path. A real PostgreSQL regression found no PR queue when a pending approval had a linked PR work product and the maintenance feed excluded approvals. Related: #13364 proposes pruning stale seeded memberships. This PR preserves existing membership retention and does not implement pruning. #15149 documents the decision-queue APIs. ## What Changed - Add an approval queue worker that selects missing PR-queue memberships from existing durable records. Bound each pass to 100 rows. Continue past failed rows and revisit them on retry. - Reuse the queue service's seed writer through a normalized source contract. Keep queue rules, uniqueness, and audit writes in that service. Keep feed readers compatible. - Wake from committed approval and link changes, issue/company visibility, PR work-product changes and imports, and queue-rule changes. Reuse the existing transaction boundaries. - Recheck approval status under a row lock. Serialize queue-rule changes with the seed writer. Preserve required recovery during drain and shutdown. - Register startup reconstruction under the existing maintenance switch. Leave other attention-source seeding with its current owner until its own migration. - Document the complete producer audit and stack dependency. Add a validated external PostgreSQL option to the existing queue route suite so it runs on hosts without embedded database support. ## Verification Current tested revision: `7948136ef8`. This PR targets master after #17508 merged as `8406047b4e`. Normal ancestry reconciliation preserved the complete tested integration tree, before the review repairs below. Only the original 25 seeding paths differ from master, and database schema/migration metadata is identical. - **56 cases pass in the three complete affected suites:** 28 approval seeding, 6 queue routes and 22 task-watchdog cases. Server typecheck and production build pass. - Three real PostgreSQL retry regressions failed then passed: new matching arrivals cannot postpone a recovered failure indefinitely; successful partial progress resets old failure penalties; an empty cursor rollover does not reset outage backoff. Exact one- and two-second retry assertions, eventual complete recovery and existing capped-backoff/company isolation tests pass. - Three genuinely empty external databases failed before setup repair because tables were missing. Each suite now applies migrations itself. All 55 cases passed on a second set of fresh databases; adding the final rollover guard then passed all 56 cases using those now-migrated fixtures. No production migration or table is added. - The initial expanded fresh run passed 54 cases but failed a cleanup expectation that omitted a required cursor rollover pass. The fixture now permits that explicit continuation while preserving exact deadline and complete-membership assertions. All failure records remain in `doc/idle-approval-queue-seeding.md`. - The prior integrated revision `4e725e2055` passed **522 cases in fifteen complete producer/consumer suites**, plus types/build. Its unchanged consumer code and historical deadlock, cross-company amplification, backoff, gateway integration and setup evidence remain documented; those counts are not relabeled as current acceptance. Commands: server Vitest for approval queue seeding, queue routes and task watchdogs; server typecheck/build. Fresh exact-head Greptile/Ponytail reviews and all CI checks remain required. No full local repository-suite, deployed suspension or cost claim is made. ## Risks - Signals cover the supported in-process service writers. Independent SQL writers and multiple server replicas need a separate notification contract. - The source predicate must stay aligned with unscoped attention maintenance. The first linked issue, company scope, pending status, and execution visibility are tested. A pending approval itself keeps its linked external conversation active. - Existing enabled seed rules can re-add manually removed matching memberships. This preserves the old scan's behavior. Completed or archived membership is not pruned. - Queue seeding and retention are separate owners. Other attention sources still need their own event-driven discovery before the aggregate scan can be retired. - This PR does not extend Cloud wake coverage, relax sleep admission, or claim measured host/database suspension. ## Model Used OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact serving model identifier and context window were not exposed. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |
||
|
|
8406047b4e |
fix(server): schedule join request retention from durable deadlines (#17508)
## Thinking Path > - Paperclip manages agent companies and their access requests. > - Pending join requests appear in the attention feed and can age into automatic archival. > - The maintenance tick reads those requests even when no archive is due. > - Existing request rows already store the activity timestamp needed for retention. > - Committed changes can wake a worker that registers the next actual deadline. > - This PR gives join-request retention its own bounded worker and removes its recurring feed scan. > - Idle and resolved history stop producing retention traffic without changing access approval. ## Linked Issues or Issue Description **What happened?** Every retention maintenance pass reads pending join requests through the attention feed. Empty, resolved, kept, and future-due states still participate in recurring discovery. **Expected behavior** Committed request and retention changes wake the owner. It waits until the next actual archive deadline and stops querying when no eligible request remains. Existing approval and visibility behavior is preserved. **Steps to reproduce** Start an idle company with no pending join requests, or with requests younger than the 90-day archive threshold. Observe the maintenance feed repeatedly select join_requests. No state change is needed to cause those reads. This PR targets master after #17505 merged. Approval retention is #17497. Other attention source kinds remain separate migration duties. No duplicate open join-retention PR was found. ## What Changed - Add a join-request retention owner that preserves pending status, active-company visibility, matching invite ownership, and keep/archive controls. Invite expiry or revocation retains the existing feed policy. - Reuse one `createDecisionRetentionSweep` for approval and join paging, atomic retention and finite scan cycles that revisit failures despite continuing arrivals. Eligibility and source-row locks stay with each owner. - Register real saved deadlines, rounded upward in SQL to millisecond precision, with the existing coordinator. Preserve 100-row pages and thirty-second notification coalescing without idle polling. - Materialize unseen join state inside the existing authorized keep/archive/revive transaction, preserving archive choices and source locking. - Notify before request inserts and updates in the existing acceptance and Slack transactions. Use a small SQL-only helper for replay and approval/rejection updates. Company status, budget pause/resume, deletion, and retention controls notify this owner too. - Preserve the approved-only API-key consumption path without a new wrapper; it cannot produce pending retention work. - Exclude join requests from maintenance feed collection while retaining normal UI reads. - Add an idempotent concurrent partial pending index and prune old schema snapshots through the existing generator. - Document producer coverage, boundaries, failure evidence, and remaining work. ## Verification Test revision: `df1815fbba`. Normal integration of landed workspace precision `d23dd19750` has an identical complete source tree. This remains only the join-retention duty and its shared approval-retention mechanics, targeting master. - **55 worker cases pass**, including two new PostgreSQL regressions that failed before repair: continuing overdue arrivals no longer postpone a recovered failure indefinitely, while an entire failed page still allows later healthy rows to progress. - The nine complete suites passed 341 cases but failed an attention cleanup hook after its 16,400-run case. After vacuum/analyze of only that disposable fixture, the full 31-case attention suite passes unchanged. Together with the original eight passing suites (311 cases), all 342 distinct cases pass across complete-suite executions. Recovery is established; the original cleanup slowdown is not claimed explained. Server typecheck and production build pass. - Earlier CI at `df1d4d0` failed the unchanged decision-expiry restart deadline assertion (a thirty-second retry appeared before the saved expiry). All twenty unchanged expiry cases pass locally, but the CI timing cause remains unproven. No retry, timeout relaxation or assertion change is used to dismiss it; fresh final-head CI remains required. - **Five regressions failed before repair:** three unseen join controls returned 404, and both owners advertised a microsecond deadline one millisecond early. All pass. Two old real-producer expectations failed after the correct rounding change; they now derive exact expected milliseconds independently from database integer microseconds instead of truncating a JavaScript Date. - The initial timing-only concurrency test still passed a missing-lock mutation. It now observes the actual PostgreSQL wait before releasing the writer. Production passes; removing the lock fails with zero waiters instead of one. Source is restored before commit. The archive-first committed-order case confirms that later activity stays archived until explicit revival; no broader race guarantee is claimed. - Generated concurrent/idempotent `0393_open_grandmaster.sql` adds only the pending join index. All 391 parent journal entries and historical SQL files remain unchanged. Five generated snapshots remain (0389–0393). Migration safety/numbering, schema drift and actual apply/replay on six isolated PostgreSQL fixtures pass. - Existing lifecycle cases retain real HTTP invite acceptance/approval/rejection, Slack identity linking, rollback/outer commit, source visibility, failure rotation, drain/resume and shutdown coverage. Earlier stack setup and CI failures remain in the owning audit and stack ledger; they are historical evidence, not this head's acceptance. Commands: server Vitest for `join-request-retention-work`, `approval-retention-work`, `approvals-service`, `attention-service`, `decision-retention-service`, `budgets-service`, `tool-gateway-service`, `server-startup-feedback-export`, `scoped-deadline-work`; server typecheck/build; DB migration checks, snapshot drift and actual apply/replay. Fresh exact-head CI, security and Greptile/Ponytail 5/5 remain required. No full local repository-suite, deployed suspension or cost claim is made. ## Risks - A future supported producer must signal its transaction. Independent SQL writers and another active server process are outside the process-local notification contract. - A writer that wins the source lock first is rechecked before archival. If archival commits first, later activity preserves the archived state until explicit revival. Existing invite replay expires before the retention cutoff and Slack replay deduplicates. Future producers needing renewed visibility must request revival. Cross-table visibility retains the existing contract. - The worker registers only under the existing maintenance enablement switch. The internal deadline does not add Cloud alarm coverage or relax conservative sleep blockers. - New eligibility can wait within the thirty-second aggregate notification window; known deadlines preempt it. - Archival preserves pending approval status. Other attention sources and aggregate maintenance remain separate work. ## Model Used OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact serving model identifier and context window were not exposed. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |
||
|
|
553a004926 |
fix(server): schedule approval retention from durable deadlines (#17497)
## Thinking Path > - Paperclip manages agent work and should become idle when it owes no background work. > - The attention feed archives old pending approvals under the existing 90-day policy. > - The server rebuilds the feed on each maintenance tick, even when approval state has not changed. > - Some approvals have never been read, so retention rows alone cannot define the work. > - Approval records and committed eligibility changes define the real deadline and wake triggers. > - This PR gives approval retention its own deadline worker and reuses the existing retention and archive-delivery contracts. > - The approval lane stops idle scans while other attention sources remain separate migration work. ## Linked Issues or Issue Description Stacked on #17490. This PR owns approval retention only. Archive notification delivery is already separated in #17475. Other attention-source retention and remaining recurring server duties remain in the stack inventory. The related-PR search found no overlapping approval-retention worker migration. **What existing behavior does this improve?** Automatic archival of old pending approvals from attention. **Current behavior** The shared maintenance tick builds the attention feed for each active company. That query discovers pending approvals and materializes retention records before checking their age. An unchanged or empty approval source is read repeatedly. **Proposed behavior** Reconstruct eligible approvals at startup. Schedule the earliest approval activity timestamp plus 90 days. Wake after committed changes to approvals, links, issue visibility, company activity, or retention controls. Stop scheduling when no eligible approval remains. Archive records through the existing version checks, audit writes, and notification outbox. **Reason and benefit** Idle approval retention should generate no recurring SQL. Unseen approvals still need eventual archival. A stale candidate must not archive an approval that was resubmitted while the worker waited for its source lock. **Breaking changes** None intended. The archive age, eligibility, keep controls, audit, and notification policy remain. Normal attention reads still include approvals. No Cloud sleep blocker is relaxed. ## What Changed - Restrict tool-review signals to their existing terminal transition owners (approve/reject/cancel). Creation/link/revision/resubmit signal retention only. - Coalesce retention notifications under one thirty-second aggregate read budget. Known deadlines still preempt it; no notification or durable deadline means no scan. - Add a bounded approval-retention worker. It uses the shared deadline coordinator and reads pending approvals directly. - Share first-linked-issue ordering and execution visibility through `approval-visibility.ts`, used by both the feed and worker. Preserve actor-specific read filtering and locked archival rechecks. - Materialize unseen approvals on demand inside manual keep/archive/revive transactions. Use the saved activity timestamp and existing versioned state; retain company scoping and rollback on failure. - Add awaited pre-write signals to approval, budget, tool, link, visibility, company, and retention mutation owners. Preserve outer transaction ownership; keep provider calls outside SQL wrappers. - Narrow retention inputs to the source fields the existing service uses. Signal materialization only for inserted or changed state so unchanged reads converge. - Exclude approval collection from the maintenance feed before its query. Other source kinds remain in that sweep. - Add the pending-only approval deadline index with concurrent, idempotent creation. Keep the five newest migration snapshots. - Add real-Postgres lifecycle tests and startup wiring tests. Enable validated external test databases for existing attention and budget suites. - Document producer coverage, quiet conditions, recovery and remaining scope in `doc/idle-approval-retention.md` and the stack ledger. ## Verification Current test revision: `dd844f4e8cbbf1db681a774dc31cd552301bef48`, followed by docs-only `3efda33812`, which received both 5/5 reviews and passing CI. This candidate normally integrates landed Grok `2adcde162e`. All runtime and acceptance-test sources are byte-identical to that tested/reviewed tree; only four independent Runner E2E accounting files and the ledger differ. Migration 0392 and the parent journal prefix are unchanged. Local checks are reused for their unchanged source; fresh final-head CI and reviews are required against master. This remains the approval-retention duty. - **315 cases pass** across eight complete suites: approval retention/service, attention, decision retention, budgets, tool gateway, server startup and scoped deadlines. All 30 real-PostgreSQL lifecycle cases pass. Server production typecheck and build pass. - **Four regressions failed before repair**: unseen young keep/archive/revive returned 404; the manual keep rollback case could not reach its update. They now pass. A failed keep update leaves no retention row or audit; retry succeeds with one audit. - Both linked-issue orders are checked against the feed: hidden first/visible later is excluded; visible first/hidden later remains eligible. The feed and worker use the same owner query, with actor read filtering preserved. - Generated concurrent/idempotent migration `0392_small_frightful_four.sql` adds only the pending approval index. Every historical parent SQL migration and all 390 parent journal entries are unchanged. Five generated snapshots remain (0388–0392). Schema drift, migration safety/numbering and actual fresh apply/replay on five isolated PostgreSQL databases pass. - Existing precision, transaction, drain/resume, failure fairness and shutdown tests remain. Earlier transaction-stub, budget-import, diagnostic-client and CI failures are recorded in the owning audit and stack ledger; later passes do not erase them. - Three additional real regressions failed before the wake repair: ordinary mutations emitted tool-review signals in both resolution cases, and sequential tenant writes caused repeated global reads. Tests now prove terminal approve/reject/cancel signals and one aggregate reconciliation per thirty-second window with a different company's pending approval retained. The aggregate budget is stricter than a separate per-company budget and matches the old default cadence; known deadlines preempt it. - The initial coalescing fixture expected the concrete pending-work hold to clear before reconciliation; it now preserves that hold and measures SQL. The first broad repair passed 313 cases but failed the existing parked-review cancel case. The original cancel producer is restored; all 315 now pass without weakening assertions. At old head `5991f257bb`, security was action-required and Greptile returned service error `8fb1835c-e564-476b-b802-d5be164ea915`. Fresh repaired-head results are required, not assumed. Commands: server Vitest for `approval-retention-work`, `approvals-service`, `attention-service`, `decision-retention-service`, `budgets-service`, `tool-gateway-service`, `server-startup-feedback-export`, `scoped-deadline-work`; server typecheck/build; DB snapshot drift, migration checks and fresh apply/replay. Fresh exact-head Greptile/Ponytail and CI remain merge gates. No full local repository suite or deployed host suspension/cost claim is made. Earlier stack verification below is historical evidence at the explicitly named revisions, not this head's acceptance: Approved delegated Test-tab calls now evaluate caller and target policies in the existing claim transaction. Real HTTP regressions first showed a missing caller charge and shared-limit self-rejection. All 78 connection-management cases and 92 gateway cases now pass on the owning branch, along with server production typechecking. All 78 connection-management cases also pass at combined tip `d25f830db89c1623bff3547bfc68015c1c66e0cf`. The three new cases cover shared charges, separate charges, rollback on denial, duplicate approval, and rejection of a later authorized call. Intermediate counter/identity fixture failures and a reused-database Slack collision are recorded in [the owning audit](https://github.com/paperclipai/paperclip/blob/20557d2c3dd0949c734eaa8095fd78b9b07d7fd5/doc/idle-approved-tool-recovery.md#delegated-test-tab-admission-after-policy-changes). The earlier combined checks below remain evidence for their stated revisions. Current-head CI and review remain required. Earlier published head: `20557d2c3dd0949c734eaa8095fd78b9b07d7fd5`. This remains a single-duty PR stacked on #17490. - Integrated pinned master `8548173fc9efdc0fa07644fb92dcc0b6851a95e5` with normal merges. Every branch passed generated-schema checks and its target-branch migration-order gate. Existing SQL is unchanged; the 25 stack migrations follow master’s new migration. - Duty-specific producer coverage, lifecycle tests, and earlier failure records: [2026-10-24-recurring-server-sleep-stack.md](https://github.com/paperclipai/paperclip/blob/76a49810c7ff403ae7720bef0d453747bd844731/doc/plans/2026-10-24-recurring-server-sleep-stack.md). - Combined tip `51e6cbe67979b55b340ea9f0f434c5b5c682ccd6`: **355 startup/cancellation/recovery/dispatch/preservation tests**, **75 connection-management tests**, and production server typechecking pass. These combined checks do not mean every intermediate PR independently ran the full repository suite. - Real master-to-stack database upgrade passes: **379 unchanged prior migration receipts plus 25 new migrations**, with the gateway responsibility fixture preserved. - Owning-branch checks: 84 runner installation/settlement cases plus runner typechecking and generated TypeScript/Rust profile agreement; 253 GitHub review workflow cases. Stop-attribution and held-worker readiness regressions failed before their fixes. - Failure accounting: the initial combined run passed 349 cases and failed six idle assertions in a reused preservation database containing old cancelled runs. Repeating the combined command with a fresh preservation database passed. Earlier invalid project selection, merge import/type errors, and the interrupted full local suite are not counted as passing checks. - **Latest-head CI and review remain required.** Prior CI findings include GitHub idle observation, route teardown, attention cleanup, touch-picker E2E, workspace health, and voice-cleanup timing; local passes do not erase those failures. No full local repository-suite, deployed sleep, fleet cost, or live Copilot qualification claim is made. ## Risks - Signals cover the application database owner and its child pools. Independent SQL writers and other active processes need an explicit wake integration. Startup reconstructs committed durable state. - The source row lock prevents stale approval-activity archival. It does not add cross-table serializability for concurrent link, visibility, or company-policy changes. - Newly changed eligibility can wait up to the thirty-second notification window, matching the former default maintenance cadence. Saved deadlines still preempt; no new idle polling is added. - Failed records retain recovery debt. Bounded cursor progress lets later rows proceed without dropping failures. - The shared retention transaction now groups materialization and activity-version updates. Existing attention and retention consumers are tested against PostgreSQL. - Kept, archived, resolved or inactive-company approvals can become quiet, but their supported mutations must retain their wake notifications. - The local scheduler cannot wake stopped compute. This PR neither adds approval deadlines to Cloud's external alarm contract nor claims measured host or database suspension. ## Model Used OpenAI Codex, GPT-6 family, with reasoning and code execution. The exact serving model identifier and context window were not exposed. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |