mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-11-12 06:10:44 +01:00
42bc238aa5a1208cabecba76773e0500fcd33959
2
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
ce332ecec0 |
fix(execution-admission): keep admitted project sets after settlement (#18871)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - #18746 added execution-admission storage: one admission row per attempt and one charge row per admitted project. > - Settlement deletes every charge row. The admission row keeps only the primary project and an opaque context revision. > - Thus, after settlement, the complete admitted project set is lost. > - A retained provider session still carries the references of its previous admission. Example: a task mentions A and B, the admission settles, and then a user removes B from the task text. The next admission must still count B, or start a fresh context. The primary project or the context token cannot supply B. > - This pull request keeps the complete admitted set on the admission row after settlement. Charge rows stay the only active capacity. > - The benefit is that later retained-session resolution can read the previous set. Settled history does not hold capacity or block project deletion. ## Linked Issues or Issue Description Refs #18746 (corrects its storage). Related: #2831, #14333. **Subsystem affected** Server execution admission (`server/src/modules/execution-admission/`) and the `packages/db` schema. **Problem or motivation** `settleAdmission` deletes all charges of an admission. No other storage records the complete project set. After settlement, the set cannot be recovered. Current task text is not a replacement, because it can change after admission. **Proposed solution** Add `execution_admissions.admitted_project_ids uuid[]`. It holds the sorted, distinct set. It is written once at admission and a trigger blocks changes. It has no project foreign key. `{}` is a known empty set. Null means unknown. Only settled rows can have null. Migration `0428` fills the set of unsettled `0426` rows from their charges, because those charges are still complete. Settled `0426` rows stay unknown. **Alternatives considered** - Keep charge rows after settlement with a `released_at` column and a partial active index. The project foreign key would then block project deletion permanently, or the key must be removed from active charges. One table would also hold two different facts. - A separate history table with one row per project. This is more rows, joins and constraints for data that is only read as a whole set by admission ID. - Encode the set in `context_revision`. That token is opaque and owned by the context owner. The database cannot validate it. - Use `heartbeat_runs.context_snapshot`. It is mutable and is per run, not per admission attempt. ## What Changed - Schema and migration `0428_retained_admitted_project_sets`: add `admitted_project_ids`, a check (null only when settled, no null elements, at most 100 entries) and an immutability trigger. The backfill fills unsettled rows from their charges and leaves settled rows null. The migration is safe to run again. Migration `0426` is not changed. - `recordAdmission` writes the set. A replay compares against the stored set. `settleAdmission` still deletes the whole charge set in one transaction and does not change the stored set. - Add `readAdmittedProjects` (company-scoped, by admission ID). It returns `known` with the set, or `unknown`. - Add a pure `retainedSessionProjects` rule: a retained session uses previous ∪ current. An unknown previous set returns `fresh_context_required`. No consumer uses it yet; C1b integrates retained sessions. - Update `doc/DATABASE.md` and `server/src/modules/README.md`. Not changed: no public cap writes, no claim or dispatch integration, no session integration, no provider activation, no `serialize` → cap 1 migration. Active counts still use only the indexed charge rows. ## Verification Red, on unchanged `master` code, with the new tests: - `server`: `npx vitest run src/modules/execution-admission/adapters/postgres.test.ts`. The new tests fail. With a temporary reader that uses the only storage `master` has (charges), the settled A+B admission reads `[]` instead of `[A, B]`. - `packages/db`: `npx vitest run src/execution-admission-migration.test.ts` fails, because no `0428` migration exists. Green, with this change: - `server`: `npx vitest run src/modules/execution-admission`: 27 passed. The new PostgreSQL test covers: A+B admission → settlement → set still readable, charges and counts zero, settlement replay keeps the set, a second attempt with a different set, primaryless and empty sets, company isolation, rollback, immutability, the check constraint, and deletion of a project that has only settled history (its ID stays in the set). It also checks that a project with an active charge still cannot be deleted. - `packages/db`: `npx vitest run src/execution-admission-migration.test.ts`: 2 passed. The upgrade test starts from the shipped `0426` schema with an unsettled A+B row, an unsettled empty row and a settled row. After the upgrade the sets are `[A, B]`, `{}` and null. A second run of `0428` changes nothing. - `pnpm --filter @paperclipai/db typecheck` and `check:migrations` passed. `node scripts/check-module-boundaries.mjs` passed. - Not run locally: the server layered typecheck. The local process was killed for memory (a 5.8 GiB limit shared with other jobs). CI runs it. This PR does not prove C2 claim races or C3 lifecycle authority. ## Risks - Migration: one `ADD COLUMN`, an `UPDATE` that only touches unsettled rows (none in production, because nothing writes admissions yet), a check and a trigger. It does not delete or rewrite data. - Settled rows created before `0428` stay unknown. A future consumer must start a fresh context for them. It must not treat them as empty or primary-only. - The stored set has no project foreign key. Company scope is checked at admission time, under the same project locks and the charge foreign keys. Size: about 70 production lines (schema 8, migration SQL 22, adapter 28, domain 15), 105 test lines and 24 doc lines. Generated metadata (`0428_snapshot.json`, `_journal.json`, removal of `0422_snapshot.json` by the standard pruning) is separate. ## Model Used - Anthropic Claude Opus 5.5 (`claude-opus-5-5`) in Claude Code, with tool use (shell, file edits, embedded PostgreSQL tests). Default context window and reasoning mode. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge 🤖 Generated with [Claude Code](https://claude.com/claude-code) Co-authored-by: nickyleach <331803+nickyleach@users.noreply.github.com> Co-authored-by: Paperclip <noreply@paperclip.ing> Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> |
||
|
|
fef86e32e9 |
feat(execution-admission): add project concurrency policy and admission storage (#18746)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Projects group tasks. Agents run tasks as heartbeat runs. > - Today, workspace mode and shared-workspace flags decide whether tasks run at the same time. A project cannot set its own limit on concurrent task executions. > - A correct project limit must count every project that a task uses, including @-mentioned projects. It must also keep the count when a project is archived or deleted, and when a run is admitted more than one time. > - This change cannot go into one pull request with claims and settlement. Thus this pull request adds only the policy semantics and the durable accounting storage that later claims will use. > - This pull request adds a new `execution-admission` module, three tables and the deletion guards. No route writes a cap and no claim path enforces it. > - The benefit is a tested storage contract (constraints, idempotency, rollback, indexed counts, lifecycle preservation) before any behavior changes. ## Linked Issues or Issue Description Refs #2831, Refs #14333 (related agent-level and adapter-level limits; not duplicates). **Subsystem affected** Server execution admission (new module `server/src/modules/execution-admission/`) and the `packages/db` schema. **Problem or motivation** A project cannot limit how many of its task executions are active. The current shared-workspace flags mix resource safety with capacity. A future project limit needs storage that records each admission attempt and every project that the attempt charges. Run IDs cannot be the identity, because a run can be released before dispatch and admitted again. **Proposed solution** Add a separate policy table that keeps "never configured" apart from "explicit no limit". Add admission epochs with one charge row per distinct project. Settlement deletes the charge set in one transaction. Later pull requests integrate claims, settlement, waits and the public control. **Alternatives considered** Columns on `projects` would leak an unenforced cap through every project reader. A project column or a `uuid[]` on `heartbeat_runs` cannot enforce per-project uniqueness or company scope. `budget_reservations` has no project set. A counter would be a second source of truth. ## What Changed - Added `project_task_execution_policies`. No row means never configured. A null maximum means an explicit "no limit". A check accepts only positive maximums. A composite foreign key keeps the project and company together. The row is deleted with its project. - Added `execution_admissions`. Each row is one admission attempt of a run: `(run_id, attempt)` is unique, and a partial unique index allows one unsettled attempt per run. It keeps the context revision, the nullable primary project (provenance, no foreign key) and the settlement identity. A check sets `settlement_id` and `settled_at` together. - Added `execution_admission_project_charges`. It has one row per distinct admitted project, unlimited projects included. Composite foreign keys keep the admission and the project in one company. The project foreign key has no cascade, so a charge cannot disappear with its project. `(company_id, project_id)` is indexed for active counts. - Added migration `0426_absent_guardian.sql` (renumbered from `0423`, then `0425`, as master added `0423`–`0425`). The generated SQL was reordered so the unique indexes exist before the composite foreign keys that need them. Snapshots `0419` and `0420` were pruned to keep five snapshots. - Added the `execution-admission` module (domain → application → adapters): - Domain: policy patch parsing and application (omitted keeps, null clears, partial updates keep other fields, malformed values are rejected), canonical project-set preparation (primary ∪ references, deduplicated, ascending, bounded with an explicit `too_many_projects` result), and the settlement replay decision. - Application: internal `readTaskExecutionPolicy` and `updateTaskExecutionPolicy` commands. No route, tool, CLI or import calls them. - Adapter: the project-set lock (`FOR NO KEY UPDATE`, ascending, one statement), the policy store, and the storage transitions `recordAdmission`, `settleAdmission` and `countActiveProjectCharges`. These transitions are not exported from the module entry point. Claims (later) must add the capacity check and the lifecycle evidence. - Project deletion returns `409 project_execution_admission_pending` while the project has a charge. Agent deletion returns `409 agent_execution_admission_pending` while its runs have an unsettled admission, and removes settled history. Company deletion calls a new module participant before it deletes runs and projects. - Documented the tables, the lifecycle rules and the proposed global lock order in `doc/DATABASE.md`. Added module ownership to `server/src/modules/README.md`. ## Verification - `cd server && npx vitest run src/modules/execution-admission` → 2 files, 26 tests pass (the Greptile finding on an empty primary ID added an assertion to an existing test). The adapter tests use embedded PostgreSQL and cover: - policy semantics, the maximum check and the company foreign key; - charges for every distinct project, a primaryless set and an empty set (no rows); - replay of one admission ID, conflict on a changed record, refusal of a second live attempt and the partial unique index; - settlement of the whole set once, replay, a different settlement, then attempt 2 for the same run; - company isolation of projects, runs and admission IDs, the duplicate-charge key, and rollback of an aborted transaction; - active counts per project, and an `EXPLAIN` that uses `execution_admission_project_charges_project_idx`; - archive keeps charges, `projectService.remove` returns 409, a direct project delete fails on the foreign key, and delete succeeds after settlement; - `deleteAgentDependencies` returns 409 while unsettled, and `deleteCompany` removes only that company's admissions. - `cd packages/db && npx vitest run src/execution-admission-migration.test.ts` → pass. It removes the new tables and receipt, seeds a legacy project and run, applies pending migrations, and compares the existing rows. - `pnpm --filter @paperclipai/db check:migrations` → pass. Five snapshots remain (`0421`, `0422`, `0424`, `0425`, `0426`; `0423` is SQL-only on master). - `node scripts/check-module-boundaries.mjs` → pass. - `packages/db` `tsc --noEmit` → pass. A scoped `tsc` of the module entry points and domain tests → pass. - Existing tests for the changed deletion services → 6 files, 161 tests pass (`resource-lifecycle-events`, `prompt-injection-prevention`, `agent-lifecycle/lifecycle`, `case-deletion`, `project-workspace-root-provenance`, `companies-service`). - Not run locally: the full `server` typecheck. `tsc` and `tsgo` were stopped by the out-of-memory killer on the 7 GB machine (exit 137, also single-threaded). The full `pnpm -r typecheck`, `pnpm test:run` and `pnpm build` were not run locally; CI ran them on head `520b69d553`: all gates pass, including Typecheck, Build and the 12 server test shards. After merging master (`1c9ca5829f`) into head `c088729361`, the migration check, migration upgrade test, module tests, module-boundary check and `packages/db` typecheck were rerun locally and pass; CI is rerunning the full suite. ## Risks - Migration risk is low. It creates three empty tables and indexes. It does not change existing tables or rows. - Behavior changes only when admission rows exist. Nothing writes them yet, so project, agent and company deletion behave as before. - Later claim work must take the project-set lock in the documented order. A claim that takes project locks after issue locks could deadlock with project deletion. - Settlement deletes charge rows, so a settled admission keeps its primary project and context revision but not its full project set. > For core feature work, check [`ROADMAP.md`](ROADMAP.md) first and discuss it in `#dev` before opening the PR. Feature PRs that overlap with planned core work may need to be redirected — check the roadmap first. See `CONTRIBUTING.md`. ## Model Used - Anthropic Claude Opus 5.5 (`claude-opus-5-5`) in Claude Code, with tool use (shell, file edits, embedded PostgreSQL tests). Default context window and reasoning mode. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge 🤖 Generated with [Claude Code](https://claude.com/claude-code) --------- Co-authored-by: nickyleach <331803+nickyleach@users.noreply.github.com> Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com> Co-authored-by: Paperclip <noreply@paperclip.ing> |