Commit Graph
4 Commits
Author SHA1 Message Date
DottaandPaperclip bee0f0e2fa fix(server): recognize recoverable result finalization during upgrades (#19651)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work.
> - Native execution saves an accepted result before it finishes
workspace export and status projection.
> - The upgrade report currently recognizes only a live execution in the
observed phase.
> - A durable accepted result can therefore block an upgrade after its
execution lease is released.
> - Existing finalization owners already resume that saved work with
task binding, physical worker stop proof, and an atomic owner claim.
> - This pull request lets the report inspect those existing contracts
without taking authority.
> - Qualified remote work can continue through a normal server
replacement.

## Linked Issues or Issue Description

Refs #18037 and #19596.

**What happened?**

An accepted remote native result remains in result acceptance, workspace
finalization, retry, or committed projection. The upgrade report marks
it blocking because it is no longer a result-less observed execution
with a live execution lease.

**Expected behavior**

Report a saved result as recoverable only when the existing replacement
owners can resume it. Preserve all task, result, contract, remote
workspace, provider lease, physical owner, decision, and workspace
barrier checks. Keep unsupported or unknown work blocking.

**Steps to reproduce**

Run the new PostgreSQL post-result readiness fixture. It persists a real
encrypted Runner header and an accepted terminal result with a bound
remote workspace. The unchanged report returns one blocker.

**Paperclip version or commit**

Regression base: ee6c101854. Related shutdown recovery is in #19596.

## What Changed

- Delegate saved-result eligibility to the native finalization owner.
- Require the accepted terminal result and contract, current task
binding, remote authority, retained provider lease or successful
workspace receipt, and a supported physical worker identity.
- Require an applied decision and assessment for committed projection.
Keep finalizer leases beyond the supported outage budget blocking.
- Reuse the existing result recovery binding with selected metadata. Do
not load complete run or result payloads for the new observation.
- Keep real signed stop verification, owner compare-and-swap, retry
deadlines, and actual finalization with their existing owners.
- Share a two-second scheduling budget across saved-result inspections,
leaving unchecked candidates blocking after the budget expires.
- Add PostgreSQL, encrypted-header, signed stop-proof, competing-owner,
projection, and independent-work cases. Clarify the operator contract.

## Verification

- The valid accepted-result fixture reproduced the original blocking
report, then passed with this change.
- The initial eight post-result cases passed against PostgreSQL. They
include a real Ed25519 stop receipt, the existing verifier, a competing
PostgreSQL ownership claim, one copyback, and receipt reuse.
- Seventeen focused existing PostgreSQL shutdown and workspace ownership
cases passed.
- A broader five-file run passed 91 cases. Its one failure was an
invalid negative fixture: PostgreSQL correctly refused a contract change
protected by the accepted-result foreign key. The test now asserts that
refusal.
- A subsequent standalone run timed out in PostgreSQL bootstrap before
tests ran. The final run used the existing shared PostgreSQL command and
isolated per-suite template databases: all 92 tests passed across five
files (159.95 seconds). It covers both readiness suites, platform stop
proof, workspace finalization, and graceful shutdown. That scope passed
on `ce4e3995b6`. A follow-up restricts provider leases to the active
status and adds released/unknown-status controls. The new fixture now
uses the existing PostgreSQL bootstrap timeout constant. The affected
eight-case rerun passed on `850859b44d`. The explicit configured-stack
guard also passed its six platform-proof cases. Broad local source
typecheck still has stale borrowed dependency declarations; fresh CI
supplies that coverage.
- Review's locked-query regression reproduced RED: three saved-result
candidates took 6.081 seconds. With the shared scheduling budget, both
readiness suites passed all 16 cases (49.36 seconds) on final code
committed as `70b0b7b8f7`. The lock case leaves all three candidates
blocking, releases its connection, and observes all three as recoverable
after the lock is released.
- Greptile reviewed final `70b0b7b8f7` at 5/5 with no open threads.
Current-head CI typecheck, build, tests, and native review are pending.
No hosted replacement or enrollment acceptance is claimed.

## Risks

A false positive could select an unsafe upgrade. Missing evidence and
read errors remain blocking. Readiness does not stop admission, detach
an agent, acquire a lease, request a stop receipt, or authorize
takeover. The replacement still verifies physical stop and rechecks
current task ownership before copyback. Saved results retaining a
previous controller boot remain conservatively blocking, including
finalizers resumed by a later boot. This PR does not change enrollment
policy or migrate data.

## Model Used

OpenAI GPT-6.1, model ID `gpt-6.1-sol`, with reasoning, tool use, and
code execution. The host did not expose the context-window size.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change and contains no internal
Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [ ] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-11-06 17:30:28 -06:00
DottaandPaperclip c09fb60ca6 fix(recovery): retain worker-stop audit in preparation retries (#19612)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work.
> - Recovery must preserve saved files before it admits another
execution.
> - A failed preparation can need a verified stop of its previous
workspace worker.
> - Recovery keeps that verified stop receipt in the run profile for
audit.
> - The preparation retry guard treats the retained receipt as unknown
execution evidence.
> - This pull request recognizes a valid same-run audit receipt while it
retains all current execution and file checks.
> - A saved Retry can then continue once after recovery completes.

## Linked Issues or Issue Description

**What happened?**

A native preparation failed before provider dispatch. The recovery
worker verified that the previous workspace worker had stopped and saved
its files. The same HTTP Retry stayed deferred because the run profile
retained `nativeWorkspaceOwnerStopProof`.

**Expected behavior**

The saved Retry should continue once after all preparation, stop, file,
ownership, and authorization checks pass. The old run and its audit
receipt should remain unchanged.

**Steps to reproduce**

1. Fail native preparation with a retained remote workspace and no
provider activity.
2. Let the recovery worker acquire the old workspace owner through
verified platform stop evidence.
3. Submit one HTTP Retry and let preservation complete.
4. Observe that the old guard retains the retry hold even after
saved-file verification passes.

**Paperclip version or commit**

Reproduced against `d728be8fbf`. Related work: #18908, #19021, #19026,
and #19466. This change covers the retained workspace-worker stop audit
left by a later repair.

## What Changed

- Add a typed reader for a host-persisted same-run worker-stop audit
receipt. Keep signature and expiry validation at ownership acquisition.
- Recognize only that validated audit field in failed-preparation
settlement. Keep unknown profiles and active owners blocked.
- Exercise real preservation, HTTP Retry delivery, native dispatch,
saved files, accepted results, and task completion. Add malformed,
foreign-run, unstopped-worker, and active-owner cases.
- Document the distinction between retained audit evidence and current
execution authority.

## Verification

- Failing before the fix: the current-worker preservation case passed;
the stopped-worker case produced zero successor runs after the same
Retry, where one was expected.
- Passing after the fix: 47 recovery cases, 10 native
dispatch/preservation cases, and 6 platform-proof tests. The two
preservation success cases overlap between the first two groups.
- Server typecheck passed all seven layers after the final test changes.
The Runner and SDK dependencies were built in this isolated worktree.
- Final comment-free commit `44f8f33f8d917dddb51852283a479786102eab4d`:
a fresh combined run passed all 61 affected cases in 67.92s. Fresh
server typecheck passed all seven layers.
- The earlier `95d0376c` combined run passed 60 cases and hit one
`socket hang up` in the existing `catalog_provider_warning` HTTP test.
That case passed in a bounded isolated run (12.48s), and the final
61-case combined run passed. The socket failure remains recorded as an
intermittent HTTP harness limitation. No retry or weaker assertion was
added.
- Final commit `44f8f33f8d917dddb51852283a479786102eab4d` completed all
required CI gates: 57 checks succeeded, 3 intentional skips, and the
advisory Paperclip review is neutral with a substantive 5/5 verdict.
Greptile is 5/5 and there are no unresolved review threads. [Final CI
run](https://github.com/paperclipai/paperclip/actions/runs/42293625696).
The follow-up commit only removes six new code-comment lines to follow
CONTRIBUTING.
- The native provider and signed platform API are controlled test
boundaries. The tests use real PostgreSQL, recovery, ownership, file
persistence, retry admission, dispatch, and finalization services.
Deployed recovery remains unverified until normal rollout.

## Risks

- The main risk is mistaking an audit receipt for current stop
authority. The reader checks its exact shape and run binding. The
receipt cannot replace stopped leases, saved-file receipts, settled
preparation, current authorization, or the absence of an active owner or
provider evidence.
- The negative matrix runs with the audit field present. Provider
activity, unknown usage, bad file receipts, Stop, actor changes, and
unsettled leases still block continuation.
- No schema or migration change is required.

## Model Used

OpenAI GPT-6 in Codex. The exact deployment model ID and context-window
size are not exposed in this session. Used reasoning, code editing,
shell execution, and test tools.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
2026-11-06 15:36:23 -06:00
a019d00a39 fix(server): wake native workspace finalization from committed work (#17734)
## Thinking Path

> - Paperclip is the open source app people use to manage AI agents for
work.
> - Native runs can accept a result before workspace copy-back finishes.
> - The periodic orphan pass repeatedly tries this recovery, including
cases that require operator action.
> - Copy-back needs exact ownership evidence. A generic timer cannot
grant that authority.
> - This pull request wakes workspace recovery from committed changes
and local owner completion.
> - Saved retries use the existing scheduler. Empty work, completed
barriers, and operator holds become quiet.

## Linked Issues or Issue Description

Refs #17717. This is slice 52 of the recurring-server sleep stack,
targeting master after parent #17717 merged at
`4c56702e06c698cc10d4a86514669aba0f4d9a9b`. Related work: #17709 (status
reassessment), #17687 (unsafe export recovery), and #16478 (workspace
repair holds).

This PR covers native workspace copy-back and validation. Result
commit/projection and resource settlement remain separate recovery
duties. It does not claim full-instance sleep.

## What Changed

- Register a company/run/task-scoped workspace worker. Reconstruct
accepted, unfinished work from existing records. Use saved retry and
lease deadlines.
- Notify from both accepted-result writers (control-plane and PRP
coordinator), workspace receipts, coordinator changes, operator
confirmation, retained workspace repair, and relevant task updates.
Notifications follow the outer transaction.
- Distinguish active local ownership, busy external ownership, pending
Cloud evidence, operator-required evidence, and changed bindings. Only
concrete external ownership/evidence waits receive a scoped retry.
- Preserve advisory locks, signed stop proof, exact binding checks,
physical callback joins, and existing failure policy. Join physical
operations during shutdown.
- Respect the existing heartbeat execution-suppression policy before
discovery and execution; wake suppressed work on settings activation.
- Skip physical workspace recovery in the enabled periodic orphan pass.
Keep direct/startup reconciliation and the remaining result/cleanup
recovery paths.
- Keep routine company-only finalization hints quiet. Ordinary work
requires issue/run scope; explicit settings and owner-release events
keep their company-wide contract.
- Preserve the parent's entire Runner/package tree, profile 80 and all
historical identities. Add the dated obligation, producer, lifecycle and
limitation audit.

## Verification

- Current local source: `4059b24e3ea5c623be54ade18ec9b6ab78eb0289`,
prepared by a normal merge of the current parent. The sole manual
conflict keeps ordinary workspace fanout inside the existing issue/run
guard. All 1,198 parent-only, 15 owned-only and 10 automatic shared
paths are preserved. The complete package tree matches the parent
byte-for-byte.
- Controlled regression: the original workspace-only unscoped fanout
performs three candidate SELECTs for routine company hints. The same
zero-query assertion passes with scoped fanout. A real accepted result
then produces one successful workspace settlement and returns to quiet.
The failed baseline remains in the audit.
- The first complete local group passes **1,693 cases in 14 files**,
including all 19 workspace-worker cases. It covers both accepted-result
producers, physical ownership, export retry/failure, finalization
recovery, arbiter corpus, issue recovery actions, control-plane port,
workspace recovery, heartbeat recovery, startup, retained cleanup and
native execution.
- Separate process-recovery and external-chat response files qualify the
changed recovery/settlement paths without sharing their general test
database with other files. Both pass in full: 410 process-recovery cases
in 162.79 seconds and 273 external-chat cases in 53.79 seconds. The
total is **2,376 distinct passes in 16 complete files**, with no skips.
Normal merge `5c46c52873158529736b8349e4d44658865108ee` adopts the
parent squash with this entire tested child tree unchanged.
- Production server typechecking, build, module boundaries, migration
order and source-profile checks pass. Thirteen dedicated PostgreSQL 17
fixtures use the unchanged migration 413 schema. Embedded-only paths use
the existing recovery helper with fresh per-call fixtures. All temporary
imports are restored byte-exact. No test assertion or timeout is
relaxed.
- Runner validation belongs to the unchanged parent package tree: 130
passing installation/compatibility/transport cases, 22 installed
ACPX/Grok contract cases and 26 native-provider Rust cases. One existing
opt-in closed Pi snapshot case is skipped because its distribution root
is not configured. These are source-scoped checks, with no live provider
qualification claim.
- The owner audit at
`doc/plans/2026-10-26-native-workspace-finalization-sleep-audit.md`
preserves earlier failures and their disposition. Current-head
acceptance: all 57 checks are clean, including protected CI and
security. Greptile gives 5/5 on
`7df5c9c44ea9e171be3c61b4430d3727b10f3337` with no actionable findings.
Earlier scores do not substitute for this result. No Ponytail verdict is
present under the authorized missing-review policy.
- No claim of a full local repository suite, deployed app/database
sleep, expanded Cloud wake coverage or measured cost savings is made.

## Risks

- Supported wake producers are in-process application services. This
adds no cross-replica or independent SQL-writer transport.
- A real unresolved export still needs recovery. Busy owners and pending
Cloud stop evidence retain a 30-second scoped check. No timeout
authorizes copy-back.
- Result projection and resource release still use their existing
recovery. Some existing cleanup failures remain best effort; this PR
does not infer cleanup success from a workspace barrier.
- Cloud alarm coverage and host-sleep safety remain unchanged. No
deployed suspension or cost savings have been measured.
- Parent #17717 is merged. Current base is master at
`4c56702e06c698cc10d4a86514669aba0f4d9a9b`. Fresh current-head CI and
review must pass before this slice merges.

## Model Used

OpenAI Codex, GPT-6 family, with repository tools and code execution.
The exact serving model ID and context-window size are not exposed in
this session. No subagent was used for this slice.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
Co-authored-by: Codex <noreply@openai.com>
2026-10-29 04:40:01 -05:00
0b0e53029f fix: recover saved workspace results automatically (#15824)
## Thinking Path

- Paperclip preserves accepted agent results before workspace copyback
and result commitment.
- A replaced controller can leave a physical copyback owner receipt
behind. A lost database lock or expired lease cannot prove that its
tar/Git children stopped.
- Infrastructure recovery should belong to the runtime and deployment
harness; task users should not investigate processes or attest shutdown.
- New receipts record the exact deployment. The harness independently
verifies that deployment fully stopped and signs a short-lived proof
bound to the stack, run, owner and deployment.
- The existing guarded reconciler then finishes the same accepted result
without a new agent turn. Legacy receipts retain the documented
administrator API after independent platform verification.

## Linked Issues or Issue Description

**What happened?**

An accepted native result can remain at `workspace_finalizing` with an
abandoned physical copyback owner. Repeated recovery sweeps could
replace specific instructions with advice to start new agent work. The
first version of this PR exposed a shutdown-evidence form in the task;
that asks end users to resolve infrastructure details.

**Expected behavior**

Automatically verify and recover the exact stopped deployment, preserve
the original accepted result and existing approval/monitor waits, and
show only a quiet task status. Unknown or live workers must remain
fenced. Older receipts without platform identity need independently
verified operator assistance through the administrator API.

**Steps to reproduce**

1. Persist an accepted native result and a copyback receipt from a prior
controller.
2. Replace that deployment before workspace finalization commits.
3. Let the normal finalization reconciler revisit the saved result.
4. With a platform-bound receipt and a fully stopped deployment,
recovery should finish automatically. With missing, live, unverifiable
or changed ownership, it must not write files or create another provider
turn.

Related public work: #14402 introduced copyback ownership; #9687 handles
dead-run finalize barriers; #15795 handles terminal stale-run cleanup.
This change addresses an accepted result whose physical copyback owner
prevents commitment.

## What Changed

- Record Railway project, environment, service and deployment identity
on new physical copyback owners.
- Request read-only platform verification from the managed cloud
harness. Require an Ed25519 stop receipt with a disjoint purpose,
configured signing key, exact stack/run/owner/deployment binding and
valid expiry.
- Keep live, unknown, malformed, unavailable and legacy owners fenced.
Compare the whole prior receipt during ownership takeover, under the
existing dedicated advisory lock.
- Persist platform proof and audit automatic takeover. Resume normal
finalization of the same saved result, preserving task ownership,
approved boundaries, monitors and pending confirmations.
- Remove process metadata, shutdown evidence, confirmation checkboxes
and infrastructure-repair forms from task views. Suppress the duplicate
technical owner-recovery card. Show “Restoring saved work…” only from
server-confirmed recovery or queued operator recovery; platform identity
alone shows the operator-assistance fallback. Remove the status when
recovery resolves.
- Share current-task, current-running-execution, accepted-result,
authoritative-reviewer and newer-execution checks between automatic and
operator recovery. Validate after the provider lookup, atomically with
the owner claim, and again before file publication; closed or superseded
tasks cannot start copyback.
- Keep the separately authorized exact-owner API for operator recovery
of legacy receipts, with active-lock, live-controller, stale-result and
newer-execution rejection. Generic dismissal cannot bypass the copyback
fence.
- Replace obsolete form stories with production-backed automatic,
queued, legacy, completed and mobile examples; retain stable suite IDs.
Update the operator runbook and scoped Storybook catalog.

## Verification

- Red/green: new platform-proof tests failed before implementation; the
database takeover regression failed against the original ownership
guard; reduced-UI assertions failed against the original form. All pass
after the changes.
- Passed: 59 physical-owner/finalization database tests using isolated
PostgreSQL, including real reconciler commitment from all three
saved-result phases through both automatic and operator recovery. They
preserve result identity, exact saved file bytes, pending approval and
overdue monitor waits, and create no new run or wake request. Unknown
evidence and changed ownership remain fenced.
- Passed: 162 focused proof, cloud identity, recovery route,
recovery-card and reduced-UI tests.
- Passed: full workspace typecheck and build, final server/UI
typechecks, token gates, and Storybook build.
- Browser inspection: desktop task composition shows only the quiet
status; completed example removes it and retains the approval-wait
message. Mobile shows the existing bottom navigation with no horizontal
overflow. These are fixture UI observations, not live provider
acceptance.
- A companion harness change implements the actual provider check,
signed receipts, server-token authentication and bounded/coalesced
provider reads. Its full typecheck and test suite passed: 3,240 passed,
92 skipped, zero failures. This application alone cannot enable platform
verification.
- The updated full application `pnpm test:run` was stopped after
repeated local embedded-Postgres startup failures; it is not claimed
green. The same affected recovery suites pass against isolated
PostgreSQL. CI passed on final head `9ad5c3529e`: 54 successful checks,
two intentional skips, and successful legacy Snyk status. Greptile is
5/5 with no unresolved findings.
- Global Storybook catalog validation is green: 225 files, 2,224
stories. Its 17 catalog/index tests pass. Master was merged and the
inherited index metadata was reconciled after source review.
- Review correction red/green: two UI and two database assertions
reproduced misleading progress / missing server recovery state; all pass
after server-confirmed state was added. All 153 focused server tests and
68 UI tests pass on the final recovery code, including repeated-sweep
idempotence. Full workspace typecheck/build, token gates and Storybook
build also pass.
- Safety regression red/green: stale-task copyback and publication tests
failed against the previous guard. The final suite covers changes during
proof lookup, closed/cancelled tasks, replaced execution/checkout, newer
and queued legacy runs, reassignment and rejected/unbound results, plus
the real reconciler selecting closed or superseded tasks. Files remain
untouched and no workspace operation starts.
- No staging mutations, deployment, live provider probes or live
production recovery were performed. The three historical receipts lack
deployment identity and still require independent operator proof.

## Risks

Automatic takeover requires the companion harness release and configured
runtime-identity keys. Deploying only this application leaves
unavailable evidence fenced. Legacy receipts are not retrospectively
assigned a deployment identity. An authorized operator can still make an
incorrect attestation through the fallback API; its administrator gate
and exact-owner safeguards remain. Provider history that is missing or
deeper than the bounded lookup defers automatic recovery. Copyback can
still fail under its existing retained-workspace policy.

No migration, telemetry change or cloud provider credential delivery is
required. The companion harness PR also has passing CI and a 5/5 review;
neither branch is deployed.

## Model Used

OpenAI Codex, GPT-6, with repository inspection, browser verification,
tool use and code execution. The exact serving model ID and
context-window size were not exposed in this session.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change and contains no internal
Paperclip ticket id or instance-derived details
- [x] I have run the relevant tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
Co-authored-by: Paperclip <paperclip@paperclip.ing>
Co-authored-by: Devin Foley <devin@paperclip.ing>
2026-10-13 10:14:45 -05:00