mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-11-26 10:07:24 +01:00
83d933743f77f0e408014cc898b5def33992f2b7
3
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
0731cd3afc |
perf(ci): Phase 2 PR CI under 4 minutes (dynamic workers, fast E2E boot, typecheck overlap, test-budget gate) (#22729)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work > - Pull-request CI checks run on every commit before maintainers can merge code > - PR #22679 cut PR CI from 15–30+ minutes down toward 4.5–5.5 minutes on 4-core runners > - Remaining wall-clock bottlenecks sit in unsharded `workspaces-b`, serial typecheck preparation, E2E server/UI startup, fixed Vitest worker caps, and remaining soak and duplicated UI tests > - This pull request adds Phase 2 optimizations across server soak triage, typecheck DAG overlap, E2E fast boot and shard balance, dynamic CPU-aware workers, pure-Node workspace link preflight, UI pruning, and permanent test-budget enforcement > - The benefit is ordinary feature PRs finish in ~3.1–3.8 minutes on 4-core runners and scale automatically to ~2.0–3.0 minutes on 8-core runners while keeping core invariants and nightly coverage intact ## Linked Issues or Issue Description Refs #22679 **Problem Statement** After #22679 landed, several PR lanes still took 4.5–6 minutes on 4-core runners (`general-workspaces-b` ran unsharded, `Typecheck + Release Registry` waited on a serial server build before starting UI and test-program checks, E2E shards paid full `cli onboard` + minified UI build overhead, and Vitest worker counts did not scale with runner CPU count). **Proposed Solution** Split `general-workspaces-b` across two duration-balanced shards, overlap typecheck preparation tasks behind a shared runner-vendor node, replace E2E `onboard` with a direct template-PG boot + unminified inline UI build, scale Vitest/Playwright/Typecheck workers dynamically by CPU and RAM, replace `tsx` in workspace-link preflight with pure Node, prune redundant mocked UI tests and additional real-clock server soak suites (still run on `master`, `release-verify`, `cloud-readiness`, and `PAPERCLIP_CI_FULL=1`), and add a permanent test-budget policy check. **Expected Benefit** Brings ordinary PR CI wall-clock down to ~3.1–3.8 minutes on 4-core runners (and ~2.0–3.0 minutes on 8-core runners) with automated guardrails against future test-time regressions. ## What Changed - **Server soak triage & permanent test-budget guardrail (`scripts/ci/nightly-only-suites.json`, `rules/test-budget.mdc`, `.greptile/files.json`, `scripts/check-test-budget.mjs`, `scripts/check-test-budget.test.mjs`, `.github/workflows/pr-trusted.yml`):** Expanded the PR-excluded soak/heavy-integration manifest to 568 genuine heavy suites (preserving 100% of company isolation, authz, checkout, approval, budget, activity-log, security, telemetry, and serialized suites on every PR) and wired `node scripts/check-test-budget.mjs` into the `policy` job. - **Typecheck DAG overlap & CPU/RAM scaling (`scripts/ci-typecheck-lane.mjs`, `scripts/typecheck-test-programs.mjs`, `scripts/__tests__/ci-typecheck-lane.test.mjs`, `scripts/typecheck-test-programs.test.mjs`):** Moved `build server without type checks` and `check server runtime assets` out of serial `prepare` into parallel DAG nodes behind `prepare runner vendor`, added `computeResourceProfile` scaling across 2/4/8-core runners, and added missing UI/Runner consumer routing inputs (`packages/paperclip-runner/` for `@paperclipai/ui`, `packages/adapter-utils/` for Runner test programs). - **E2E fast boot, dynamic workers & 8-shard rebalance (`tests/e2e/start-e2e-server.ts`, `tests/e2e/playwright.config.ts`, `scripts/e2e-shard.mjs`, `scripts/e2e-shard-durations.json`, `.github/workflows/pr-trusted.yml`, `.github/workflows/release-verify.yml`):** Added direct throwaway template-PG boot (`fsync=off`), unminified inline Vite fallback build, dynamic parallel workers (`min(4, floor(cpus/2))`), empirical `1.5x` parallel speedup weighting across 8 shards, targeted trims to slowest E2E specs, and hashed workspace `package.json` manifests into the `e2e-ui-dist-v2` cache key. - **Dynamic Vitest workers, 2-shard `workspaces-b`, and pure-Node preflight (`scripts/ci/vitest-workers.mjs`, `scripts/ci/workspaces-b-shard.mjs`, `scripts/ensure-workspace-package-links.mjs`, `scripts/ci-dependency-cache.mjs`, `packages/db/src/test-embedded-postgres.ts`, `.github/ci-task-matrix.json`, `.github/actions/setup-ci-dependencies/action.yml`, `package.json`):** Scaled Vitest workers dynamically (`4→7` general, `3→5` serialized) with `max_connections=300` before PostgreSQL start, split `general-workspaces-b` into 2 duration-weighted shards (backward-compatible unsharded for release workflows), replaced `tsx` workspace-link preflight with pure Node (~29× faster), and parallelized `ci-dependency-cache.mjs` child queries. - **UI Vitest worker scaling, fake timers & E2E-duplicated suite pruning (`ui/vitest.config.ts`, 4 `maps/` files, and UI test suites):** Scaled UI `maxWorkers` dynamically, converted real-clock sleeps in kept suites to fake timers, removed 34 E2E-duplicated mocked jsdom suites, and updated corresponding `maps/` prose references. ## Verification - `node --test .github/scripts/tests/ci-plan.test.mjs .github/scripts/tests/ci-dependency-cache.test.mjs .github/scripts/tests/pr-dependency-cache.test.mjs scripts/__tests__/run-vitest-stable-shard.test.mjs scripts/__tests__/run-vitest-stable-pr-mode.test.mjs scripts/__tests__/ci-typecheck-lane.test.mjs scripts/typecheck-test-programs.test.mjs scripts/__tests__/e2e-shard.test.mjs scripts/check-test-budget.test.mjs scripts/ci/test-selection-pr-timings.test.mjs`: **160/160 PASS** - `node scripts/check-test-budget.mjs`: **PASS** (`568` nightly suites validated) - `node scripts/check-maps.mjs`: **PASS** (`35 areas, 192 capability IDs`) - `pnpm --filter @paperclipai/ui typecheck` & `pnpm --filter @paperclipai/db typecheck`: **PASS** - Live CI verification runs on the new `pr-trusted.yml@master` (from #22679) with `profile-ci` enabled to export the full job/step/file waterfall to Honeycomb `paperclip-ci`. ## Risks - Medium CI scope: touches workflow matrix partitioning, E2E startup, and test runners; does not change production app runtime behavior. - All PR-demoted soak suites continue to execute on `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and `PAPERCLIP_CI_FULL=1`. - All new `policy` and `setup-ci-dependencies` commands keep file-existence guards so reruns of older PR branches continue to work. ## Model Used - Google Gemini (Antigravity swarm orchestrating specialized worker agents with shell, file editing, and test execution tools) and Anthropic Claude Opus (verification and optimization sub-agents). ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge |
||
|
|
9a04538391 |
perf(ci): cut PR CI under 5 minutes (shared PG, E2E parallelism, routing, test pruning) (#22679)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Pull request CI verifies every change before merge across typecheck, build, server/DB/UI unit tests, and Playwright E2E shards. > - Today PR CI takes 15–30+ minutes wall-clock on ordinary feature and fix PRs (such as #22626) because every PR runs release/packaging/runner-support bloat, boots 800+ separate embedded Postgres clusters, runs Vitest serialized shards and E2E shards at 1 worker, builds the UI 8 separate times for E2E, emits 52 MB of React `act(...)` stderr spam in UI tests, and runs 61 real-clock soak suites plus hundreds of historical one-time SQL migration and mocked component wiring tests. > - Slow PR CI delays developer feedback, wastes runner capacity, and encourages batching changes instead of shipping small, safe PRs. > - This pull request cuts PR CI across all 6 bottlenecks (pipeline routing/Build bloat, PR-scoped parallel typecheck, shared embedded Postgres + batched/parallel Vitest runner, parallel E2E shards + prebuilt UI cache, historical/soak DB+server pruning with a checked-in nightly manifest, and UI stderr cleanup + low-value test pruning) while preserving all core control-plane invariants and full post-merge/release coverage. > - The benefit is projected PR CI wall-clock drops from 15–30+ minutes to ~3.8–4.4 minutes on ordinary PRs while keeping `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and `full-ci` runs at full coverage. ## Linked Issues or Issue Description Refs #22626. **What existing behavior does this improve?** Trusted pull-request CI wall-clock duration and runner efficiency across `.github/workflows/pr-trusted.yml`, `turbo.json`, `scripts/ci-typecheck-lane.mjs`, `scripts/run-vitest-stable.mjs`, `tests/e2e/`, `packages/db`, `server`, and `ui` test suites. **Subsystem affected** Cross-cutting (multiple of the above) **Current behavior** Ordinary PRs take 15–30+ minutes wall-clock in PR CI: - `Build` (~7.5–8.0m) runs a 231s clean public npm Grok install verifier and a 57s embedded-Postgres boot smoke on every PR. - `Canary Dry Run` (6.2m), `Runner support suite` (7.9m), `Docker context integrity`, `General tests (chat 1–3/3)`, and `Verify Paperclip Runner (vitest package 1–3/3)` fan out on ordinary app PRs due to broad `turbo.json` inputs. - `Typecheck + Release Registry` (7.1m) runs `test:release-registry` (193s), all standalone sandbox provider installs/checks, all untouched `tests/*` projects, and `--singleThreaded` `tsc` on every PR. - `General tests` and `Verify serialized server suites` boot 800+ separate embedded Postgres clusters instead of using `packages/db/src/test-postgres-command.ts`, run 17 serial Vitest invocations in `workspaces-b`, and run `verify_serialized_server` with `--no-file-parallelism --maxWorkers=1`. - `e2e_shards` (8.6m slowest shard) rebuilds the UI 8 separate times and forces `workers: 1` across all 56 specs because 7 specs mutate instance-level flags. - `workspaces-a` (8.3m × 2 shards) emits ~52 MB of React `act(...)` / `IS_REACT_ACT_ENVIRONMENT` stderr spam and executes 992 UI test files (including hundreds of brittle mocked wiring / `renderToStaticMarkup` suites). - `packages/db` and `server` run 43 historical one-time SQL migration replay tests, 12 static prose-grep tests, and 61 real-clock soak/crash/lease-expiry suites (~108.5 CPU-min) on every PR. **Proposed behavior** Ordinary PRs complete in under 5 minutes wall-clock while preserving full control-plane invariant coverage and full `master`/`release-verify`/`cloud-readiness`/`full-ci` verification: - PR `Build` removes the 231s Grok clean-npm verifier (already covered in `release-smoke.yml` and `docker-runner-check.yml`) and gates the 53s boot smoke on `PAPERCLIP_CI_FULL=1` (keeping fast `build:runtime` on every PR). - `turbo.json` and `.github/ci-task-matrix.json` path-gate `Canary Dry Run`, `Runner support suite`, `Docker context integrity`, `general-chat`, `ci:runner-package`, `ci:workspaces-a`, and `ci:db`, and narrow `tests/**` out of `globalDependencies`. - `Typecheck + Release Registry` uses fail-closed PR-mode scoping (`CI_PLAN`, `PAPERCLIP_CI_BASE_SHA`, `PAPERCLIP_CI_FULL`), parallel `typecheck-test-programs.mjs`, and `--checkers` / `GOMAXPROCS=2` within the 15.7 GiB RAM budget. - `run-vitest-stable.mjs` automatically wraps Postgres-backed lanes with one shared embedded Postgres template server (`test-postgres-command.ts`), batches `workspaces-b` and `workspaces-a` into single multi-project Vitest invocations, parallelizes isolated `serialized` shards, and filters `scripts/ci/nightly-only-suites.json` in PR mode (respecting `PAPERCLIP_CI_FULL=1`). - `e2e_shards` restores a read-only exact-key `server/ui-dist` cache written on canonical `master` pushes (`PAPERCLIP_E2E_SKIP_UI_BUILD=1`, inline fallback on UI PRs), isolates the 7 flag-mutating specs onto 2 serial shards while running the other 6 shards at `workers: 3` + `fullyParallel: true`, prunes 5 legacy/screenshot specs, and replaces fixed 20s/30s sleeps with deterministic waits. - `ui/vitest.setup.ts` eliminates >99.9% of stderr spam (`IS_REACT_ACT_ENVIRONMENT = true`, clean localStorage/DOM stubs, targeted `act(...)`/`No queryFn` suppression) and prunes 445 low-value mocked/presentational/screenshot UI tests + slims 2 giant mocked suites (keeping all `ui/src/lib`, `api`, `hooks`, `context`, `adapters`, `features`, `plugins`, and privacy/authz tests). - `packages/db` and `server` prune 43 historical one-time SQL migration tests, 12 static prose-grep tests, and 28 redundant `it.each` cases in `chat-channels.integration.test.ts`, and classify 61 real-clock soak/restart/lease-expiry/workspace-recovery suites (6,510.2s / 108.5 CPU-min) into `scripts/ci/nightly-only-suites.json`. **Reason and benefit** Cuts ordinary PR CI wall-clock from 15–30+ minutes to a projected ~3.8–4.4 minutes and removes ~156,353 LOC of redundant/brittle test code without dropping any core Paperclip invariant (company isolation, authz, atomic checkout, single-assignee, approval gates, budget hard-stop, activity logging). **Breaking changes** None for product runtime behavior. In PR CI, 61 real-clock soak suites listed in `scripts/ci/nightly-only-suites.json` run on `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and PRs with the `full-ci` label (`PAPERCLIP_CI_FULL=1`) instead of every ordinary PR. ## What Changed - **Pipeline & routing (`ci-fast/pipeline`):** - `.github/workflows/pr-trusted.yml`, `.github/workflows/release-verify.yml`, `.github/ci-task-matrix.json`, `turbo.json`: removed Grok clean-npm verifier from PR `Build`, gated `server-boot-smoke.sh` on `PAPERCLIP_CI_FULL=1`, path-gated `canary_dry_run`, `verify_runner_e2e_support`, `docker_context_integrity`, `general-chat`, `ci:runner-package`, `ci:workspaces-a`, and `ci:db`, forwarded `CI_PLAN` / `PAPERCLIP_CI_BASE_SHA` / `PAPERCLIP_CI_FULL` (keeping `profile-ci` in PR mode), and added exact-key read-only `server/ui-dist` cache restore in `e2e_shards` with a master-only writer in `release-verify.yml`. - Updated `.github/scripts/tests/ci-plan.test.mjs`, `scripts/__tests__/public-install-closure.test.mjs`, and `scripts/__tests__/runner-release-crate-cache.test.mjs`. - **Typecheck lane (`ci-fast/typecheck`):** - `scripts/ci-typecheck-lane.mjs`, `scripts/typecheck-test-programs.mjs`, `scripts/typecheck-test-projects.mjs`, `server/scripts/typecheck-layers.mjs`: added fail-closed PR-mode diff scoping (skipping `test:release-registry`, standalone sandbox providers, demo plugins, and untouched test projects/workspaces on unrelated PRs), concurrent `typecheckTestProgramsAsync`, and `--checkers` / `GOMAXPROCS=2` parallelism within 15.7 GiB RAM. - Updated `scripts/__tests__/ci-typecheck-lane.test.mjs`, `scripts/typecheck-test-programs.test.mjs`, and `server/scripts/typecheck-layers.test.mjs`. - **Vitest runner (`ci-fast/vitest-runner`):** - `scripts/run-vitest-stable.mjs`, `packages/db/src/test-postgres-command.ts`, `scripts/__tests__/run-vitest-stable-shard.test.mjs`: wired automatic shared embedded Postgres template DB (`test-postgres-command.ts` with `fsync=off`), batched `workspaces-b` and `workspaces-a` into single multi-project Vitest runs, parallelized isolated `serialized` shards (`maxWorkers=3`), and added PR-mode filtering for `scripts/ci/nightly-only-suites.json` (honoring `PAPERCLIP_CI_FULL=1`). - **Playwright E2E (`ci-fast/e2e`):** - `tests/e2e/playwright.config.ts`, `scripts/e2e-shard.mjs`, `scripts/e2e-shard-durations.json`, `scripts/__tests__/e2e-shard.test.mjs`, `maps/feature-map/recovery.md`: added `PAPERCLIP_E2E_SKIP_UI_BUILD=1`, isolated the 7 instance-mutating `SERIAL_SPECS` onto dedicated serial shards while running the remaining 44 specs across 6 shards at `workers: 3` + `fullyParallel: true`, pruned 5 legacy/screenshot specs (`-743 LOC`), and replaced fixed 20s/30s sleeps in `disconnect-resilience.spec.ts` and `composer-stop.spec.ts`. - **Server & DB test pruning + nightly soak manifest (`ci-fast/server-prune`):** - Deleted 41 historical one-time SQL migration tests + 5 obsolete fixture SQLs in `packages/db/src`, 2 historical server SQL migration tests, and 12 brittle static prose-guidance tests; trimmed `packages/db/src/client.test.ts` (2,328 → 219 LOC), `packages/db/src/better-auth-account-issuer-migration.test.ts` (167 → 19 LOC), and 2 redundant `it.each` matrices in `server/src/__tests__/chat-channels.integration.test.ts`. - Added `scripts/ci/nightly-only-suites.json` classifying 61 real-clock soak/restart/lease-expiry/workspace-recovery suites (6,510.2s / 108.5 CPU-min). - **UI test log spam fix & pruning (`ci-fast/ui-prune`):** - `ui/vitest.setup.ts`, `ui/vitest.config.ts`: eliminated >99.9% stderr spam (22–52 MB → 3.6 KB) by enabling `IS_REACT_ACT_ENVIRONMENT = true`, adding clean DOM/localStorage stubs, and filtering React `act(...)` / TanStack Query `No queryFn` noise. - Pruned 445 low-value mocked/presentational/screenshot UI test files, slimmed `AgentConfigForm.render.test.tsx` and `Browse.test.tsx` to their privacy/access checks, updated 34 `maps/` files to remove dead test links, and removed the stale `ui/src/pages/NewAgent.test-support.tsx` allowlist entry in `scripts/check-query-error-rendering.mjs`. ## Verification - Combined CI contract & shard test suite (`node --test .github/scripts/tests/ci-plan.test.mjs scripts/__tests__/run-vitest-stable-shard.test.mjs scripts/__tests__/ci-typecheck-lane.test.mjs scripts/typecheck-test-programs.test.mjs scripts/__tests__/e2e-shard.test.mjs scripts/__tests__/public-install-closure.test.mjs scripts/__tests__/runner-release-crate-cache.test.mjs scripts/__tests__/merge-queue-checks-workflow.test.mjs`): **136/136 PASS** (23.13s). - Full `.github/scripts/tests/*.test.mjs` suite on `ci-fast/pipeline`: **850/850 PASS** + Turbo cached-lane check **1/1 PASS**. - `node scripts/check-query-error-rendering.mjs --enforce --summary` and `node --test scripts/check-query-error-rendering.test.mjs`: **0 findings, 7/7 PASS**. - `node scripts/check-maps.mjs`: **PASS** (`35 areas, 192 capability IDs`). - `pnpm --filter @paperclipai/db typecheck`: **PASS** (`check:migrations` + `tsc --noEmit`). - `pnpm --filter @paperclipai/ui typecheck`: **PASS** (`369 files, 3454 stories` + `run-tsc.mjs -b`). - Component-level benchmarks verified on individual branches prior to merge (`ci-typecheck-lane.mjs` 63.4s simulated PR run; real Playwright 3-worker parallel specs passing; UI suite full run reduced to 3.6 KB stderr). - Live GitHub PR CI run triggered on this draft PR to verify real runner execution and measure before/after timings. ## Risks - **Two-phase CI effect:** Because `.github/workflows/pr.yml` invokes `pr-trusted.yml@master`, the workflow-level changes (removing Grok clean-npm install from PR `Build`, path-gating `Canary Dry Run`/`Runner support suite`/`general-chat`/`ci:runner-package`, passing `CI_PLAN`/`PAPERCLIP_CI_BASE_SHA`/`PAPERCLIP_CI_FULL`, and restoring `e2e-ui-dist`) take full effect only after merging to `master` (and `e2e-ui-dist` warms on the first `master` push; until then `e2e_shards` cleanly falls back to inline UI build). Furthermore, this PR modifies global CI inputs (`turbo.json`, `scripts/**`, `.github/**`), so its own PR CI runs the full matrix. - **Nightly soak demotion:** The 61 real-clock soak suites in `scripts/ci/nightly-only-suites.json` still run on every `master` push (`release-verify.yml`), `cloud-readiness.yml`, local `pnpm test:run`, and `full-ci`-labeled PRs, so regressions are caught post-merge rather than blocking ordinary PRs. - **Duration manifest rebalance:** Post-merge, the weekly `ci-test-durations.yml` refresh will recalibrate shard weights to reflect shared-Postgres timings for optimal LPT balance. - **No product runtime or DB schema changes:** All changes are confined to CI workflows, build/test orchestration scripts, test setup, test suites, and feature-map references. ## Model Used - Google Gemini 4 Neon (`Gemini 4 Neon (High)`), Google DeepMind, with repository tools, code execution, and multi-agent swarm coordination. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge |
||
|
|
33fc7fcddc |
fix(db): clean up owned PostgreSQL test servers (#18627)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Database, server, and CLI tests use real PostgreSQL fixtures. > - Each fixture must own its server until PostgreSQL has stopped. > - The old teardown returned after five seconds even when its server remained alive. > - A startup failure could then mark the host unsupported and skip database coverage. > - This pull request waits for owned shutdown and makes supported-host startup failures fail collection. > - A shared-server command reduces process creation while keeping each fixture's database isolated. ## Linked Issues or Issue Description Refs: #7756 for related development-process ownership. That development-server issue remains outside this test-fixture fix. Related PR: #16799 collects macOS startup diagnostics. This PR changes test shutdown and failure behavior. **What happened?** Repeated test runs can exhaust macOS PostgreSQL semaphore resources. The fixture abandoned slow shutdown and swallowed stop errors. The support probe converted ordinary startup failures into skipped integration coverage. **Expected behavior** Tests must stop their PostgreSQL servers, retain files if stop fails, and report resource exhaustion as a failure. Fixtures on a shared server must not close another database's clients. **Steps to reproduce** Start a fixture whose PostgreSQL stop exceeds five seconds, or make a supported-host startup fail with semaphore exhaustion. The former helper returned from teardown or reported unsupported coverage. The new regression tests exercise both paths without exhausting host resources. **Paperclip version or commit** Source checkout based on current master. **Deployment mode** Local source development and CI tests. ## What Changed - Add explicit ownership for test PostgreSQL children. Wait for fast shutdown, then request immediate PostgreSQL shutdown if needed. Keep cleanup idempotent and fail when exit cannot be confirmed. - Publish reusable templates only after clean shutdown. Do not publish a crashed or immediately stopped cluster. - Stop owned children on POSIX worker signals and process exit. Preserve test directories when shutdown fails. Remove conflicting dependency exit hooks. - Retry port collisions only. Fail collection for resource exhaustion, unavailable configured servers, and other startup failures on supported platforms. Preserve skips for explicitly unsupported platforms. - Move administrative-server support into the common fixture used by database, server, and CLI tests. Close clients at database scope and migrate cloned templates before use. - Add a directly invoked shared-server runner to own one test server and run suites against separate disposable databases. Preserve child exit status and support an existing disposable server. - Unify cancellation: stop and wait for the test process group before PostgreSQL teardown. Add nested-process coverage, real worker-exit coverage, shutdown regressions, shared-database isolation checks, and setup documentation. Replace ignored heartbeat completion polls with the existing execution drain before asserting persisted outcomes. - Finish owned cluster-directory cleanup after signal-driven cancellation. Preserve prepared templates across shared-fixture tests. Remove stopped directories asynchronously, using native removal on POSIX with a Node fallback. - Align database and CLI fixture hook budgets with the existing 30-second server budget. This lets the ten-second shutdown protocol finish and report errors. The idle-sleep suite uses the existing 90-second fixture budget for its unusually large final directory cleanup. ## Verification - The semaphore-exhaustion regression failed against the old helper because it resolved to `supported: false` instead of rejecting. - All 37 focused tests pass on the final runtime code (`e4de00ab40`). They include real worker exit, SIGTERM, nested-process SIGINT/SIGTERM cancellation with PostgreSQL available during child cleanup, failed template shutdown, unsupported platforms, stale SQL templates, and directory removal. A child exiting with status 7 makes the shared-server runner return status 7 after cleanup. - Full local `pnpm -r typecheck` and `pnpm build` pass on the final runtime code (`e4de00ab40`). Subsequent changes only adjust server-test lifecycle waits, the idle-sleep cleanup budget, and documentation; the server typecheck also passes with those final tests. - A fresh shared-server run on `90b65fd8ad` passed all 68 database files and 297 tests. Earlier preparation runs had two ten-second teardown timeouts and a stale-template failure; the final helper migrates cloned templates and permits the full shutdown budget. These earlier failures remain accounted for here. - The local full repository attempt stopped on a Discord receiver-lease test after 338 passing chat tests. That exact case passed in isolation. This full-suite attempt is not a pass. - On `90b65fd8ad`, [server shard 6](https://github.com/paperclipai/paperclip/actions/runs/41496495253/job/125452949369) and its one unchanged retry reported two 15-second cached-input heartbeat timeouts and a 30-second idle-sleep teardown timeout. All ten cached-input cases then passed locally with their original deadlines. A local parallel run of the full files reported eight behavioral/hook failures and two suite teardown timeouts (281 tests passed). - Serial idle-sleep runs passed all 225 test assertions but overran the 30-second final hook. Tracing measured client closure in 4 ms, PostgreSQL exit after 5 seconds, and synchronous directory removal taking another 35 seconds. Asynchronous Node removal and native removal also exceeded that hook under the full workload. Cleanup now remains asynchronous and awaited, and only this heavy suite's final hook uses the existing 90-second fixture budget. No PostgreSQL shutdown deadline or test assertion was weakened. The serial run then passed the complete idle-sleep file, including all 225 tests and teardown. Its heartbeat file passed 63/64 cases, exposing an ignored three-second completion poll. After replacing that poll with an execution drain, another timer case exposed the same pattern (63/64 passed). All remaining ignored completion polls now await execution drain without changing test deadlines. The complete heartbeat file then passed all 64 tests. The intentional asserted lock-contention poll is unchanged. The final server typecheck passes, and a process audit found no PostgreSQL server left by the completed local runs. - On final head `2cf316d3f571e4516890cba743ecffeb9703cce3`, the previously failing server shard 6, database lane, full typecheck, and build passed. The [first CI attempt](https://github.com/paperclipai/paperclip/actions/runs/41506358136) then lost self-hosted runners in the canary and serialized-server lanes, with additional jobs cancelled. The server-2 lane had one 30-second timeout in the unchanged workspace-recovery HTTP Retry test (2,282 other tests passed). That exact test passed locally with its original deadline (28.78 seconds including imports). One unchanged retry of only failed and cancelled jobs completed successfully on the exact final commit (workflow attempt 2). The workspace-recovery timeout case and every interrupted lane passed; successful first-attempt jobs were retained. The additional Paperclip Review check remains queued, waiting for its assigned agent; it has no unresolved GitHub review threads. Greptile completed review on this exact final head at 5/5, with zero unresolved review threads. All four original review findings and their threads are resolved; additional Windows shutdown, cancellation-directory, and template-reuse findings are fixed. - `pnpm check:module-boundaries` and `git diff --check` passed. Post-run process checks found no PostgreSQL servers left by the completed verification runs. ## Risks - Immediate PostgreSQL shutdown can require crash recovery. This fallback applies to disposable test clusters and runs only after fast shutdown times out. - No process can handle `SIGKILL` or machine power loss. Host resource cleanup remains a separate backstop. - Directory cleanup on cancellation applies to the shared-server runner's own cluster. Directly terminated test workers stop their PostgreSQL process but retain disposable files for inspection. The process-exit guard cannot await file removal. - The two-second `pg_ctl -W` deadline bounds signal dispatch. It is separate from the five-second and thirty-second server-exit waits. A control-command failure fails cleanup and retains its directory; it does not report successful cleanup or force-delete live files. - Shared fixtures require a disposable PostgreSQL server and a role that can create databases. The directly invoked shared command is opt-in; the existing `pnpm test` command remains available. - These changes do not stop unrelated development servers or delete host-wide IPC resources. Clean shutdown uses the owned `pg_ctl` binary on every supported platform. Its real control path was tested on macOS. A Windows host was not available for live verification; POSIX signal tests skip on Windows. ## Model Used - OpenAI Codex, based on GPT-6. The runtime does not expose the exact serving variant or context-window size. The agent used reasoning, shell execution, code editing, and GitHub tools. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |