From 4440df2e44e346080308e40ec3287c94c7f776a2 Mon Sep 17 00:00:00 2001 From: Dotta Date: Mon, 12 Oct 2026 19:31:40 -0500 Subject: [PATCH] docs: distinguish passing ownership proof from resume fixture deadline Co-Authored-By: Paperclip --- doc/plans/2026-10-12-claude-runner-default.md | 23 +++++++++++++++++++ 1 file changed, 23 insertions(+) diff --git a/doc/plans/2026-10-12-claude-runner-default.md b/doc/plans/2026-10-12-claude-runner-default.md index 7f3d189bc64..1aa4863c0bd 100644 --- a/doc/plans/2026-10-12-claude-runner-default.md +++ b/doc/plans/2026-10-12-claude-runner-default.md @@ -591,3 +591,26 @@ from the source chat as current-chat authorization; the direct coordination question remains pending. Public PR/evidence updates continue within this task. Fresh exact-head cloud runner/native execution is required, including the failing late-bootstrap case. No package campaign or new paid task has been dispatched. + +## Current cloud ownership proof and durable test envelope — 2026-10-12 + +Behavior `be0e68872fd5e043bc6242e0634471b2c1794336` passed all 54 current +checks plus two conditional skips, required verify/E2E and fresh 5/5 review. +Protocol `463ebb62661d81ef1fbd79ae0a7b43ece68830f8` and platform +`66925e79c9d9e8f7e51fd9ee5a518a778d34acf8` passed the previously failing +real late-bootstrap case and the new ownership controls. Their remaining runner +lane failure was a different fake-transport durable-resume case: it reached the +outer 5000 ms test timeout (1599 passed, one failed, three skipped). There was no +ENOTEMPTY or primary semantic assertion failure in those runs. The exact cloud +latency stage was not recorded and is not labeled an infrastructure flake. + +That fixture deliberately includes a 500 ms killed turn, a resumed turn with its +own 5000 ms bound, and durable filesystem writes. A controlled 3800 ms resumed- +turn delay (within the existing turn bound) reproduces the outer 5000 ms timeout; +the identical treatment completes its semantic/usage/deduplication assertions +with a 15000 ms outer budget. The temporary delay was removed. Only the outer +fixture deadline and its rationale are committed; internal deadlines and all +assertions remain unchanged. The full fake-transport suite passes 72 with one +existing skip; runner noemit and maps pass. Fresh exact-head runner CI remains +required after this test-only correction. No package campaign, paid provider +call, local native build, Docker build or upstream prerequisite edit.