From 2fa52f670192cb7872972d36dc8a1c384a86c2b2 Mon Sep 17 00:00:00 2001 From: Dotta Date: Mon, 12 Oct 2026 22:14:44 -0500 Subject: [PATCH] docs: retain preview restart and shared timeout evidence Co-Authored-By: Paperclip --- doc/plans/2026-10-12-claude-runner-default.md | 20 ++++++++++++++++++- 1 file changed, 19 insertions(+), 1 deletion(-) diff --git a/doc/plans/2026-10-12-claude-runner-default.md b/doc/plans/2026-10-12-claude-runner-default.md index e18dc5d1879..4f2b08e66d1 100644 --- a/doc/plans/2026-10-12-claude-runner-default.md +++ b/doc/plans/2026-10-12-claude-runner-default.md @@ -793,7 +793,7 @@ additive merges, retaining the Claude settings and immutable profile changes: The existing published PR heads remain unchanged. The root-owned Codex branch still needs the same current-master dependency before the protocol can meet its -review file limit. Canonical 16a's fresh CI has one failing runner test, which its +review file limit. Canonical 16a's fresh CI has two failing runner cases, which its owner is investigating; earlier 64c074fb success is not carried forward as a 16a pass. The source owner's provider-free cloud qualification is separate from the final Claude package campaign. @@ -827,3 +827,21 @@ frozen Codex dependency, fresh checks/review on all three published slices, four-target cloud packages and clean consumers, and current installed-runtime acceptance within the existing $50 ceiling. Unknown-charge holds remain intact. Merging and production deployment remain separate actions. + +The retained preview stopped listening during the integration hold. Restarting +the same installed launcher restored health without changing its source/runtime +or isolated data. Read-only checks confirmed native Claude / Opus 5.5, the completed +x64 acceptance task, `enableNativeRunner=false`, and zero live runs in all six +checked QA companies. No task prompt was submitted. Receipt: +`/private/tmp/claude-retained-preview-restart-receipt.json`; launcher log: +`/private/tmp/claude-retained-preview-restart.log`. These checks confirm persistence +and preview availability, not qualification of the current source composition. + +The source owner identified the same durable-resume outer-deadline failure in +canonical 16a and requested reuse of correction +`c60bf4b6b9ee7a6052ae9c95bd10fef90f3418f7`. Its single semantic test change is +the 15000 ms outer budget; the old explanatory comments have since been removed +under the contribution rules. The controlled before/after receipts and full +72-pass/one-skip suite remain the evidence stated above. The separate callback +fixture failure is being diagnosed by the source owner and is not covered by +that correction.