mirror of
https://github.com/paperclipai/paperclip.git
synced 2026-10-28 04:02:18 +01:00
0373f9f2611088fc019a4206bc68a4d052dfe9fe
5
Commits
| Author | SHA1 | Message | Date | |
|---|---|---|---|---|
|
|
30b753f614 |
perf(budgets): scope accounting and deliver enforcement asynchronously (#17046)
## Thinking Path > - Paperclip manages AI agents and their paid work. > - Budgets must prevent new work and stop reported overruns. > - Cost settlement also ran serial lifecycle reconciliation for every eligible company agent. > - That made request latency grow with unrelated idle agents and delayed results on stop delivery. > - This change separates atomic admission and accounting from durable asynchronous enforcement. > - Scoped live usage detects overruns without writing provisional ledger charges. > - The result is constant query scope for ordinary settlement and recoverable stop delivery. ## Linked Issues or Issue Description **What happened?** Settlement and budget checks entered company-wide lifecycle reconciliation. A company with 1,000 unrelated idle agents performed 1,001 accounting transactions for one ordinary cost evaluation. User requests could also wait for provider termination. Running usage checkpoints did not enforce reported monetary exposure. **Expected behavior** Keep the final reservation gate authoritative. Commit charges, scope blocks, and enforcement intent before returning. Deliver stop requests after commit. Read only applicable policies and execution scopes for ordinary charges. Stop long-running work when supported reported or priced usage establishes an overrun. **Steps to reproduce** 1. Create a disposable company with one company budget and idle agents. 2. Evaluate a charge below the budget with 0, 17, and 1,000 unrelated idle agents. 3. Compare query counts, company accounting transactions, and duration. 4. Use the controlled partial-usage and delayed-stop fixtures to check enforcement and request responsiveness. **Paperclip version or commit** The measured baseline is `6c9b87d0922f1ebfc43e8b0c36889ac5ba7b9837` from `master`. Related public work: Refs #16976, #2006, #3539, #13763, #14296, #16853, #13075. These cover the affected service charge, cancellation, and accounting paths. This change removes their shared reconciliation overhead. ## What Changed - Batch applicable policy exposure under the existing company accounting lock. Preserve exact fractional money and zero-reservation dispatch fences. - Commit a durable final budget dispatch claim before provider I/O. Retain a separate final issue/run ownership transaction through synchronous handoff, without holding the company accounting lock or awaiting provider work. Preserve native recovery lease checks and duplicate handoff fencing. Browser handoff rechecks current policy; it reuses a consumed rate slot only for the identical policy generation. - Separate ledger spend, live observed spend, and effective held capacity. Use the maximum of reservation and live observation for each unfinished operation. - Deliver budget cancellation through the existing coordinator. Revalidate generations and persist queued/running stop fences before external termination. Bound stop concurrency to four. - Apply agent holds only to the affected agent. Project budgets leave other projects running. Project real company transitions in bounded lifecycle batches. - Replace periodic broad reconciliation with durable pending work, startup repair, receipt replay, and concrete retry/window deadlines. Retain drain and idle-safety checks. - Enforce accepted cumulative usage checkpoints without provisional charges. Final accounting atomically replaces live exposure and settles reservations. - Add operator-gated budget spans, regression coverage, map updates, and a real-PostgreSQL comparison harness. No schema or first-party telemetry change. ## Verification - Full workspace `pnpm -r typecheck` passes on the final ownership fix, rebased onto `bbcf5dfe98`. Production `pnpm build` passes on final head `4c5f4de8b1`. Map, module-boundary, token, and Storybook catalog checks pass. - Focused real-PostgreSQL coverage includes the 292-case rebased accounting/dispatch run, 63 browser cases, 52 run-control/cancellation cases, 42 policy-generation cases, 77 lifecycle/commentary cases, and the exact Muse confirmation regression. Native executor unit coverage passes all 768 cases. Final ownership coverage passes: 74 adapter/use-case cases, nine public regression cases, and the additional deleted-project race. These exercise competing ownership, budget changes and charges between phases, zero/nonzero duplicate claims, rollback, recovery contention, read-only capacity rechecks, and controlled HTTP startup after commit. Another 74 pure/startup/tracing cases pass. The complete CI matrix and both 5/5 reviews passed on `1ac9b58`; its external security scan identified a stale-owner handoff race. The final fix restores synchronous issue/run ownership fencing after the accounting transaction commits. Final head `8e84f55ce8` has fresh Greptile 5/5 with zero new comments, Paperclip review 5/5, and a passing security scan. The complete latest-head [CI matrix](https://github.com/paperclipai/paperclip/actions/runs/39535189808) passes, including budget, browser, Runner, build, and canary jobs. The unchanged Runner close fixture passed on its sole same-head job retry. - Broad local `pnpm test:run` invocations were stopped before required source updates (rebase and review fixes). They are not claimed as full passes. Final full-suite coverage comes from the complete latest-head CI matrix; local focused coverage and the incomplete broad invocations are reported separately. - Reproduce performance with `pnpm --filter @paperclipai/server exec tsx ../scripts/benchmark-budget-enforcement.ts --baseline-ref=6c9b87d0922f1ebfc43e8b0c36889ac5ba7b9837`; repeat with `--reverse`. The harness uses disposable real PostgreSQL, 20 warm samples per variant/count, and records raw timings, SQL/lock counts, agent reads, unchanged agent state, and query plans. Final production-source measurement revision: `eff713a4f72c7f4b7a4002a701cb481d4bfccd95`; the extended harness is committed in `4c5f4de8b1`. | Unrelated idle agents | Baseline median / p95 | New median / p95 | Baseline SQL / locks | New SQL / locks | New agent reads | | --- | ---: | ---: | ---: | ---: | ---: | | 0 | 1.80 / 2.33 ms | 2.99 / 3.88 ms | 5 / 1 | 7 / 1 | 0 | | 17 | 15.53 / 19.55 ms | 2.24 / 2.60 ms | 90 / 18 | 7 / 1 | 0 | | 1,000 | 978.35 / 1,790.43 ms | 2.16 / 2.52 ms | 5,005 / 1,001 | 7 / 1 | 0 | - These measurements use local PostgreSQL 18.1 and Node 26.4.0 arm64. They isolate the cost-evaluation core and complete admission path, without hosted-region or provider latency. Prior-revision reversed-order controls also preserved the constant query counts; the final measurements above use the final production source. - Complete reserve → final ownership gate → immediate offline provider result is measured separately, with one responsible agent and one active operation at each unrelated-agent count. Admission p95 baseline/new: 0 agents **11.54 / 29.77 ms**; 17 agents **9.31 / 27.62 ms**; 1,000 agents **24.51 / 74.05 ms**. Baseline admission was already scoped; the stronger final fence adds bounded overhead. New counts stay constant at 53 Drizzle statements, three transactions, two company-accounting locks, and five agent-reading statements bound to the responsible agent. Zero unrelated-agent reads, exactly one provider callback per sample, and no leftover runs or holds. All admission scenarios stay below 250 ms. No external provider calls are included. - The partial-usage/delayed-termination fixture passed 20/20: receipt persistence p95 13 ms, receipt return to observed durable Stop fence p95 28 ms, complete receipt-start-to-fence p95 50 ms, unrelated database request p95 1 ms while termination was blocked. After releasing the controlled termination fixture, acknowledgement p95 was 14 ms. These are separately measured phases; fixture acknowledgement is not live-provider termination latency. - Models and provider deadlines are unchanged. No deployment, live inference, or staging acceptance is claimed. A quiet 30-minute follow-up waits for the merged revision on staging, then repeats classifier and controlled budget-stop acceptance in staging, recording hosted bookkeeping, queue delay, and actual provider acknowledgement separately. - Development failures retained: finalizer notification regressions (fixed; 27/27 affected cases passed), invalid browser admission fixture assumptions (fixed; browser coverage now passes 63/63), and first-head lifecycle/dispatch CI regressions (reproduced and repaired). A prior-head Cases E2E test hit its unchanged announcement-dismiss handler race while opening a filter; the same journey passed on `1ac9b58`. The external security review then found a stale-owner race between accounting commit and provider entry; final verification covers a competing run in that gap while retaining provider I/O outside the accounting lock. Early PostgreSQL startup attempts hit local semaphore pressure; serial reruns succeeded. The final-head Runner lane had one failure among 1,823 tests: the unchanged `timeout-attachment` fixture failed at its first process close after 6.28 seconds. The sole same-head job retry passed all 1,819 active tests (four skipped), including that fixture in 1.85 seconds. Three isolated local probes could not run correctly because the Rust fake-provider fixture binary was absent; cleanup masked the original startup failure. CI builds that fixture through its normal lane. These probes are inconclusive and are not counted as passes. ## Risks - This changes accounting, lifecycle, and cancellation ordering. Durable generations, source/sequence checks, ownership leases, and company locking remain required for correctness. - Provider stop acknowledgement can be slow or fail. Stop intent remains pending until existing termination proof succeeds; cancelled row status alone does not acknowledge delivery. - Mid-run limits depend on provider usage reports or supported price calculations. Providers that report only at completion cannot provide exact mid-call detection. - Signals are process-local wake hints for the supported single-active-writer model. Durable state and startup recovery remain authoritative. - There are no migrations, new queue tables, or cached balances. Repeat the classifier and controlled budget-stop acceptance after normal rollout. ## Model Used OpenAI Codex, based on GPT-6, with reasoning, tool use, code execution, and parallel coding agents. The host does not expose the exact backend model revision or context-window size, so those values are not asserted. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |
||
|
|
813e808af4 |
Remove filesystem history authorization from workspace preparation (#16963)
Remove physical-root source/reader authorization and sticky directory classifications from workspace preparation. Preserve current task/run authority, app-record privacy, credential authorization, containment, and lifecycle/publication integrity.
Validate replacement selections against persisted new inputs and refresh verified checkout ownership so bounded reuse survives earlier workspace relocation. Add real PostgreSQL/Git regressions, a reproducible history-scaling benchmark, and documentation.
Full CI passed all 48 jobs and Greptile scored 5/5 at
|
||
|
|
6bec153410 |
fix(runtime): retain cancelled workspaces before reconstruction (#16700)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - Native runs must preserve files when Stop ends a turn before its result is saved. > - The cancellation path could skip file retention and leave a prepared remote workspace active. > - An older controller could also admit an extra run while an earlier lost-source hold was unresolved. > - Rejecting every later run then prevented recovery even after that extra run was stopped and its files were reconciled. > - This change retains cancelled workspaces and records the exact proof for a safely reconciled intervening cancellation. > - Recovery can proceed without changing cancelled history, replaying actions, or weakening execution gates. ## Linked Issues or Issue Description Refs: #16583, #16690, #16696. **What happened?** Stop could acknowledge a native turn without recording its unsaved file obligation. Reconstruction also rejected a later cancelled run after its exact environment and files had been reconciled. The task could remain inactive with an `in_progress` status, which the reconstruction endpoint rejected. **Expected behavior** Retain unsaved files after Stop. Permit a board operator to reconstruct from saved sources only after each intervening cancellation has a confirmed stop and a file-only repair record. Preserve the original failed export and the cancelled run. **Steps to reproduce** 1. Prepare a native workspace and cancel the turn before a structured result exists. 2. Inspect its file retention and remote lease state. 3. For a task with an older destroyed export, reconcile the later cancelled run's exact files and unperformed actions. 4. Request reconstruction from verified same-task attachments. ## What Changed - Pin prepared native files before cancellation settlement. Defer teardown if pinning fails. Use the existing stop-only cleanup worker. - Repair active warm and ephemeral sources, plus stopping and confirmed-stopped historical cancellations in bounded startup and periodic batches. Preserve the existing exact-source checks. Bound row-lock waits and advance past a busy source. - Accept only same-owner native run-only cancellations with no result or current coordinator, confirmed stopped leases, and board file-only repair with `not_performed` action outcomes. - Save hashes of each intervening repair and recheck them at queue claim and final dispatch. Reject changed evidence or another later run. - Expose saved-source reconstruction in the issue API for inactive `blocked` and `in_progress` tasks, and hide it when an execution or checkout owner exists. Permit the same inactive source at submission. Keep the source, owner, version, attachment, budget, pause and retry checks. - Update the shared evidence type, recovery runbook and capability maps. Add an optional cancelled-native no-action confirmation to file recovery, resetting evidence when its source changes. No migration, new endpoint, permission or dependency. ## Verification - The new fixture fails on the original validator with `workspace_reconstruction_stale` after valid cancelled-run file repair. - Focused source and Stop retention tests: 94 passed before the final contention case. The subsequent three-suite run passed 123 tests, including real PostgreSQL lock contention and public startup/API/final-dispatch paths. The final narrow-query rerun passed all 123 tests. Review correction: all 143 tests passed across four suites, including real lock contention through the teardown boundary and stopping/stopped allocations. - Six broader cancellation, executor, heartbeat and restart suites: 831 passed, 9 existing skips. - Final correction: all 145 backend tests and all 36 recovery UI tests passed. Real contention covers both warm reusable and ephemeral sources. Optional no-action confirmation defaults to uncertified, and changing source clears evidence. Workspace `pnpm -r typecheck` and token gates passed on these sources. - Maps, module boundaries and Git whitespace checks: passed. Full `pnpm build` passed on the final `4e8c0e73ac` revision as well as the prior reviewed heads. A full local run of the preceding fix completed with 21,724 passes, 109 skips and three failures in webhook body limits, a status-card timeout, and a port-allocation fixture. All three suites then passed unchanged in an isolated rerun (209 tests). The full local run remains recorded as failed; the final head's full CI passed (55 completed checks, no failures). A fresh full local run is also in progress on the frozen reviewed head. - Preserved failures: the first attempt lacked a built plugin SDK; after building prerequisites, the regression reached the expected validator rejection. Treatment tests caught the file-only action's deliberately null continuation owner. A real lock test then caught the database driver's wrapped timeout error. Both defects were corrected and retested. Independent review then found a teardown race after a failed retention write. A second review found active warm sources excluded by the historical policy filter; the regression reproduced both warm failures before correcting the query. Its real-row-lock fixture reproduced the failure; the fixed release guard and historical stopping/stopped cases pass. No checks were weakened. - A pre-deployment walkthrough caught the issue API still hiding reconstruction for an inactive `in_progress` task. The status/capability baseline reproduced three failures, including inappropriate capability flags for execution/checkout owners. The fix uses the same inactive-state requirements as submission; its positive fixture reads the assembled issue API before reconstructing. All 117 tests in those three recovery suites pass, and all 28 heartbeat-recovery tests pass separately. Full workspace typecheck passed again. Full build passed with the exact `4e8c0e73ac` stamp; latest-head independent review is 5/5 with no open findings. All 55 latest-head checks completed with no failures. - Live tenant acceptance remains pending. No successful reconstruction, export or warm-process proof is claimed by these local tests. ## Risks - Stop retains unfinished work, so storage remains until file recovery and explicit cleanup complete. - Reconstruction remains held for unknown or performed external actions, foreign owners, live or rebound environments, accepted results, changed evidence, and unrelated later runs. - The sweep examines at most five candidates per pass. It uses a fair cursor and bounded transaction waits. It performs no provider call and starts no new turn. - Intervening verification reads only the needed JSON fields. The source transaction still serializes recovery for the same task. ## Model Used OpenAI Codex, GPT-6 family, with reasoning, tool use and code execution. The session does not expose an exact backend model ID or context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |
||
|
|
69ac928d2b |
fix(runtime): preserve bounded retries after workspace reconstruction (#16696)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - An operator can rebuild a destroyed workspace from saved task attachments. > - The first reconstruction run must pass current source and execution checks. > - A temporary bootstrap failure can create a bounded retry before provider work starts. > - The retry has a new run ID, so the first-run-only reconstruction check rejects it. > - This change verifies the retry chain back to the approved first run and keeps current safety checks. ## Linked Issues or Issue Description Refs #16690. **What happened?** After an operator records workspace reconstruction, a safe bootstrap retry is cancelled before provider startup. The normal retry scheduler creates the successor. The reconstruction check then rejects its immediate predecessor because it expects the original failed export run. **Expected behavior** A verified automatic retry can continue under the same reconstruction decision and remaining retry budget. Changed sources, unrelated executions, uncertain outcomes, pause and later human blocks must still stop startup. **Steps to reproduce** Record reconstruction with a retry budget remaining. Let its first run fail before provider work starts with recorded bootstrap evidence. Use the normal bounded retry scheduler and the locked dispatch gate. Before this change, the scheduler succeeds but dispatch returns false. ## What Changed - Verify the predecessor chain back to the recovery action's exact first continuation. - Check company, task, agent, terminal predecessor state and each scheduler-owned wake. Reject cycles, foreign parents and forged wakes. - Exclude only those verified predecessors from the unrelated-newer-run check. Keep source hashes, original result identity and all current execution gates. - Reuse the existing reconciliation proof for failed predecessors. Keep the original retry limit. - Add real PostgreSQL scheduler and assembled-heartbeat regressions. Update the recovery guide and feature map. ## Verification - The baseline regression failed at final dispatch after the normal retry scheduler created its successor. - The corrected focused group passes 133 tests across reconstruction, retry scheduling and dispatch. It admits two bounded bootstrap retries and refuses a third. The assembled heartbeat enters the provider once for an eligible retry and zero times after a controlled post-claim human block. - An intermediate negative case exposed missing predecessor-outcome validation. Reusing the existing reconciliation proof fixes it. Deleted sources, pause, forged wakes, foreign parents, unrelated runs and new recovery holds remain refused. - Full workspace typecheck and build pass on rebased head `bd301ec8a703fa1cdc9e1db2638440d203e8d57a`. The rebased focused group passes all 133 tests. All CI gates pass on that exact head, including general/serialized tests, Runner, build and browser gates. Greptile is 5/5 with no unresolved threads. A clean full local `pnpm test:run` is running; the local source stays frozen for that run. - Module boundaries, maps and diff whitespace checks pass. Live staging acceptance follows the qualified full Cloud deployment. - The earlier full local run for #16690 failed while files changed and its PATH hid `lsof`. All five affected suites then passed in a clean run: 246 passed, three skipped. Those results do not establish a full local pass for this follow-up. ## Risks - Retry ancestry is a rare recovery path. Its primary-key reads grow with the chain and stop at 64 predecessors. Ordinary runs perform no new ancestry reads. - Unknown effects and active recovery obligations stay held. This does not reset budgets, change provider lifecycle policy, grant access or replay completed actions. - No schema migration or new API is included. ## Model Used OpenAI Codex, GPT-6 family, with reasoning, tool use and code execution. The session does not expose an exact backend model ID or context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass (focused checks; full-run scope is recorded above) - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge Co-authored-by: Paperclip <noreply@paperclip.ing> |
||
|
|
7c7d2d8d2c |
fix(runtime): continue from saved sources after workspace loss (#16690)
## Thinking Path > - Paperclip is the open source app people use to manage AI agents for work. > - The runtime must preserve saved work and prevent duplicate execution. > - Older cleanup could destroy a sandbox before its workspace export finished. > - The existing recovery controls require either the original sandbox or recovered original files. > - Surviving attachments can support a rebuild, but they do not prove that missing edits were recovered. > - This pull request adds an explicit reconstruction decision and one fresh continuation through the normal execution gates. > - Operators can continue useful work while the original failed run remains truthful. ## Linked Issues or Issue Description **What happened?** A historical failed export can have an accepted result, a prepared workspace descriptor, and a confirmed destroyed sandbox. Its notice can also say `new_source_execution_path` and disappear. The task then has neither a truthful original-file repair path nor a supported reconstruction path. **Expected behavior** Keep the missing-file obligation visible. Let an authorized operator choose surviving task attachments and record lost work and external action outcomes. Start one fresh continuation after current execution checks. Keep the old result and failed export intact. **Steps to reproduce** 1. Seed a failed native export with a prepared descriptor and an exact destroyed-lease receipt. 2. Resolve its notice with the historical `new_source_execution_path` bookkeeping value. 3. Read the task. The baseline hides the hold even though no source reconciliation exists. 4. With this change, choose **Continue from saved sources** and submit a reconstruction decision. Related public work: #16451 preserves healthy warm sessions. #16583 prevents destructive cleanup of unexported work. This change handles historical source loss that those fixes cannot undo. Searches of open and closed work found no equivalent reconstruction endpoint. ## What Changed - Add a board-only reconstruction endpoint with `runtime:manage` and task visibility checks. - Validate the exact run, result, descriptor and destroyed lease. Reject active copyback, competing owners, newer work, stale task status, and foreign attachments. - Record attachment hashes, missing work, and external action outcomes. Preserve the original failed run, accepted result, prepared descriptor and terminal failure. - Hold other continuation paths until the durable reconstruction intent admits its successor. Record that successor in the same transaction and preserve the retry count. - Add an operator control that distinguishes reconstruction from original-file recovery. Update the recovery runbook and capability maps. ## Verification - Exact baseline source returns no blocker for the destroyed-source fixture. The same fixture returns a required recovery hold with this change. - New real PostgreSQL and assembled API/heartbeat suite: 25/25 pass. It covers duplicate submissions, lost acknowledgement, context reset, source identity, task ownership, concurrent execution attachment scope, later human blocks, deleted sources and agent pause. - Existing export retry, explicit continuation and recovery-action suites: 386 cases pass. One new-fixture constraint error in the combined run was corrected; the full new suite then passed. - UI recovery suites: 46/46 pass across three files. They cover disabled actions, loss acknowledgement, failure retention and runtime authority. - `pnpm -r typecheck` and `pnpm build` pass. The first sandboxed typecheck attempt could not open the TypeScript IPC socket; the authorized rerun passed. - Module boundaries, map checks, token gates and diff whitespace checks pass. - OpenAPI route coverage: 21/21 pass. The first CI head exposed a missing endpoint registration; this head adds the registration and the focused suite passes. - Review identified a missing dispatch-time check and an isolated attachment cache. Both are fixed. Claim and final handoff recheck the exact successor, sources and current execution gates. A controlled post-claim operator block prevents the assembled heartbeat from entering the provider. The shared attachment cache refreshes uploads and removes deleted selections. - Final focused run: 180/180 pass across six suites, including reconstruction, existing dispatch/stale-queue contracts and UI recovery. - A second review reproduced cancellation by an already satisfied historical connection card while the task was `todo`. Read-only connection availability now works before checkout; active-task mutation checks remain strict. The baseline failed two cases; after the fix all 74 connection and reconstruction tests pass, including revoked access, pending questions and pending approvals. - All current-head CI gates pass on `9d197236da11fa24f1ceadf5589cb2b81179d824`, including general/serialized tests, Runner, build and browser gates. Greptile is 5/5 for that exact head with no unresolved threads. The full local `pnpm test:run` is still running its serial server group; no full local pass is claimed. Live staging recovery is pending deployment. ## Risks - Reconstruction cannot restore missing bytes. The operator must identify surviving sources and actions that must not be repeated. The agent must verify those attachments before rebuilding. - This path is limited to exact, confirmed destroyed remote sources with an accepted result. Retained or uncertain sources keep their existing repair path. - No schema migration, credential change, budget increase or warm-session policy change is included. Normal pause, ownership, budget, approval and dispatch gates still apply. ## Model Used OpenAI Codex, GPT-6 family, with reasoning, tool use and code execution. The session does not expose an exact backend model ID or context-window size. ## Checklist - [x] I have included a thinking path that traces from project context to this change - [x] I have specified the model used (with version and capability details) - [x] I have checked ROADMAP.md and confirmed this PR does not duplicate planned core work - [x] I have searched GitHub for duplicate or related PRs and linked them above - [x] I have either (a) linked existing issues with `Fixes: #` / `Closes #` / `Refs #` OR (b) described the issue in-PR following the relevant issue template - [x] I have not referenced internal/instance-local Paperclip issues or links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip` URLs) - [x] My branch name describes the change (e.g. `docs/...`, `fix/...`) and contains no internal Paperclip ticket id or instance-derived details - [x] I have run tests locally and they pass (focused suites; full local run limitation recorded above) - [x] I have added or updated tests where applicable - [x] I have updated relevant documentation to reflect my changes - [x] I have considered and documented any risks above - [x] All Paperclip CI gates are green - [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups - [x] I will address all Greptile and reviewer comments before requesting merge --------- Co-authored-by: Paperclip <noreply@paperclip.ing> |