DottaandClaude Opus 5.5 f71aa135a0 fix(server): release sandbox leases for runs stopped before runner attach (#21788)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work
> - Agents in a `sandbox` environment run each task in a paid remote
sandbox that an environment lease tracks
> - When a run stops, the control plane must release that lease, and
terminating an agent waits until every lease of the agent is released
> - In a load test, a run stopped after its sandbox was ready but before
its runner started never released its lease, so the sandbox kept running
and the agent stayed in "terminating" forever
> - In the same test, terminating an agent whose failed run had a
scheduled same-run retry waited about 18 minutes, until the stale retry
time
> - This pull request makes lease release finish for every stop window,
records any release that must wait with a retry time, adds a hint-driven
safety net, and makes termination cancel a pending native retry at once
> - The benefit is that a stopped run never leaves a paid sandbox
running, and agent termination finishes in seconds without manual repair

## Linked Issues or Issue Description

**What happened?**
A load test with ten OpenCode agents in a `sandbox` environment stopped
its agents mid-run (pause, then terminate). Two defects appeared.
1. A run cancelled while it selected its provider pack (after the
sandbox was acquired and the workspace was prepared, before the runner
started) kept its environment lease `active` for more than 40 minutes.
The agent stayed in lifecycle `terminating`. The lifecycle worker
retried every pass and wrote `updatedAt` each time with no recorded
reason. Delete returned 409 "Complete termination before deleting the
agent".
2. A failed native run with a scheduled bootstrap retry kept its lease
until the stale retry time. Agent termination took about 18 minutes. The
run still showed "retry_scheduled" after the agent was terminated.

**Expected behavior**
A stopped run releases its sandbox lease within seconds. If release must
wait, the wait has a recorded reason and retry time, and a background
pass finishes it. Terminating an agent cancels a pending retry, releases
its lease, and reaches `terminated` promptly.

**Steps to reproduce**
1. Start a native run in a `sandbox` environment.
2. Stop it after the sandbox is acquired and the workspace is prepared,
before the runner starts.
3. Pause and then terminate the agent.
4. See that the lease stays `active` and the agent stays `terminating`.

**Paperclip version or commit**
Reproduced on `master` at 62033b9994 (load test build 2026.1106.0+2564).

**Relevant logs or output**
Root causes found in the code:
- `releaseEnvironmentLeasesForRun` returned with no record when
workspace retention refused a cancelled run. The refusal was permanent
when the run's native finalization owner had expired but was not
cleared. The owner is cleared only after `agentExecutionsHaveStopped`
sees every lease released, so the two waited on each other.
- `releaseRunLeases` silently skipped a lease whose prepared native
workspace was still "pending export", even for a run that never started
a runner and so never changed those files.
- The destroy path deferred on any busy warm session in the same
environment, also with no record.
- `stopInvocationsForAgents` returned on the first run that was still
live, so it did not release the leases of the other runs of the agent.
- The agent stop cancelled only `queued`, `running` and
`scheduled_retry` runs. A failed native run with a pending same-run
retry kept its lease until that retry fired.
- The lifecycle worker deferred a pending host step by 2 seconds every
pass, with no reason and no backoff.

## What Changed

- `releaseEnvironmentLeasesForRun` (`run-control.ts`):
- A native run with no runner launch evidence (no
`native.process_start_requested`, no runner event, no process id) skips
workspace retention and warm-session closing. No runner process exists
to fence, and no work ran against the prepared files.
- When retention is refused only because the run's native finalization
owner lease has expired, the release clears that expired owner
(compare-and-set on the exact expired owner of a cancelled run with no
result) and retries retention once. A recorded recovery then stops and
retains the sandbox, so the files stay recoverable.
- Every release that cannot finish now records
`metadata.releaseDeferral` (`reason`, `attempts`, `retryAt`,
disposition) on the active lease and publishes an `orphan-active-leases`
hint. The retry time backs off from 30 seconds to 15 minutes, then
retries hourly without end. The record keeps `failingSince` and the last
reason. A new Stop or terminate operation, or a server restart, triggers
an immediate attempt.
- `nativeWorkspaceExportPendingForLease` treats a cancelled run with no
runner launch evidence as owing no export.
- Safety net: `sweepOrphanedActiveLeases` (the existing hint- and
deadline-driven orphan-lease work) now retries the run's own release for
a due deferral or for a cancelled native run, after the native owner
lease has expired. The orphan-lease loader uses the stored `retryAt` as
the due time. No new timer or poller.
- Agent stop:
- It cancels a failed native run that has a pending same-run retry (or
an interrupted cancellation of one), through the existing
retry-cancellation path. A pause stamps `pauseStop` on those runs too,
so a budget resume can continue them.
- It releases the leases of every terminal run, and it skips a lease
whose deferral is not yet due.
- `agentInvocationStopBlocker` and `agentExecutionStopBlocker` return
why the stop must still wait.
- Lifecycle worker: a pending host or plugin step records
`pendingReason` and `pendingPasses` on the operation, and its retry
backs off from 2 seconds to a 60 second cap. When a release leaves a run
with no unsettled lease, the stopping agent's saved retry time is
cleared and the lifecycle queue is notified, so Pause or Terminate
finishes on the next pass.
- Cancelled-workspace preservation: a stopped run that never started a
runner has its prepared reference moved to
`nativeWorkspaceSyncReleasedUnchanged` when its lease is released, so
the preservation worker no longer selects it. The worker records the
same settlement itself for older runs, and waits on a live owner's exact
lease expiry.

## Verification

- Red on `master`, green on this branch (embedded PostgreSQL, fake
plugin sandbox provider):
-
`server/src/__tests__/heartbeat-lease-release-before-runner-attach.test.ts`:
agent pause then terminate, and board Stop, for each window between
sandbox acquire and runner attach (artifact discovery, pack select, pack
upload, runner launch, transport connect, session open). Each test
checks that the provider gets a stop or destroy call, the lease is
released, the run is cancelled, and the agent reaches `terminated`
within one extra worker pass. It also checks the orphan-lease safety net
for a leaked lease and a recorded deferral that the background pass
finishes when due.
-
`server/src/__tests__/heartbeat-terminate-pending-native-retry.test.ts`:
terminating an agent whose failed run has a bootstrap retry 17 minutes
away cancels the retry, releases the lease and reaches `terminated` at
once. The test covers an open task and a cancelled task.
-
`server/src/modules/agent-lifecycle/__tests__/pending-backoff.test.ts`:
a host step that stays pending records its reason, and its retry delay
grows to a 60 second cap.
- Related suites pass: run-control, recovery, orphaned active lease
sweep, environment runtime, agent lifecycle, native workspace
preservation and recovery, held comment wake.
- `server` typecheck passes.

## Risks

- A cancelled native run with no launch evidence now gets its prepared
sandbox destroyed instead of kept. The proof is the same launch evidence
that restart recovery uses.
- A launched cancelled run whose retention owes nothing is stopped and
retained, as before. A retention that throws (lock or write error, or a
live owner) now keeps the lease active with a recorded reason and retry
time, instead of a silent skip.
- Release now clears an expired native finalization owner of a cancelled
run. An old controller whose lease already expired then fails its next
owner check and stops, which is the normal lease rule.
- On the first start after deploy, the orphan-lease work releases leases
already leaked by cancelled native runs.
- Task state after pause then terminate: the run-scoped stop keeps the
task status (an open task stays open, a cancelled task stays cancelled),
and a run that held prepared files gets the existing workspace recovery
record on its stopped sandbox. No new state is added.

## Model Used

- Claude Opus 5.5 (`claude-opus-5-5`), Anthropic, used through Claude
Code with tool use (code search, shell, test runs).

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [ ] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

🤖 Generated with [Claude Code](https://claude.com/claude-code)

---------

Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-15 12:54:23 -06:00
commitperclip[bot] fd0d61b8e3 fix: Compare native finaliser lease expiry at millisecond precision when releasing an expired owner (#17214)
> [!NOTE]
> Opened by Prospector's automated issue-fix pipeline. A maintainer
reviews and decides; nothing here merges on its own.

## Thinking Path

- Issue #16715 reports a defect in paperclipai/paperclip.
- Root cause, as the fixing agent read it: Lease renewal writes
'lease_expires_at' from the database clock ('now() + interval'), so the
stored value has microseconds. 'agentExecutionsHaveStopped' reads that
value into a millisecond JS 'Date' and then releases the row with an
exact 'eq' on it. The update never matches, so the stop check returns
false on every tick and the agent stays in 'pausing'.
- This pull request: Compare native finaliser lease expiry at
millisecond precision when releasing an expired owner

## What Changed

- `server/src/services/agent-execution-stop.ts`: The release update now
truncates the stored lease expiry to milliseconds before comparing it
with the value it read, using the same 'date_trunc('milliseconds', ...)
= ...::timestamptz' pattern as 'chat-channels/activity.ts'. The other
guards stay the same: owner, generation, phase and the null result. This
was the only exact-match comparison on a lease expiry in 'server/src'.

## Verification

- Reproducing test(s), added in this PR:
`server/src/modules/agent-lifecycle/__tests__/lifecycle.test.ts`
- They fail on the base commit and pass with the fix, each twice in a
fresh sandbox.
- 3 independent attempts wrote 3 reproductions; this fix passes every
one of them.
- The repository's compile command passes with the fix applied.
- The full test suite passes except for the 10 file(s) that already fail
on the base commit.

## Risks

- Written by an automated pipeline, not a person: review it as you would
an outside contribution.
- Risk tier of the touched paths: 2.
- The scope reviewer found it also changes, beyond the report:
agentExecutionsHaveStopped for an expired finaliser row whose
lease_expires_at is already millisecond-precise (written from a JS Date)
- The scope reviewer found it also changes, beyond the report: Finaliser
row whose lease was renewed or taken over between the select and the
update
- The scope reviewer found it also changes, beyond the report: Rows with
null leaseExpiresAt

## Model Used

- codex:gpt-6.1-sol, opus, sonnet (Anthropic Claude, via Claude Code;
OpenAI, via the Codex CLI), writing and checking the change in an
isolated sandbox.
- opus (Anthropic Claude, via Claude Code), reviewing it independently.

## Linked Issues

Fixes #16715

Other pull requests that name #16715:
- #17204 (open): fix(heartbeat): stop loading full run rows and stale
pids when pausing an agent
- #16745 (open): fix(agent-lifecycle): release an expired native
finalizer lease at millisecond precision

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [ ] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with 'Fixes: #' / 'Closes
#' / 'Refs #' OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub '#NNN' / 'github.com/paperclipai/paperclip'
URLs)
- [ ] My branch name describes the change (e.g. 'docs/...', 'fix/...')
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [ ] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [ ] I will address all Greptile and reviewer comments before
requesting merge

<!-- prospector:issue-fix v1 issue=16715 base=c7ea5c0216b8
report=1a4e13ecd7c6cdb6 -->

Co-authored-by: commitperclip[bot] <284812584+commitperclip[bot]@users.noreply.github.com>
2026-11-02 15:01:52 -08:00
Nicky LeachandPaperclip 2dd9811e8b Own agent hiring and termination in a lifecycle module (#15631)
## Thinking Path

> - Paperclip manages AI agents and their work.
> - Agent creation, approval, pause, and termination change whether an
agent can work.
> - These changes currently use separate service and database paths.
> - Some agents need setup after their record exists and before their
harness can run.
> - This PR adds one module that owns those state changes and their
transactions.
> - The module records progress and retries incomplete work after a
server restart.

## Linked Issues or Issue Description

**Problem or motivation**

A hire can become active before its execution environment is ready.
Direct agent state writes also bypass one common lifecycle boundary.
Termination does not have a durable step for resource cleanup.

**Proposed solution**

Use agent lifecycle commands for hiring, approval, pause, resume, and
termination. Keep proposed hires pending until approval. Prepare each
approved hire, test its saved harness configuration, and then permit
work. Wait for required plugin work before completing a step.

**Alternatives considered**

A general database commit hook would expose transaction details to
callers. A timer alone would delay each new hire. This module owns each
command transaction and starts its worker after commit. A periodic scan
recovers work after a process stops.

**Roadmap alignment**

This change adds the lifecycle boundary for the existing agent and
plugin systems. It does not add a user interface or a provider
implementation. It replaces the lifecycle delivery approach in #15391.
Related proposals include #11475 and #13099; this change does not add
their external executor protocols.

## What Changed

- Add durable approval, preparation, verification, pause, resume, stop,
and cleanup states.
- Keep agent creation, lifecycle state, configuration writes, and agent
record deletion behind `modules/agent-lifecycle`. Keep validation,
credential rules, reads, onboarding, invitations, general approvals, and
company data deletion in their services.
- Commit a hire before the remaining onboarding or invitation work.
Serialize requests with the existing dedicated database connection
helper. Reuse the hire after a failed attempt.
- Keep accepted work in the run queue during setup. Require execution
and cleanup evidence before completing pause or termination.
- Retain the original credential owner when approving migrated hires.
- Start lifecycle work after each command commits. Use database leases
and revision checks for retries and late results.
- Add a generic required plugin method and capability. Store the
required plugin IDs for each agent. Track host and plugin completion
separately.
- Keep harness verification and credential rules in services. Supply
their results to lifecycle through explicit ports. Reject failed logins
and incomplete probes.
- Remove reverse imports from lifecycle adapters into services. Share
record queries and validation below both layers.
- Use one hire decision path for agent IDs and approval IDs. Resolve the
approval and agent change in one transaction. Expose policy
reconciliation on the command object.
- Save configuration and verification invalidation through one module
operation. Ordinary commands own their transaction. Restrict the shared
transaction integration to its listed callers. Reject identity, company,
accounting, timestamp, and unknown fields.
- Require completed termination before deleting agent records. The
company deletion service calls the module through a separate deletion
interface.
- Save an approved secret before applying its agent binding. A failed
binding leaves the secret approved. A retry reuses it.
- Remove old permission and metadata export files. Move hire
configuration rules out of lifecycle persistence.
- Report failed worker steps and scans with operation context and known
error codes. Omit provider messages, stacks, and configuration values.
Document ordinary application use and extension rules.
- Recover expired native owners only after execution stops. Retry
cleanup of failed retained leases. Wait for setup in the live smoke
script.
- Keep manual, budget, and company pause reasons separate. Guard
execution status writes with the ready state.
- Add a migration, boundary checks, regression tests, and a lifecycle
guide. Keep the current UI.
- Limit periodic policy checks to 100 eligible agents per minute.
Continue from the last agent ID. Exclude pending hires and agents in
termination or a final state. Keep explicit company and budget updates
immediate.

## Verification

- Latest head `ccc3c86b0` aligns the shared status update schema with
the PATCH route. All 15 shared tests, 104 server route/OpenAPI tests, 2
CLI tests, and shared/server/CLI TypeScript checks pass. The Greptile
comment is fixed. CI is running; no new Apex review was requested for
this small fix.

- Rebase `75708ac94` rebases onto master at `2eb5187e4`. The backup test
uses the shared 90-second timeout from master; the older timeout commit
was removed. The affected backup test passes.
- Agent budget edits now pass the target agent ID through enforcement.
All 50 affected tests, server TypeScript, and 11 boundary tests pass.
Both configuration update paths have regression coverage. CI is running
on the latest head. No new Apex review was requested for these small
fixes.

- Rebase `9b568666a` preserves the run-control extraction and
delivery-work startup changes from master. All 559 affected tests,
server TypeScript, and 11 boundary tests pass. CI and Apex review are
running on the final head.
- The policy scan fix passes 56 lifecycle and diagnostic tests, 24
policy and caller tests, and 11 boundary tests. A regression test checks
the page limit, interval, excluded states, and cursor wraparound.

- Rebase `fd4698750` passes all 611 tests in eight affected lifecycle,
route, and heartbeat suites. Server TypeScript and all 11 module
boundary tests pass. The company deletion rollback and concurrent hire
tests are included.

- Follow-up `00aac7646` fixes the failed decision deletion test and the
public update schema. All 126 affected server tests, 8 shared tests, 2
CLI tests, and 11 boundary tests pass. Shared, server, CLI, and UI
TypeScript checks pass.

- Server TypeScript passes: `pnpm --filter @paperclipai/server exec tsc
--noEmit`.
- All 11 boundary tests pass: `node --test
scripts/check-module-boundaries.test.mjs`. The repository boundary scan
also passes.
- All 68 lifecycle, failure diagnostic, and harness verification tests
pass. Tests reject forbidden fields through the root command, combined
transition command, and restricted transaction integration. They also
check invalid fields returned by configuration preparation.
- Failure tests cover host work, plugin work, claims, renewals,
deferrals, and scans. Log tests check known error codes and exclusion of
private error contents.
- All 355 tests in 10 existing caller suites pass. These tests cover
secret approval, pairing, pending hires, credentials, company import,
built-in agents, managed agents, instructions, and skills.
- The branch is rebased onto `origin/master` at `2eb5187e4`. The queue
guards and cancellation lock fix use the extracted heartbeat queue.
Agent cancellation uses the extracted run-control file. The source diff
scan found no secrets or private URLs.
- Earlier checks cover approval retries, rollback, late verification
results, policy holds, deletion rollback, concurrent company deletion,
and queue admission during setup.
- Before the rebase, CI passed on `00aac7646` and Greptile Apex rated it
5/5 with no open comments. CI and a new Apex review are pending for the
rebased commit. The branch has no merge conflicts.
- The full local build and native Dot suite were not run. The host has
no Cargo. No live provider test was run.

## Risks

- Background policy recovery takes more than one minute when more than
100 agents are eligible. Explicit company and budget updates still
reconcile immediately.

- The restricted configuration integration keeps an agent reference and
its dependent records in one transaction. It cannot change a budget or
invoke a lifecycle transition. A periodic scan starts pending setup
after that transaction commits.
- Secret approval and binding use separate transactions. A failed
binding can leave an approved secret with no agent binding.
- New approved hires remain unavailable until setup and verification
complete. Existing clients see `paused` during these steps. This PR does
not change the UI.
- Migration `0320_daily_onslaught.sql` maps existing statuses and pause
reasons. It does not create external resources or claim that an existing
harness passed verification.
- Use a coordinated server update for this migration. Older server
versions can write legacy status without the new lifecycle checks.
- A failed onboarding or invitation request can leave a committed hire.
A retry reuses that hire and completes the remaining records.
- Deletion requires completed termination. Company deletion can require
another request while cleanup is pending.
- Required plugins must make repeated calls safe and reject older
revisions. A disabled or removed required plugin blocks completion until
it is restored.
- A new hire can run a second harness test after the existing UI test.
Some adapters can charge for this test.
- No live provider test was run. Provider implementation and resource
backfill remain separate work.

## Model Used

OpenAI GPT-6 through Codex, with reasoning, code tools, and local test
execution.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have described the issue in this PR with the feature request
field labels
- [x] I have not referenced internal or instance-local issues or links
- [x] My branch name describes the change
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation
- [x] I have considered and documented risks
- [x] Targeted local tests pass
- [x] All Paperclip CI gates are green on the new commit
- [x] Greptile Apex is 5/5 with no open comments on the new commit
- [x] I will address review comments before requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-10-09 09:05:12 -07:00