mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-11-25 16:14:26 +01:00
1a36a8f3c057e4c77a76a5be4c4bb2d7b2f369be
1
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
0731cd3afc |
perf(ci): Phase 2 PR CI under 4 minutes (dynamic workers, fast E2E boot, typecheck overlap, test-budget gate) (#22729)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work > - Pull-request CI checks run on every commit before maintainers can merge code > - PR #22679 cut PR CI from 15–30+ minutes down toward 4.5–5.5 minutes on 4-core runners > - Remaining wall-clock bottlenecks sit in unsharded `workspaces-b`, serial typecheck preparation, E2E server/UI startup, fixed Vitest worker caps, and remaining soak and duplicated UI tests > - This pull request adds Phase 2 optimizations across server soak triage, typecheck DAG overlap, E2E fast boot and shard balance, dynamic CPU-aware workers, pure-Node workspace link preflight, UI pruning, and permanent test-budget enforcement > - The benefit is ordinary feature PRs finish in ~3.1–3.8 minutes on 4-core runners and scale automatically to ~2.0–3.0 minutes on 8-core runners while keeping core invariants and nightly coverage intact ## Linked Issues or Issue Description Refs #22679 **Problem Statement** After #22679 landed, several PR lanes still took 4.5–6 minutes on 4-core runners (`general-workspaces-b` ran unsharded, `Typecheck + Release Registry` waited on a serial server build before starting UI and test-program checks, E2E shards paid full `cli onboard` + minified UI build overhead, and Vitest worker counts did not scale with runner CPU count). **Proposed Solution** Split `general-workspaces-b` across two duration-balanced shards, overlap typecheck preparation tasks behind a shared runner-vendor node, replace E2E `onboard` with a direct template-PG boot + unminified inline UI build, scale Vitest/Playwright/Typecheck workers dynamically by CPU and RAM, replace `tsx` in workspace-link preflight with pure Node, prune redundant mocked UI tests and additional real-clock server soak suites (still run on `master`, `release-verify`, `cloud-readiness`, and `PAPERCLIP_CI_FULL=1`), and add a permanent test-budget policy check. **Expected Benefit** Brings ordinary PR CI wall-clock down to ~3.1–3.8 minutes on 4-core runners (and ~2.0–3.0 minutes on 8-core runners) with automated guardrails against future test-time regressions. ## What Changed - **Server soak triage & permanent test-budget guardrail (`scripts/ci/nightly-only-suites.json`, `rules/test-budget.mdc`, `.greptile/files.json`, `scripts/check-test-budget.mjs`, `scripts/check-test-budget.test.mjs`, `.github/workflows/pr-trusted.yml`):** Expanded the PR-excluded soak/heavy-integration manifest to 568 genuine heavy suites (preserving 100% of company isolation, authz, checkout, approval, budget, activity-log, security, telemetry, and serialized suites on every PR) and wired `node scripts/check-test-budget.mjs` into the `policy` job. - **Typecheck DAG overlap & CPU/RAM scaling (`scripts/ci-typecheck-lane.mjs`, `scripts/typecheck-test-programs.mjs`, `scripts/__tests__/ci-typecheck-lane.test.mjs`, `scripts/typecheck-test-programs.test.mjs`):** Moved `build server without type checks` and `check server runtime assets` out of serial `prepare` into parallel DAG nodes behind `prepare runner vendor`, added `computeResourceProfile` scaling across 2/4/8-core runners, and added missing UI/Runner consumer routing inputs (`packages/paperclip-runner/` for `@paperclipai/ui`, `packages/adapter-utils/` for Runner test programs). - **E2E fast boot, dynamic workers & 8-shard rebalance (`tests/e2e/start-e2e-server.ts`, `tests/e2e/playwright.config.ts`, `scripts/e2e-shard.mjs`, `scripts/e2e-shard-durations.json`, `.github/workflows/pr-trusted.yml`, `.github/workflows/release-verify.yml`):** Added direct throwaway template-PG boot (`fsync=off`), unminified inline Vite fallback build, dynamic parallel workers (`min(4, floor(cpus/2))`), empirical `1.5x` parallel speedup weighting across 8 shards, targeted trims to slowest E2E specs, and hashed workspace `package.json` manifests into the `e2e-ui-dist-v2` cache key. - **Dynamic Vitest workers, 2-shard `workspaces-b`, and pure-Node preflight (`scripts/ci/vitest-workers.mjs`, `scripts/ci/workspaces-b-shard.mjs`, `scripts/ensure-workspace-package-links.mjs`, `scripts/ci-dependency-cache.mjs`, `packages/db/src/test-embedded-postgres.ts`, `.github/ci-task-matrix.json`, `.github/actions/setup-ci-dependencies/action.yml`, `package.json`):** Scaled Vitest workers dynamically (`4→7` general, `3→5` serialized) with `max_connections=300` before PostgreSQL start, split `general-workspaces-b` into 2 duration-weighted shards (backward-compatible unsharded for release workflows), replaced `tsx` workspace-link preflight with pure Node (~29× faster), and parallelized `ci-dependency-cache.mjs` child queries. - **UI Vitest worker scaling, fake timers & E2E-duplicated suite pruning (`ui/vitest.config.ts`, 4 `maps/` files, and UI test suites):** Scaled UI `maxWorkers` dynamically, converted real-clock sleeps in kept suites to fake timers, removed 34 E2E-duplicated mocked jsdom suites, and updated corresponding `maps/` prose references. ## Verification - `node --test .github/scripts/tests/ci-plan.test.mjs .github/scripts/tests/ci-dependency-cache.test.mjs .github/scripts/tests/pr-dependency-cache.test.mjs scripts/__tests__/run-vitest-stable-shard.test.mjs scripts/__tests__/run-vitest-stable-pr-mode.test.mjs scripts/__tests__/ci-typecheck-lane.test.mjs scripts/typecheck-test-programs.test.mjs scripts/__tests__/e2e-shard.test.mjs scripts/check-test-budget.test.mjs scripts/ci/test-selection-pr-timings.test.mjs`: **160/160 PASS** - `node scripts/check-test-budget.mjs`: **PASS** (`568` nightly suites validated) - `node scripts/check-maps.mjs`: **PASS** (`35 areas, 192 capability IDs`) - `pnpm --filter @paperclipai/ui typecheck` & `pnpm --filter @paperclipai/db typecheck`: **PASS** - Live CI verification runs on the new `pr-trusted.yml@master` (from #22679) with `profile-ci` enabled to export the full job/step/file waterfall to Honeycomb `paperclip-ci`. ## Risks - Medium CI scope: touches workflow matrix partitioning, E2E startup, and test runners; does not change production app runtime behavior. - All PR-demoted soak suites continue to execute on `master`, `release-verify`, `cloud-readiness`, local `pnpm test:run`, and `PAPERCLIP_CI_FULL=1`. - All new `policy` and `setup-ci-dependencies` commands keep file-existence guards so reruns of older PR branches continue to work. ## Model Used - Google Gemini (Antigravity swarm orchestrating specialized worker agents with shell, file editing, and test execution tools) and Anthropic Claude Opus (verification and optimization sub-agents). ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [ ] All Paperclip CI gates are green - [ ] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge |