fix(runner): settle accepted results after shutdown failures (#15217)

## Thinking Path

> - Paperclip manages AI agents and the tasks they perform.
> - The native runner saves tool results and completion reports before
it releases a session.
> - Large project discovery responses can exceed the durable command
limit.
> - A shutdown failure can leave a saved answer waiting for workspace
repair.
> - Recovery reused the old assessment for a different status decision,
which violated a database constraint.
> - This pull request bounds discovery responses and lets recovery
commit the saved result after workspace repair.
> - The benefit is a task that reaches its correct final status without
another provider turn.

## Linked Issues or Issue Description

**What happened?**

A native run can save its final answer, fail during shutdown, and leave
the task In Progress after workspace repair succeeds. Reconciliation
tries to reuse the failed-workspace assessment for a new decision. The
one-decision-per-assessment constraint rejects the write. Replaying the
old decision can also retain a fresh coordinator lease. Separately,
retained session cleanup only recognizes the old `adapter_failed` label.

The project-list tool returns full project records, including large
descriptions and workspace configuration. A large response exceeds the
runner's durable command limit. The settlement diagnostic previously
recorded only a failure flag.

**Expected behavior**

Project discovery stays within the command limit. Recovery finishes the
saved result after workspace repair, releases its lease, and preserves
the original error for inspection. It does not repeat provider work or
relax session ownership checks.

**Steps to reproduce**

1. Return large project records from `list_projects` and observe an
oversized semantic result.
2. Persist an accepted native completion result, then record a shutdown
failure.
3. Finalize with a failed workspace, repeat that attempt, then record
successful workspace repair.
4. Reconcile the run. Before this fix, the issue stays In Progress.

**Paperclip version or commit**

Reproduced on `a386a599983519eb1d399f8b770bfccdb2a74762`.

**Deployment mode**

Self-hosted server with Paperclip Runner.

Related transport work: #12208 drains queued events; #12241 resumes
interrupted semantic calls. This change addresses bounded project
discovery and accepted-result finalization.

## What Changed

- Read bounded project summary projections from the database and return
at most 50 authorized summaries with a continuation cursor and explicit
description truncation. Agent and run trust boundaries narrow the
database candidates; project-specific policies still receive full
authorization. Only visible projects determine continuations. The
default project-list API remains unchanged.
- Record bounded, content-free settlement failure causes for command
limits, storage errors, and rejected dispatch.
- Include workspace state in assessment identity. Preserve the initial
assessment for interrupted finalization, and commit replacement
assessment and decision references together.
- Release the coordinator lease when an existing decision is replayed,
without repeating its effects.
- Clear stale errors when recovery succeeds and retain them in
`recoveredExecutionFailure`.
- Accept both current and legacy close-failure labels in the existing
exact-state cleanup path.
- Add regression tests and update the tool contracts and recovery
documentation.

## Verification

- Red: the new project paging, settlement diagnostic, current cleanup
label, and repaired-workspace regressions failed on the original
implementation.
- Green: protocol/catalog/tool checks (117 tests), the full project-tool
and finalizer suites (47 tests), cleanup ownership cases (70 tests), and
cleanup sweep cases (4 tests) pass. Database-backed pagination covers
large descriptions/configuration, complete enumeration, uppercase
cursors, agent/run restrictions, project-policy scope contributions, and
identical results/cursors when hidden projects are added.
- The initial CI failures in interrupted Board waits, contended endpoint
proof, and semantic schema validation were reproduced and fixed; all
affected cases pass locally.
- `pnpm -r typecheck` — passed.
- `pnpm build` — passed.
- `pnpm test:run` — started before the review corrections; it spanned
several source revisions and was stopped after reporting old-behavior
and timing failures. It is not claimed green. Fresh project and recovery
suites pass; the recovery suite also passes all 25 cases with the broad
runner’s isolated home/config. The Slack timing case passed in
isolation. Latest-head CI is the authoritative complete test matrix.
- Existing authorization suite — 66 tests passed.
- Latest-head CI on `8e5763d915aa6f375bdab6601996899ea01496fc` — 55
checks passed, 4 intentionally skipped, no pending or failing checks.
- Greptile — 5/5, zero unresolved threads on the same commit.
- `git diff --check` — passed.

## Risks

- `list_projects` now returns summaries. Callers must follow
`nextCursor` and use the authorized project API for full records.
Candidate narrowing is only an optimization: project policy and
responsible-user authorization remain authoritative.
- Assessment identity changes for workspace finalization. Existing
evidence remains intact; no migration is needed.
- Cleanup still requires matching identities, settled tool evidence, and
verified process ownership. Unknown tool outcomes remain blocked from
session reuse.

## Model Used

OpenAI Codex, based on GPT-6, with reasoning, code execution, and GitHub
tools. The exact serving model ID and context window are not exposed in
this session.

## Checklist

- [x] I have included a thinking path that traces from project context
to this change
- [x] I have specified the model used (with version and capability
details)
- [x] I have checked ROADMAP.md and confirmed this PR does not duplicate
planned core work
- [x] I have searched GitHub for duplicate or related PRs and linked
them above
- [x] I have either (a) linked existing issues with `Fixes: #` / `Closes
#` / `Refs #` OR (b) described the issue in-PR following the relevant
issue template
- [x] I have not referenced internal/instance-local Paperclip issues or
links (only public GitHub `#NNN` / `github.com/paperclipai/paperclip`
URLs)
- [x] My branch name describes the change (e.g. `docs/...`, `fix/...`)
and contains no internal Paperclip ticket id or instance-derived details
- [x] I have run tests locally and they pass
- [x] I have added or updated tests where applicable
- [x] I have updated relevant documentation to reflect my changes
- [x] I have considered and documented any risks above
- [x] All Paperclip CI gates are green
- [x] Greptile is 5/5 with no open P2s, recommendations, or follow-ups
- [x] I will address all Greptile and reviewer comments before
requesting merge

---------

Co-authored-by: Paperclip <noreply@paperclip.ing>
This commit is contained in:
DottaandPaperclip authored and GitHub committed 2026-10-05 10:31:11 -05:00
1 parent a386a59998
commit a65ca09508
30 files changed
+434 -117

No files matched your search

+23
View File
@@ -1216,6 +1216,29 @@ the updated sandbox image with the matching runner qualification changes.
### Native runner restart recovery
Project discovery through `list_projects` returns up to 50 compact summaries.
It uses `GET /api/companies/:companyId/projects?view=summary&limit=50&cursor=...`;
the cursor is optional. The database reads bounded summary projections. Agent
and run trust boundaries narrow database candidates before per-project access
checks. Projects with their own authorization policy remain candidates because
that policy can contribute scope; every result still passes the full access check.
Only visible projects determine page boundaries and continuations.
The default project-list API response remains unchanged.
Use its `nextCursor` as the next call's `cursor` until it is null; `limit` accepts
1–50. Descriptions include at most 1,000 characters and an explicit truncation
flag. Full project records remain available through the authorized project API.
Workspace configuration is excluded from discovery responses so large projects
cannot overflow the runner's durable tool-result command limit.
When an accepted result survives a shutdown failure, workspace repair uses a
new assessment for the repaired workspace state. Its status decision and
assessment reference commit together. Recovery completes from the saved result
without another provider turn, clears stale successful-run errors, and retains
the original error in `recoveredExecutionFailure`. Exact-state session cleanup
recognizes both the legacy `adapter_failed` and current `provider_transport_failed`
close-failure labels. Process ownership, pending tool outcomes, and checkpoint
verification still control whether that session can be reused.
Paperclip Runner keeps its heartbeat run, native session, logical runner, and
provider session identities across server restarts. A coordinated hot restart
registers a correlated recovery request before it signals the dev supervisor.
+7
View File
@@ -52,6 +52,13 @@ and incomplete result-delivery command IDs and statuses. If execution and
cleanup both fail, execution retains its original error identity and cleanup is
attached as `cleanupError`.
Semantic settlement also includes up to 20 content-free failure records, with
the call ID, operation ID, stage (`dispatch` or `persist_result`), and cause.
Causes distinguish an oversized command, a full command journal, known storage
errors, dispatcher rejection, and other persistence failures. Exception messages
and tool results are excluded. These diagnostics do not authorize replay of an
operation whose outcome is unknown.
Instruction writes also commit an `agent.instruction_write_attempted` activity
row and a run-scoped `instructionToolAttempts` entry before permitting the
filesystem effect. They retain the call ID, operation ID, and input digest, not