mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-11-26 18:35:33 +01:00
aa85bcb5185fca52ce82a0edeff10d8a97e7eb95
6
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
d4b7ae5532 |
fix(tasks): require merged PR deliverables before native completion (#22244)
Keep native tasks with declared pull request deliverables active until
GitHub verifies every deliverable is merged. Preserve delivery guidance
in follow-up contracts and recheck the current outputs under task locks.
Use bounded incomplete-work feedback during reassessment, including for
saved non-Done reports. Serialize work-product restoration and identity
changes with completion. Preserve configured reviews and conversations.
Add regression coverage and repair the CI fixtures exposed during
qualification. All CI checks pass on
|
||
|
|
aaf76a3ca6 |
fix(native): start the configured review stage when a native worker reports done (#20882)
## Thinking Path
> - Paperclip is the open source app people use to manage AI agents for
work
> - Tasks can have an execution policy with a review stage that names an
independent human reviewer
> - The issue route starts that stage when the assignee moves the task
to done or in_review
> - Native runs do not use that route. The native finalizer writes the
task status through the issue service, which does not run the stage
transition
> - So a native worker that reports verified work as done closes the
task without the required review. A worker that reports needs_review
moves the task to in_review without the configured stage or its reviewer
> - This pull request makes the native completion path start the
configured review stage, as the route does
> - The benefit is that a configured independent review gates Done for
native workers too
## Linked Issues or Issue Description
**What happened**
A task had an execution policy with one review stage for a human
reviewer. A native worker (OpenCode on the Paperclip runner) finished
the work and reported it. When the worker reported done with verified
evidence, the task became done and the review stage never started. When
the worker reported needs_review, the task became in_review with a
generic review card, `executionState` stayed null, and the configured
reviewer was not assigned. The chat eval `tasks.completion-with-gate`
timed out in setup because the task never reached the pending review
stage.
**Expected behavior**
Verified work on a task with a configured human review stage goes to
in_review with that stage pending, the stage reviewer assigned and the
worker kept as the return assignee. The task becomes done only after the
reviewer approves.
**Steps to reproduce**
1. Create a task assigned to a native agent with `executionPolicy.stages
= [{ type: "review", participants: [{ type: "user", userId: <reviewer>
}] }]`.
2. Let the agent finish the work and report done with verified evidence.
3. Read the task. Before this fix it is `done` and `executionState` is
null.
## What Changed
- `server/src/services/issue-execution-policy.ts`: add
`completionReviewStageEntry`. It applies the full policy transition that
the route applies for `status: "done"` and returns `starts` (with the
stage patch), `none` or `rejected`.
- `native-run-finalizer.ts`: a done decision on a task whose policy
starts a stage becomes in_review with reason
`execution_stage_review_required`. When the policy refuses the
transition, the decision is in_progress with reason
`execution_stage_transition_rejected` and a recovery note. It is never
done. Deliverable checks still run first.
- `status-decision-committer.ts`: for a stage-entry decision, apply the
stale-owner check, start the stage from the locked task in the same
status update (this also clears a monitor that the new assignee cannot
use), and wake an agent participant with `execution_review_requested` or
`execution_approval_requested`, as the route does. If the policy
changed, the saved decision is stale and finalization retries.
- `native-completion-feedback.ts`: on such a task, tell the worker to
report done so the configured stage requests the review. Reject
needs_review with no request or with any review request. Approval
requests keep their own path, because they can be governed action cards.
- New regression test `native-execution-policy-review-stage.test.ts`
(embedded Postgres, 6 tests).
## Verification
- `cd server && npx vitest run
src/services/native-runtime/native-execution-policy-review-stage.test.ts`
(6 tests): no stage (done), human stage (in_review, reviewer assigned,
monitor cleared), agent stage (in_review, reviewer woken), refused live
review cycle (in_progress, not done), and feedback including mixed and
approval requests. The stage tests fail without the finalizer change
(the task becomes done).
- Related suites pass: `historical-task-questions`,
`native-completion-feedback`, `native-run-finalizer-telemetry`,
`native-terminal-status-projection`, `status-arbiter`,
`task-monitor.integration`, `__tests__/issue-execution-policy` (247
tests).
- Server `tsc --noEmit` shows no errors in changed files. The local
worktree has unbuilt packages, so CI supplies the full typecheck.
## Risks
- The agent-reviewer wake is a system workflow wake, like the route's.
Unit tests prove the wake row. An end-to-end native agent review after
this wake is not yet exercised in a paid eval.
- A decision saved with a new reason and resumed by an older release
projects in_review or in_progress without the stage. The task does not
close, so the older release fails safe.
- Agents on tasks with a configured review stage now get a rejection
when they report needs_review with no request or with a review request.
## Model Used
- Anthropic Claude Opus 5.5 (`claude-opus-5-5`), tool use and code
execution in Claude Code.
## Checklist
- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge
🤖 Generated with [Claude Code](https://claude.com/claude-code)
---------
Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>
|
||
|
|
98e0f1fc0d |
fix(native-runtime): a stopped run cannot close a task another run continues; deliver a pre-restart comment at once (#20216)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work > - When the board stops a run and then posts a comment asking the agent to continue, that comment starts a new run, and only that new run should decide when the task is done > - In restart chaos wave `w-20261109T081456-s9901`, t16 (claude S1, K1) closed the task as done without the line the user asked for, and t10 (codex S1, K6) never woke a run for the continue comment, so it needed a Retry > - In t16, the stopped run's saved "done" result was accepted 10 s after the continue run started. In t10, a restart killed the server 21 ms after the comment committed, before its wake was written, and the comment backstop then waited out its 30 s grace > - This pull request stops a run from closing a task that another run now holds, and makes the backstop deliver at once a comment that predates the server process > - The benefit is that a user's latest direction after a Stop is neither overridden by the stopped run nor lost to a restart ## Linked Issues or Issue Description Refs #19831. Restart chaos wave `w-20261109T081456-s9901` (master `09e24dd12c`), tasks t16 and t10. **t16, from the kept database (CHA-20):** - 08:29:19: the board stopped run 1 (`6e33d123`). Its saved result reported done, but finalization failed on the stop (`finalization_failed_claim_preserved`, a retryable failure). - 08:29:41: the user's continue comment started run 2 (`2cb71c5b`). Run 2 held the task's execution and saw the comment. - 08:29:51: the finalization reconciler retried run 1's saved result and committed `completion_claim_policy_accepted` for run 1. The task closed as done. - From then on, every Paperclip tool call from run 2 was refused (`paperclip_runner_tool_binding_not_authorized`), so it could not add the `CONTINUE-…` line. Its result (blocked) was then preserved as `terminal_status_preserved`. - Run 2 ending `succeeded` with `native_session_lease_lost` follows from this: its result was accepted before the lease was lost. The comment was delivered; the model saw it. **t10 (CHA-14):** - The Stop moved the task to blocked. The user's comment reopened it to todo at 08:26:28.633, and K6 killed the server at 08:26:28.654, before the route wrote the comment's wake. No wake request exists for that comment. - This is not caused by the Stop, #20066 or #20180: the wake is written after the comment commits, and the kill landed in between. - The I4 backstop ("a user comment without a wake") matched the comment, but treated it as possibly still getting its normal wake for 30 s. The pass interval then pushed the check to 02:27:16, and the harness clicked Retry at 02:26:59. ## What Changed - `status-arbiter.ts`: - New `heldByAnotherRun(issue, runId)`. - `supersedeStaleOwnerCompletion` also keeps status, with reason `completion_run_superseded`, when the issue's `executionRunId` is a different run. A run that was reassigned away still gets `completion_owner_superseded`. - `native-run-finalizer.ts` and `native-status-reassessment.ts` pass the run id to that guard. - `status-decision-committer.ts` rechecks the same rule under the issue lock: a done decision for a non-conversation issue held by another run raises `NativeStatusRaceError`. The finalizer then re-arbitrates and keeps status. - `ownership-invariant-report.ts`: the comment-without-wake grace now only applies to comments created after this server process started (`getServerProcessStartedAt`). Separate live server replicas are not supported, and the wake is written by the process that accepted the comment, so an older comment is owed at once. The startup pass now delivers it. `runOwnershipReconciliationPass` takes an optional `processStartedAt`. ## Verification Red/green: - `native-stale-owner-completion.test.ts`: three new tests. - The unit policy: another run holding the task keeps status; the same run, or none, still closes it. - "does not let a stopped run's saved done result close the task a newer run is continuing" (the t16 shape). - "does not close the task when a newer run takes it after arbitration but before the status commit" (only the committer recheck covers this). - On master: 3 failed. With this PR: 13 passed. - `ownership-reconciliation-report.test.ts`: "finds at once a young user comment whose wake a restart lost after the board stopped the run" (the t10 shape). It fails on master and passes with this PR; the same comment in a process that accepted it still waits for its grace deadline. The file: 27 passed. Regression and static checks: - 16 nearby native finalization, status projection, workspace finalizer and arbiter suites: 439 passed. - `tsc --noEmit` passes for `server`, and for the two test files. ## Risks - A done result now waits when a different run holds the task. That run reaches its own decision; the earlier result stays as history. If the holder is stale, the existing execution-lock recovery clears it, and a later reassessment can then close the task. - After a restart, a user comment newer than the task's last run, with no wake, is delivered at the startup pass rather than 30 s later. A replica that is still live and writing the same wake is not a supported topology. - No schema change and no change to persisted run state. ## Model Used - Claude Opus 5.5 (`claude-opus-5-5`), Anthropic, via Claude Code with tool use (shell, file edits). ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> |
||
|
|
3b17b5ce15 |
fix(native): keep a reassigned-away run from closing the new owner's task (#19186)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work > - A native agent run reports "done" in an accepted result. A finalizer then decides the task status. > - The board can reassign a task while the run is in flight. The old run is cancelled, but its accepted result still goes to the finalizer. > - The finalizer did not check who owns the task now. The old owner's "done" closed the task of the new owner. > - The new owner never did the work, and the task shows done with no reply from the current owner. > - This pull request makes a done report apply only when the reporting run's agent still owns the task. > - The benefit is that reassignment keeps its meaning: the new owner keeps the open task, and the old result stays as history. ## Linked Issues or Issue Description **What happened?** On a hosted staging instance, agent A started a native run on a task. Agent A finished the work and submitted a "done" result. Then the board reassigned the task to agent B, and Paperclip cancelled agent A's run with `issue_reassigned`. About 45 seconds later, the native finalizer committed agent A's done decision with reason `completion_claim_policy_accepted`. The task became done. Agent B's runs were then cancelled because the task was terminal. Agent B never worked on the task. **Expected behavior** A done report from a run that no longer owns the task must not close the task. The accepted result stays as history. The task status stays as it is for the current owner. **Steps to reproduce** 1. Assign a low-risk native task to agent A and start a run. 2. Submit a done result for the run. 3. Reassign the task to agent B before finalization. 4. Finalize the run. Before this change, the task becomes done. **Paperclip version or commit** Observed on staging at `b9fbbf8d30`. Reproduced on `master` at `06826915d7`. Related: #19130 adds a publication check for requested documents at finalization. It does not check task ownership. ## What Changed - `status-arbiter.ts`: add `ownsNativeTaskCompletion` and `supersedeStaleOwnerCompletion`. A done decision from an agent that is not the current assignee (another agent, a user, or nobody) becomes `preserve` with reason `completion_owner_superseded` and no effects. Other decisions do not change. This is the same ownership rule that the provider-failure path already uses (`ownsProviderFailureDecision`). - `native-run-finalizer.ts`: apply the rule after arbitration and before the deliverable check. Conversation tasks keep their existing path. - `native-status-reassessment.ts`: apply the same rule, so new evidence from a reassigned-away run cannot close the task later. - The status committer does not change. A reassignment during finalization already increments `statusVersion` (migration 0358). The committer then replans, and the retry applies the new rule. - `doc/execution-semantics.md`: describe the rule next to the existing "a late finalizer cannot change a reassigned task" statement. ## Verification New file `server/src/services/native-runtime/native-stale-owner-completion.test.ts`. It uses embedded PostgreSQL, the real coordinator store and the real finalizer. - Control: the owning run's done result closes the task with `completion_claim_policy_accepted`. - Reassigned before finalization: the task stays `in_progress` with agent B. The decision is `completion_owner_superseded`. The accepted result row is unchanged. - Reassigned after arbitration and before the status commit: the commit replans and the task stays `in_progress`. - Reassessment control: later approved evidence closes the owner's task with `decision_superseded_by_new_evidence`. - Reassessment after reassignment: later approved evidence from the old run does not close the task. The decision is `completion_owner_superseded`. This case fails when the reassessment rule is disabled. - Pure policy cases: another agent, a board user and no assignee all preserve status. A non-done decision passes through. Red before the fix (same tests, fix not applied): ```sh cd server && npx vitest run src/services/native-runtime/native-stale-owner-completion.test.ts # Tests 2 failed | 1 passed — both reassignment cases: expected "in_progress", received "done" ``` Green after the fix: ```sh cd server && npx vitest run src/services/native-runtime/native-stale-owner-completion.test.ts # Tests 10 passed cd server && npx vitest run src/services/native-runtime/paperclip-control-plane-port.test.ts \ src/services/native-runtime/native-completion-feedback.test.ts src/services/native-runtime/native-deliverable-feedback.test.ts \ src/services/native-runtime/native-skill-test-status.test.ts src/services/native-runtime/native-routine-status.test.ts \ src/__tests__/native-status-arbiter-corpus.test.ts src/__tests__/native-status-reassessment-work.test.ts \ src/services/native-runtime/agent-chat-response-recovery.test.ts src/__tests__/native-run-projection-work.test.ts \ src/services/native-runtime/task-reassignment.test.ts src/services/native-runtime/native-provider-failure.integration.test.ts # 11 files, 614 tests passed ``` I did not run the full `pnpm test:run`, `pnpm -r typecheck` or `pnpm build` locally. CI runs them. ## Risks - A native run that reassigns its own task to a user or to another agent, and then reports done, no longer closes the task through arbitration. The status that the agent set through the API stays. This matches the existing provider-failure ownership rule. - A native run on a task with no assignee cannot close it through arbitration. Native task runs start from an assignment, so this is not expected in normal use. - Review runs and conversation tasks keep their existing paths. Review outcomes already preserve status before this rule. - No schema change and no migration. > For core feature work, check [`ROADMAP.md`](ROADMAP.md) first and discuss it in `#dev` before opening the PR. Feature PRs that overlap with planned core work may need to be redirected — check the roadmap first. See `CONTRIBUTING.md`. ## Model Used - Provider: Anthropic. Model: Claude Opus 5.5 (`claude-opus-5-5`), in the Claude Code agent harness. - Capabilities used: tool use, shell and code execution, repository search, browser reads of staging, and extended reasoning. - The model wrote the change, the tests and this description. A human requested the fix. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge 🤖 Generated with [Claude Code](https://claude.com/claude-code) --------- Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> |
||
|
|
c2cc69d1e4 |
fix(recovery): resume and settle preserved native results (#19034)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Native execution can save an accepted result before workspace export fails. > - Recover must preserve the files and settle that same result without another agent turn. > - The export failure can own the task's Blocked transition and its recovery notice. > - Recovery must prove preservation, stop, source identity and current authority before settlement. > - Recover can also transfer repair ownership to the system, which must keep explicit board export repair available. > - This change restores those paths while preserving later task state, live owners and unknown action outcomes. ## Linked Issues or Issue Description Related #17916 protects unfinished exports. Related #19004 preserves deliberate Retry authority. This change repairs accepted-result finalization and its recovery notice. **What happened?** A native run accepted its result, then exhausted workspace export. Normal Recover could save the files but leave the result and old recovery notice unsettled. A saved Retry could also use a different generation from preservation. Separately, Recover changed the action owner from board to system. Explicit export Retry then rejected that same source as stale, even when its accepted result and stopped allocation still matched. **Expected behavior** Preserve files, finish the original accepted result and close only its obsolete notice after exact proof. Keep explicit board export repair available after system adoption. Preserve current authority, Stop, later task changes, newer execution and every physical ownership fence. **Steps to reproduce** 1. Accept a native result and exhaust its workspace export. 2. Request ordinary Recover, optionally with an existing saved Retry. 3. Let file preservation complete. Inspect the task and source recovery notice. 4. To reproduce the explicit-repair defect, call export Retry after Recover adopts the action. Before this repair it rejects the valid system-owned source before any provider call. ## What Changed - Record the exact accepted result, contract, task status version and prior decision when export exhaustion creates Blocked. - Bind passive finalization to complete, source-bound preservation and the current chat/review authority. Recheck the proof under status commit locks. - Keep the saved Retry identity separate from its preservation generation. Retain coalescing and reject malformed or mismatched history. - Preserve an existing published GitHub assessment for the no-publication status-unproven wait. Keep all semantic, result, authority and publication checks. - Close an old export notice only after its own accepted result, export or preservation receipts, effects, projection and old Runner ownership settle. Keep newer work and files unchanged. - Permit explicit board export Retry after Recover transfers the exact source to the system. Require valid system and workspace recovery records for that same run, plus every existing result, stop, allocation, task and shared physical-lock check. Reject missing proof, another source and agent ownership before provider access. - Merge current master while retaining the stronger Stop, source and verified preservation checks. - Update the execution contract. No schema, endpoint, Runner protocol, model, trust or provider artifact change. ## Verification - Current head: `9be5a73489801095c9f39c9bfcb285a22b055912`. - The explicit-repair regression fails before the new guard change: ordinary Recover adopts the real database action, then export Retry rejects it as stale. It passes after the repair. - On the merged source, three owning PostgreSQL/file suites pass **220 tests**: `preserved-native-response-wait.integration.test.ts`, `native-workspace-export-retry.test.ts` and `idle-completed-history.test.ts`. The export suite includes four unrelated-owner/source rejection controls and both board-owned and system-adopted active-exporter controls. Results and run counts prove that repair creates no provider turn. - Server layered typecheck, module boundaries, `git diff --check`, and the added-line secret/private-incident scan pass. - Full workspace typecheck (`pnpm -r typecheck`) and build (`pnpm build`) pass. The complete local `pnpm test:run` is still running; its completed serialized chat partitions pass. Current-head CI is green (53 successful checks, 3 expected skips). Greptile reviewed `9be5a73489801095c9f39c9bfcb285a22b055912` at 2026-11-05 00:58 UTC with confidence **5/5**; all review threads are resolved. - Original qualification remains supporting evidence: the accepted-result fixture exercises HTTP Recover, real files, the finalizer, saved Retry coalescing, eight commit races, current principal/resource/head changes, Stop, later task changes, notice closure and repeated delivery. No accepted response, provider turn or publication is replayed. - Earlier failures remain recorded. Original red controls exposed wrong-action preservation, unrelated finalization barriers, generation mismatch and a lost GitHub assessment; the original repair added controls for them. The prior CI run [41908572248](https://github.com/paperclipai/paperclip/actions/runs/41908572248) failed an unchanged completed-history runtime fixture because its loopback service refused connections through the original ten-second readiness window. That owning suite passes unchanged in the 220-case run above. The earlier readiness failure's cause remains unproven; no wait or assertion was weakened. - Local and CI tests do not establish hosted task recovery. The serving revision and original-task outcomes require separate verification after rollout. ## Risks - Historical failures without the exact export-owned Blocked receipt keep their current task status. A saved result does not grant execution or publication authority. - Explicit export repair still resumes only the same retained allocation under the shared physical lock. It cannot take over an active exporter, create another agent turn, choose a replacement sandbox or discard saved files. - Retiring a source notice does not release physical resources or modify a newer task owner, later Done state or saved snapshot history. - The proof adds bounded reads only for concrete recovery obligations. It adds no recurring worker or polling timer. ## Model Used OpenAI GPT-6 through Codex for the original repair. OpenAI GPT-6.1 Sol (`gpt-6.1-sol`), xhigh reasoning, for the merge, integration verification and system-adopted export repair. Both used repository tools, code execution and PostgreSQL tests. The runtime does not expose a context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used - [x] I have checked ROADMAP.md and searched for duplicate or related work - [x] I have described the issue and linked related public PRs - [x] I have included no internal task identifiers or private incident links - [x] I have added behavioral and safety regression tests - [x] I have documented verification limits and risks - [x] I have updated the execution contract - [x] All Paperclip CI gates are green on the current head - [x] Greptile is 5/5 on the current head with no unresolved comments - [x] I will address review comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> Co-authored-by: Devin Foley <devin@paperclip.ing> |
||
|
|
df6156c2e3 |
fix(server): wake native status reassessment from committed changes (#17709)
## Thinking Path > - Paperclip manages agents, tasks and their durable native results. > - Changed evidence, task authority or review retirement can require a new status assessment. > - Periodic orphan recovery repeatedly reads history to find these changes. > - This change gives reassessment an owner driven by committed changes and saved deadlines. > - Existing result, assessment, decision and task rows remain durable truth. > - The status committer still verifies current sources and authority before writing. > - Settled or insufficient evidence becomes quiet until a supported producer changes it. ## Linked Issues or Issue Description Refs #17702 (merged), #17679 and #17680. This is slice 50, now based on master. It owns native status reassessment; workspace settlement, retained sessions and other orphan duties remain separate. **What happened?** Periodic recovery repeatedly inspects completed native results. Removing that scan without complete writer coverage or current authority checks could strand new evidence or commit an old result over newer work. **Expected behavior** Reassess from existing durable facts after relevant outer transactions commit. Retain real retry/lease deadlines and restart/drain recovery. Preserve current authority, quality-review and supersession checks. Make no recurring SQL when work is settled or dormant. **Steps to reproduce** Complete a native result awaiting evidence or review, leave it idle, then approve a real work product or retire the selected automatic review. Its saved result should advance once when authorized, or record the existing nonterminal business gate, without a periodic scan. ## What Changed - Extract reassessment and its pure status policy from finalization recovery into their owning modules. Add a scoped worker using the existing delivery coordinator and scheduler; no queue table or migration is added. - Retain the three durable discovery triggers: changed work-product history, authoritative task status/version, or retirement of the selected automatic completion review. Preserve selected-source, ownership, effects, retry and lease fences under the existing committer. - Notify from actual task/work-product, claim release, approval, interaction, OAuth, event evidence and workspace-settlement owners before their transaction writes. Keep provider calls outside short transactions and nested writes behind outer commit. - Scope ordinary milestone/finalization/coalesced-input wakes to an issue/run. Keep genuine company authority restoration explicit. Real Photon and coalescer regressions cover all three response/status queues. - Move the current parent's required quality policy into the owner and apply it to every reassessment that could complete a task. An unmet review records the existing in-progress decision and next action, avoiding an operational retry loop. Preserve conversation/session reset locks and the workspace omission-barrier signal. - Skip reassessment in periodic recovery while preserving explicit/startup recovery and the historical supersession guard before independent workspace work. Document the source contract, producer inventory, failures and qualifications in the linked audit. ## Verification - Broad source `9fddb3f0b1157df32b64fb1f22e9d6e9624470e8` passes **2731 distinct cases in 28 complete files**, with no skips: 2458 producer/owner/authority/workspace/quality cases in 394.43 seconds and all 273 governed-response cases in 53.74 seconds. Nineteen dedicated fresh PostgreSQL 17 databases migrate through 0413; eighteen embedded-only invocations preserve fresh-per-call isolation through the existing recovery helper. All 22 temporary imports restore exactly and all 28 hashes match. - Final runtime source `5ea3b0fd016bf7e63ba82a7044825a46a0cd2082` passes **1211 cases in five complete affected files** in 108.23 seconds after the narrowly reproduced evidence-trigger fix: all 43 worker, 145 corpus, 32 finalization-recovery, 968 native-session and 23 quality-review cases. Four fresh databases plus the quality helper's own fresh fixture use PostgreSQL 17. Its one adapted import restores exactly; all five hashes match. The other 27 broad-run test files are unchanged. These qualifications are source-scoped and not cumulatively double-counted. - Required/optional real regressions reproduce retry loops on retired-review and evidence-approval paths before repair; both become SQL quiet afterward with unchanged assertions/time limits. Controlled removal of only ordinary scope guards reproduces two coarse-hint SQL failures; exact guard restoration passes. Real producer, outer transaction, claim, authority, 103-item backlog, retry and drain cases pass. Photon transport is mocked; callbacks, locks and observed SQL are real. - Normal merges preserve 12661 parent/unrelated entries, 35 owned entries and 21 automatic shared results, with five original conflicts reviewed explicitly. The parent's actual squash reconciliation preserves the entire held child tree. The final quality fix changes only its owner and tests. Fourteen added comments are removed with identical nontrivia tokens; no directives are removed and the final comment check is empty. - Database build, server types/build, boundaries and exact-head migration order pass. The database tree is identical to merged #17702: no new SQL, queue table or snapshot is generated. Earlier benchmarks, host limitations, failed assertions and their repairs remain in `doc/plans/2026-10-26-native-status-reassessment-sleep-audit.md` and `doc/idle-native-status-reassessment.md`. - This qualifies targeted external PostgreSQL behavior, not embedded bootstrap on the semaphore-exhausted host, a full local repository suite, deployed sleep or measured fleet savings. Fresh exact-head CI and review remain required. ## Risks - Notifications retain the process-local supported-writer contract. Independent SQL writers and uncoordinated replicas are not covered by a new transport. - Reassessment competes with current authority changes. Existing row/source locks and retries remain required; arbitrary missing identities have no row to lock, so this is not a general predicate-lock guarantee. - Discovery pages 100 rows but retains outstanding candidates in memory. It remains proportional to backlog size, and cancellation occurs between queries. - Other orphan/workspace/session duties and Cloud sleep eligibility remain unchanged. Missing supported producer coverage could strand dormant work, so the producer audit and real callback/transaction tests remain part of acceptance. ## Model Used OpenAI Codex, GPT-6 family, with reasoning, repository tools, shell execution and PostgreSQL tests. The runtime does not expose a more specific serving snapshot or context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass (targeted scope is stated above) - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> Co-authored-by: Codex <noreply@openai.com> |